X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776072905000

Well Details

Well ID: 0776072905000
Loading map...
Location: 00/05-29-077-07W6/0
Location Alias: 00/05-29-77-07 W6M
Location Alias 2: 00/05-29-077-07 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 07
Section: 29
County/Municipality: Saddle Hills County
Well Name: TOURMALINE HZ VALHALLA 5-29-77-7
Operator Name: Tourmaline Oil Corp.
License Number: 0448061
License Date: 2012-08-29
License Status: Amended
Spud Date: 2013-08-09
Final Drill Date: 2013-08-26
Well Total Depth: 3711.00 m
Surface Hole Latitude: 55.686913
Surface Hole Longitude: -119.033643

For data sources see[1][2]

Well History

Date Event
2012-08-29 Obtained License
2013-08-11 Surface Casing Operation Performed
2013-08-13 Direction Drilling Operation Performed - Deviate
2013-08-16 Direction Drilling Operation Performed - Horizontal
2013-08-26 Finished Drilling
2013-08-26 Well Mode changed to Drilled and Cased
2013-08-30 Rig Released
2013-08-31 Production Casing Operation Performed
2013-09-27 Well Log Performed
2013-09-30 Perforation Treatment Performed - Multi-Stage Fracture
2013-10-05 Perforation Treatment Performed - Multi-Stage Fracture
2013-10-06 Perforation Treatment Performed - Multi-Stage Fracture
2013-10-07 Perforation Treatment Performed - Multi-Stage Fracture
2013-10-14 Well Began Production
2013-10-14 Well Fluid changed to Crude Oil
2013-10-14 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-08-09 Beaver Drilling Ltd. 7 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-08-13 1255.50 Deviate (5 - 79 degrees)
2013-08-16 1807.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-09-30 Multi-Stage Fracture 3664.90 3665.00 0
2013-10-06 Multi-Stage Fracture 3139.00 3139.10 0
2013-10-06 Multi-Stage Fracture 3080.50 3080.60 0
2013-10-06 Multi-Stage Fracture 3022.00 3022.10 0
2013-10-06 Multi-Stage Fracture 2963.60 2963.70 0
2013-10-06 Multi-Stage Fracture 2905.20 2905.30 0
2013-10-06 Multi-Stage Fracture 2846.70 2846.80 0
2013-10-06 Multi-Stage Fracture 2788.80 2788.90 0
2013-10-06 Multi-Stage Fracture 2730.40 2730.50 0
2013-10-06 Multi-Stage Fracture 2672.00 2672.10 0
2013-10-06 Multi-Stage Fracture 2613.50 2613.60 0
2013-10-05 Multi-Stage Fracture 3601.10 3601.20 0
2013-10-06 Multi-Stage Fracture 2555.10 2555.20 0
2013-10-06 Multi-Stage Fracture 2496.60 2496.70 0
2013-10-06 Multi-Stage Fracture 2438.20 2438.30 0
2013-10-07 Multi-Stage Fracture 2380.20 2380.30 0
2013-10-07 Multi-Stage Fracture 2322.20 2322.30 0
2013-10-07 Multi-Stage Fracture 2263.90 2264.00 0
2013-10-07 Multi-Stage Fracture 2205.50 2205.60 0
2013-10-05 Multi-Stage Fracture 3547.70 3547.80 0
2013-10-05 Multi-Stage Fracture 3489.30 3489.40 0
2013-10-05 Multi-Stage Fracture 3430.80 3430.90 0
2013-10-05 Multi-Stage Fracture 3372.40 3372.50 0
2013-10-05 Multi-Stage Fracture 3314.00 3315.00 0
2013-10-05 Multi-Stage Fracture 3255.90 3256.00 0
2013-10-05 Multi-Stage Fracture 3197.50 3197.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-09-30 2013-10-07 1,594 6,346 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 90.5564 N/A
16/30 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 4.0432 N/A
16/30 SiberProp Calfrac Quartz 14808-60-7 100 1.1127 N/A
20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 5.025 N/A
50/140 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 0.7221 N/A
15% HCl Calfrac Acid Hydrochloric acid 7647-01-0 100 2.0197 N/A
Water 7732-18-5 100 2.0197 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.1064 N/A
DWP-949 Calfrac Demulsifier Ethoxylated alcohols 8300 100 0.1343 N/A
Ethoxylated phenolic resin 8300 100 0.1356 N/A
Isobutyl ketone 8300 100 0.1345 N/A
Non-Hazardous Ingredients Trade Secret 100 0.1502 N/A
Organic acid salts 1 8300 100 0.1343 N/A
Organic acid salts 2 8300 100 0.1357 N/A
Organic acid salts 3 8300 100 0.1356 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.1395 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-09-29 2013-09-30 Surface Water - Runoff 6346

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 1651 0.0 0.0 0.0
2014 8066 0.0 0.0 0.0
2015 7586 0.0 0.0 0.0
2016 5253 0.0 0.0 0.0
2017 6357 0.0 0.0 0.0
2018 8690 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-08-26 No Incident Encountered 0.00 0.00
2013-10-21 No Incident Encountered 0.00 0.00

For data sources see[10]

References