If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776073406022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.719081,"lon":-119.01012,"icon":""}]} |
Location: 02/06-34-077-07W6/2 | |
Location Alias: 02/06-34-77-07 W6M | |
Location Alias 2: 02/06-34-077-07 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 07 | |
Section: 34 | |
County/Municipality: Saddle Hills County | |
Well Name: TOURMALINE 102HZ VALHALLA 12-34-77-7 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0421339 | |
License Date: 2010-06-22 | |
License Status: Amended | |
Spud Date: 2010-07-26 | |
Final Drill Date: 2010-08-22 | |
Well Total Depth: 2559.00 m | |
Surface Hole Latitude: 55.719081 | |
Surface Hole Longitude: -119.010120 |
Date | Event |
---|---|
2010-06-22 | Obtained License |
2010-08-10 | Direction Drilling Operation Performed - Horizontal |
2010-08-14 | Intermediate Casing Operation Performed |
2010-08-22 | Finished Drilling |
2010-08-22 | Well Log Performed |
2010-08-22 | Well Mode changed to Drilled and Cased |
2010-08-23 | Production Casing Operation Performed |
2010-08-24 | Rig Released |
2010-09-17 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2010-09-17 | Perforation Treatment Performed - Fractured |
2010-09-18 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2010-09-18 | Perforation Treatment Performed - Fractured |
2010-09-19 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2010-09-19 | Perforation Treatment Performed - Fractured |
2010-09-20 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2010-09-20 | Perforation Treatment Performed - Fractured |
2010-09-20 | Perforation Treatment Performed - Jet Perforation |
2010-09-23 | Perforation Treatment Performed - Fractured |
2010-09-23 | Perforation Treatment Performed - Jet Perforation |
2010-09-25 | Perforation Treatment Performed - Fractured |
2010-09-28 | Well Log Performed |
2010-10-02 | Well Began Production |
2010-10-02 | Well Fluid changed to Crude Oil |
2010-10-02 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-08-10 | 1240.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-09-17 | Hydra Jet Perforation | 2539.50 | 2539.60 | 4 |
2010-09-19 | Fracture | 2333.00 | 2333.10 | 0 |
2010-09-19 | Hydra Jet Perforation | 2262.00 | 2262.10 | 4 |
2010-09-19 | Fracture | 2262.00 | 2262.10 | 0 |
2010-09-20 | Hydra Jet Perforation | 2192.00 | 2192.10 | 4 |
2010-09-20 | Fracture | 2192.00 | 2192.10 | 0 |
2010-09-20 | Perforation | 2122.00 | 2123.00 | 4 |
2010-09-20 | Perforation | 2052.00 | 2053.00 | 4 |
2010-09-20 | Perforation | 1982.00 | 1983.00 | 4 |
2010-09-20 | Perforation | 1912.00 | 1913.00 | 4 |
2010-09-23 | Fracture | 1912.00 | 2123.00 | 0 |
2010-09-17 | Fracture | 2539.50 | 2539.60 | 0 |
2010-09-23 | Perforation | 1842.00 | 1843.00 | 4 |
2010-09-23 | Perforation | 1772.00 | 1773.00 | 4 |
2010-09-23 | Perforation | 1702.00 | 1703.00 | 4 |
2010-09-23 | Perforation | 1632.00 | 1633.00 | 4 |
2010-09-25 | Fracture | 1632.00 | 1843.00 | 0 |
2010-09-18 | Hydra Jet Perforation | 2472.00 | 2472.10 | 4 |
2010-09-18 | Fracture | 2472.00 | 2472.10 | 0 |
2010-09-18 | Hydra Jet Perforation | 2404.50 | 2404.60 | 4 |
2010-09-19 | Fracture | 2404.50 | 2404.60 | 0 |
2010-09-19 | Hydra Jet Perforation | 2406.00 | 2406.10 | 4 |
2010-09-19 | Fracture | 2406.00 | 2406.10 | 0 |
2010-09-19 | Hydra Jet Perforation | 2333.00 | 2333.10 | 4 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 1938 | 0.0 | 0.0 | 0.0 |
2011 | 5538 | 0.0 | 0.0 | 0.0 |
2012 | 3909 | 0.0 | 0.0 | 0.0 |
2013 | 4973 | 0.0 | 0.0 | 0.0 |
2014 | 7248 | 0.0 | 0.0 | 0.0 |
2015 | 8348 | 0.0 | 0.0 | 0.0 |
2016 | 8640 | 0.0 | 0.0 | 0.0 |
2017 | 8221 | 0.0 | 0.0 | 0.0 |
2018 | 8731 | 0.0 | 0.0 | 0.0 |
2019 | 1739 | 0.0 | 0.0 | 0.0 |
For data sources see[6]