If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776073405000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.722385,"lon":-119.022622,"icon":""}]} |
Location: 00/05-34-077-07W6/0 | |
Location Alias: 00/05-34-77-07 W6M | |
Location Alias 2: 00/05-34-077-07 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 07 | |
Section: 34 | |
County/Municipality: Saddle Hills County | |
Well Name: TOURMALINE HZ VALHALLA 5-34-77-7 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0439315 | |
License Date: 2011-11-22 | |
License Status: Amended | |
Spud Date: 2011-12-22 | |
Final Drill Date: 2012-01-03 | |
Well Total Depth: 2993.00 m | |
Surface Hole Latitude: 55.722385 | |
Surface Hole Longitude: -119.022622 |
Date | Event |
---|---|
2011-11-22 | Obtained License |
2011-12-24 | Surface Casing Operation Performed |
2011-12-26 | Direction Drilling Operation Performed - Horizontal |
2011-12-26 | Well Log Performed |
2012-01-03 | Finished Drilling |
2012-01-03 | Well Mode changed to Drilled and Cased |
2012-01-05 | Production Casing Operation Performed |
2012-01-06 | Rig Released |
2012-01-12 | Well Log Performed |
2012-01-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-01-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-01-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-01-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-01-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-01-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-01-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-01-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-01 | Well Began Production |
2012-03-01 | Well Fluid changed to Crude Oil |
2012-03-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-12-26 | 1229.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-01-15 | Multi-Stage Fracture | 2973.00 | 2973.10 | 0 |
2012-01-17 | Multi-Stage Fracture | 2541.70 | 2541.80 | 0 |
2012-01-17 | Multi-Stage Fracture | 2494.40 | 2494.50 | 0 |
2012-01-17 | Multi-Stage Fracture | 2446.40 | 2446.50 | 0 |
2012-01-17 | Multi-Stage Fracture | 2397.80 | 2397.90 | 0 |
2012-01-17 | Multi-Stage Fracture | 2350.20 | 2350.30 | 0 |
2012-01-17 | Multi-Stage Fracture | 2306.20 | 2306.30 | 0 |
2012-01-19 | Multi-Stage Fracture | 2258.00 | 2258.10 | 0 |
2012-01-20 | Multi-Stage Fracture | 2210.40 | 2210.50 | 0 |
2012-01-20 | Multi-Stage Fracture | 2106.00 | 2106.10 | 0 |
2012-01-21 | Multi-Stage Fracture | 2047.00 | 2047.10 | 0 |
2012-01-15 | Multi-Stage Fracture | 2921.90 | 2922.00 | 0 |
2012-01-21 | Multi-Stage Fracture | 2000.00 | 2000.10 | 0 |
2012-01-21 | Multi-Stage Fracture | 1953.00 | 1953.10 | 0 |
2012-01-21 | Multi-Stage Fracture | 1905.00 | 1905.10 | 0 |
2012-01-21 | Multi-Stage Fracture | 1857.00 | 1857.10 | 0 |
2012-01-22 | Multi-Stage Fracture | 1809.00 | 1809.10 | 0 |
2012-01-22 | Multi-Stage Fracture | 1762.00 | 1762.10 | 0 |
2012-01-22 | Multi-Stage Fracture | 1714.00 | 1714.10 | 0 |
2012-01-23 | Multi-Stage Fracture | 1666.00 | 1666.10 | 0 |
2012-01-23 | Multi-Stage Fracture | 1618.00 | 1618.10 | 0 |
2012-01-16 | Multi-Stage Fracture | 2874.00 | 2874.10 | 0 |
2012-01-16 | Multi-Stage Fracture | 2826.80 | 2826.90 | 0 |
2012-01-16 | Multi-Stage Fracture | 2779.10 | 2779.20 | 0 |
2012-01-16 | Multi-Stage Fracture | 2734.60 | 2734.70 | 0 |
2012-01-16 | Multi-Stage Fracture | 2676.00 | 2676.10 | 0 |
2012-01-16 | Multi-Stage Fracture | 2640.40 | 2640.50 | 0 |
2012-01-16 | Multi-Stage Fracture | 2583.00 | 2583.10 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 3560 | 0.0 | 0.0 | 0.0 |
2013 | 7435 | 0.0 | 0.0 | 0.0 |
2014 | 7369 | 0.0 | 0.0 | 0.0 |
2015 | 8551 | 0.0 | 0.0 | 0.0 |
2016 | 8378 | 0.0 | 0.0 | 0.0 |
2017 | 6981 | 0.0 | 0.0 | 0.0 |
2019 | 7515 | 0.0 | 0.0 | 0.0 |
For data sources see[6]