X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776082403000

Well Details

Well ID: 0776082403000
Loading map...
Location: 00/03-24-077-08W6/0
Location Alias: 00/03-24-77-08 W6M
Location Alias 2: 00/03-24-077-08 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 08
Section: 24
County/Municipality: Saddle Hills County
Well Name: TOURMALINE HZ VALHALLA 3-24-77-8
Operator Name: Tourmaline Oil Corp.
License Number: 0489566
License Date: 2018-06-14
License Status: Amended
Spud Date: 2018-07-30
Final Drill Date: 2018-09-03
Well Total Depth: 3929.00 m
Surface Hole Latitude: 55.676587
Surface Hole Longitude: -119.069336

For data sources see[1][2]

Well History

Date Event
2018-06-14 Obtained License
2018-07-31 Surface Casing Operation Performed
2018-08-25 Direction Drilling Operation Performed - Deviate
2018-08-27 Direction Drilling Operation Performed - Horizontal
2018-08-29 Intermediate Casing Operation Performed
2018-09-03 Finished Drilling
2018-09-03 Well Log Performed
2018-09-03 Well Mode changed to Drilled and Cased
2018-09-04 Liner Casing Operation Performed
2018-09-04 Rig Released
2018-09-28 Perforation Treatment Performed - Multi-Stage Fracture
2018-12-05 Well Began Production
2018-12-05 Well Fluid changed to Crude Oil
2018-12-05 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-08-30 Precision Drilling Corporation 226 N/A Resumption
2018-07-30 Precision Drilling Corporation 226 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-08-25 664.60 Deviate (5 - 79 degrees)
2018-08-27 2017.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-09-28 Multi-Stage Fracture 3899.40 3899.50 0
2018-09-28 Multi-Stage Fracture 3405.30 3405.40 0
2018-09-28 Multi-Stage Fracture 3346.90 3347.00 0
2018-09-28 Multi-Stage Fracture 3287.80 3287.90 0
2018-09-28 Multi-Stage Fracture 3229.30 3229.40 0
2018-09-28 Multi-Stage Fracture 3170.90 3171.00 0
2018-09-28 Multi-Stage Fracture 3111.80 3111.90 0
2018-09-28 Multi-Stage Fracture 3053.10 3053.20 0
2018-09-28 Multi-Stage Fracture 2753.60 2753.70 0
2018-09-28 Multi-Stage Fracture 2695.10 2695.20 0
2018-09-28 Multi-Stage Fracture 2638.20 2638.30 0
2018-09-28 Multi-Stage Fracture 3870.30 3870.40 0
2018-09-28 Multi-Stage Fracture 2579.80 2579.90 0
2018-09-28 Multi-Stage Fracture 2521.40 2521.50 0
2018-09-28 Multi-Stage Fracture 2463.20 2463.30 0
2018-09-28 Multi-Stage Fracture 2405.10 2405.20 0
2018-09-28 Multi-Stage Fracture 2349.40 2349.50 0
2018-09-28 Multi-Stage Fracture 2291.40 2291.50 0
2018-09-28 Multi-Stage Fracture 2232.40 2232.50 0
2018-09-28 Multi-Stage Fracture 2173.50 2173.60 0
2018-09-28 Multi-Stage Fracture 2114.50 2114.60 0
2018-09-28 Multi-Stage Fracture 3810.90 3811.00 0
2018-09-28 Multi-Stage Fracture 3753.80 3753.90 0
2018-09-28 Multi-Stage Fracture 3696.20 3696.30 0
2018-09-28 Multi-Stage Fracture 3638.10 3638.20 0
2018-09-28 Multi-Stage Fracture 3580.60 3580.70 0
2018-09-28 Multi-Stage Fracture 3522.80 3522.90 0
2018-09-28 Multi-Stage Fracture 3463.90 3464.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-09-28 2018-09-28 1,800 5,137 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 92.15 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 7.1752 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 0.5218 N/A
WBO-2 Trican Breaker sodium persulfate 7775-27-1 100 0.0205 N/A
FR-23 Trican Friction Reducer acrylamide modified polymer 9972 100 0.0796 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0796 N/A
non-hazardous ingredients Not Available 100 0.0796 N/A
PFC-3 Trican Surfactant aminofunctional polymer 10352 100 0.0418 N/A
glycol ether 10352 100 0.0418 N/A
petroleum distillates 10352 100 0.0418 N/A
silicon compound 10352 100 0.0418 N/A
S-17X Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0294 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.0294 N/A
methanol 67-56-1 100 0.0294 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.0294 N/A
non-hazardous ingredients Not Available 100 0.0294 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-09-28 2018-09-29 Surface Water - Runoff 5137

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 608 0.0 0.0 0.0
2019 7724 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-09-03 No Incident Encountered 0.00 0.00
2018-10-05 No Incident Encountered 0.00 0.00

For data sources see[10]

References