X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776073301030

Well Details

Well ID: 0776073301030
Loading map...
Location: 03/01-33-077-07W6/0
Location Alias: 03/01-33-77-07 W6M
Location Alias 2: 03/01-33-077-07 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 07
Section: 33
County/Municipality: Saddle Hills County
Well Name: TOURMALINE HZ 103 VALHALLA 1-33-77-7
Operator Name: Tourmaline Oil Corp.
License Number: 0475507
License Date: 2015-05-13
License Status: Issued
Spud Date: 2015-07-20
Final Drill Date: 2015-08-06
Well Total Depth: 3675.00 m
Surface Hole Latitude: 55.700884
Surface Hole Longitude: -118.980857

For data sources see[1][2]

Well History

Date Event
2015-05-13 Obtained License
2015-07-22 Surface Casing Operation Performed
2015-07-25 Direction Drilling Operation Performed - Deviate
2015-07-27 Direction Drilling Operation Performed - Horizontal
2015-08-01 Intermediate Casing Operation Performed
2015-08-06 Finished Drilling
2015-08-06 Well Log Performed
2015-08-06 Well Mode changed to Drilled and Cased
2015-08-07 Liner Casing Operation Performed
2015-08-08 Rig Released
2015-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-09-11 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-17 Well Began Production
2015-09-17 Well Fluid changed to Crude Oil
2015-09-17 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-07-20 Ironhand Drilling Inc. 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-07-25 1222.90 Deviate (5 - 79 degrees)
2015-07-27 1672.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-09-11 Multi-Stage Fracture 3647.00 3647.10 0
2015-09-11 Multi-Stage Fracture 3115.10 3115.20 0
2015-09-11 Multi-Stage Fracture 3042.30 3042.40 0
2015-09-11 Multi-Stage Fracture 2983.40 2983.50 0
2015-09-11 Multi-Stage Fracture 2910.30 2910.40 0
2015-09-11 Multi-Stage Fracture 2837.30 2837.40 0
2015-09-11 Multi-Stage Fracture 2765.60 2765.70 0
2015-09-11 Multi-Stage Fracture 2707.00 2707.10 0
2015-09-11 Multi-Stage Fracture 2634.40 2634.50 0
2015-09-11 Multi-Stage Fracture 2561.30 2561.40 0
2015-09-11 Multi-Stage Fracture 2502.20 2502.30 0
2015-09-11 Acid Treatment 3647.00 3647.10 0
2015-09-11 Multi-Stage Fracture 2428.70 2428.80 0
2015-09-11 Multi-Stage Fracture 2355.60 2355.70 0
2015-09-11 Multi-Stage Fracture 2297.10 2297.20 0
2015-09-11 Multi-Stage Fracture 2223.70 2223.80 0
2015-09-11 Multi-Stage Fracture 2150.40 2150.50 0
2015-09-11 Multi-Stage Fracture 2076.80 2076.90 0
2015-09-11 Multi-Stage Fracture 2018.30 2018.40 0
2015-09-11 Multi-Stage Fracture 1959.10 1959.20 0
2015-09-11 Multi-Stage Fracture 3598.20 3598.30 0
2015-09-11 Multi-Stage Fracture 3527.10 3527.20 0
2015-09-11 Multi-Stage Fracture 3468.20 3468.30 0
2015-09-11 Multi-Stage Fracture 3395.50 3395.60 0
2015-09-11 Multi-Stage Fracture 3322.10 3322.20 0
2015-09-11 Multi-Stage Fracture 3248.30 3248.40 0
2015-09-11 Multi-Stage Fracture 3188.70 3188.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-09-11 2015-09-11 1,532 4,007 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 87.741 N/A
Sand (20/40) Ottawa Canyon Aluminum Oxide 1344-28-1 100 5.7219 N/A
Crystalline silica. quartz 14808-60-7 100 5.7219 N/A
Iron Oxide 1309-37-1 100 5.7219 N/A
Titanium Oxide 13463-67-7 100 5.7219 N/A
Sand (50/140) Canyon Aluminum Oxide 1344-28-1 100 1.1443 N/A
Crystalline silica. quartz 14808-60-7 100 1.1443 N/A
Iron Oxide 1309-37-1 100 1.1443 N/A
Titanium Oxide 13463-67-7 100 1.1442 N/A
SiberProp (20/40) Canyon Crystalline silica. quartz 14808-60-7 100 5.1497 N/A
Phenol formaldehyde resin 9003-35-4 100 5.1497 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0133 N/A
Water 7732-18-5 100 0.0133 N/A
CAN-1912 Clay Stabilizer (HT) Canyon Clay Control No hazardous ingredients Not Available 100 0.0983 N/A
CAN-2410 Demulsifier Canyon Demulsifier Methyl Alcohol 67-56-1 100 0.0833 N/A
Water 7732-18-5 100 0.0833 N/A
CAN-2057 Friction Reducer Canyon Gelling Agent No hazardous ingredients Not Available 100 0.0476 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-09-10 2015-09-10 Surface Water - Runoff 1398
2015-09-11 2015-09-11 Surface Water - Runoff 2600

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 1919 0.0 0.0 0.0
2016 8221 0.0 0.0 0.0
2017 8347 0.0 0.0 0.0
2018 6393 0.0 0.0 0.0
2019 7655 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-08-06 No Incident Encountered 0.00 0.00
2015-09-21 No Incident Encountered 0.00 0.00

For data sources see[10]

References