If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776072712000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.713369,"lon":-119.028885,"icon":""}]} |
Location: 00/12-27-077-07W6/0 | |
Location Alias: 00/12-27-77-07 W6M | |
Location Alias 2: 00/12-27-077-07 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 07 | |
Section: 27 | |
County/Municipality: Saddle Hills County | |
Well Name: TOURMALINE HZ VALHALLA 12-27-77-7 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0464493 | |
License Date: 2014-01-30 | |
License Status: Issued | |
Spud Date: 2014-03-01 | |
Final Drill Date: 2014-03-14 | |
Well Total Depth: 3292.00 m | |
Surface Hole Latitude: 55.713369 | |
Surface Hole Longitude: -119.028885 |
Date | Event |
---|---|
2014-01-30 | Obtained License |
2014-03-04 | Surface Casing Operation Performed |
2014-03-06 | Direction Drilling Operation Performed - Deviate |
2014-03-08 | Direction Drilling Operation Performed - Horizontal |
2014-03-14 | Finished Drilling |
2014-03-14 | Well Mode changed to Drilled and Cased |
2014-03-17 | Production Casing Operation Performed |
2014-03-17 | Rig Released |
2014-04-05 | Well Log Performed |
2014-04-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-04-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-04-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-04-23 | Well Began Production |
2014-04-23 | Well Fluid changed to Crude Oil |
2014-04-23 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-03-01 | Ironhand Drilling Inc. | 3 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-03-06 | 1255.60 | Deviate (5 - 79 degrees) |
2014-03-08 | 1635.20 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-04-09 | Multi-Stage Fracture | 3254.50 | 3254.60 | 0 |
2014-04-11 | Multi-Stage Fracture | 2674.00 | 2674.10 | 0 |
2014-04-11 | Multi-Stage Fracture | 2615.60 | 2615.70 | 0 |
2014-04-11 | Multi-Stage Fracture | 2557.10 | 2557.20 | 0 |
2014-04-11 | Multi-Stage Fracture | 2498.70 | 2498.80 | 0 |
2014-04-11 | Multi-Stage Fracture | 2440.00 | 2440.10 | 0 |
2014-04-11 | Multi-Stage Fracture | 2381.50 | 2381.60 | 0 |
2014-04-11 | Multi-Stage Fracture | 2323.00 | 2323.10 | 0 |
2014-04-11 | Multi-Stage Fracture | 2264.50 | 2264.60 | 0 |
2014-04-11 | Multi-Stage Fracture | 2206.00 | 2206.10 | 0 |
2014-04-11 | Multi-Stage Fracture | 2147.50 | 2147.60 | 0 |
2014-04-11 | Multi-Stage Fracture | 3182.50 | 3182.60 | 0 |
2014-04-11 | Multi-Stage Fracture | 2089.10 | 2089.20 | 0 |
2014-04-11 | Multi-Stage Fracture | 2030.60 | 2030.70 | 0 |
2014-04-11 | Multi-Stage Fracture | 1972.20 | 1972.30 | 0 |
2014-04-11 | Multi-Stage Fracture | 1913.70 | 1913.80 | 0 |
2014-04-12 | Multi-Stage Fracture | 1855.20 | 1855.30 | 0 |
2014-04-12 | Multi-Stage Fracture | 1796.60 | 1796.70 | 0 |
2014-04-12 | Multi-Stage Fracture | 1751.60 | 1751.70 | 0 |
2014-04-11 | Multi-Stage Fracture | 3110.60 | 3110.70 | 0 |
2014-04-11 | Multi-Stage Fracture | 3038.60 | 3038.70 | 0 |
2014-04-11 | Multi-Stage Fracture | 2966.60 | 2966.70 | 0 |
2014-04-11 | Multi-Stage Fracture | 2908.10 | 2908.20 | 0 |
2014-04-11 | Multi-Stage Fracture | 2849.60 | 2849.70 | 0 |
2014-04-11 | Multi-Stage Fracture | 2791.10 | 2791.20 | 0 |
2014-04-11 | Multi-Stage Fracture | 2732.60 | 2732.70 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-04-09 | 2014-04-12 | 1,541 | 5,474 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 88.0225 | N/A | |||
Sand (20/40) Ottawa | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 8.8236 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 8.8236 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 8.8236 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 8.8236 | N/A | ||||
Sand (50/140) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 0.8222 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 0.8222 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 0.8222 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 0.8222 | N/A | ||||
SiberProp (16/30) | Canyon | Crystalline silica. quartz | 14808-60-7 | 100 | 1.9766 | N/A | ||
Phenol formaldehyde resin | 9003-35-4 | 100 | 1.9766 | N/A | ||||
HCL 15% | Canyon | Acid | Hydrogen Chloride | 7647-01-0 | 100 | 0.0691 | N/A | |
Water | 7732-18-5 | 100 | 0.0691 | N/A | ||||
Tolcide PS75LT | Canyon | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0132 | N/A | |
Water | 7732-18-5 | 100 | 0.0132 | N/A | ||||
CAN-1911 Clay Stabilizer | Canyon | Clay Control | 1.6-Hexandiamine. dihydrochloride | 6055-52-3 | 100 | 0.0954 | N/A | |
Water | 7732-18-5 | 100 | 0.0954 | N/A | ||||
CAN-2056 Gellant (G50 Microtox EC50) | Canyon | Gelling Agent | Ammonium Chloride | 12125-02-9 | 100 | 0.0945 | N/A | |
Hydrotreated Kerosene | 64742-47-8 | 100 | 0.0945 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0945 | N/A | ||||
CAN-2410 Demulsifier | Canyon | Surfactant | Methyl Alcohol | 67-56-1 | 100 | 0.0825 | N/A | |
Water | 7732-18-5 | 100 | 0.0825 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-04-09 | 2014-04-09 | Surface Water - Runoff | 2910 |
2014-04-09 | 2014-04-09 | Surface Water - Runoff | 2563 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 4691 | 0.0 | 0.0 | 0.0 |
2015 | 8522 | 0.0 | 0.0 | 0.0 |
2016 | 7623 | 0.0 | 0.0 | 0.0 |
2017 | 8335 | 0.0 | 0.0 | 0.0 |
2018 | 8607 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-03-14 | No Incident Encountered | 0.00 | 0.00 |
2014-04-26 | No Incident Encountered | 0.00 | 0.00 |
2014-08-10 | No Incident Encountered | 0.00 | 0.00 |
2014-08-26 | No Incident Encountered | 0.00 | 0.00 |
2014-09-06 | No Incident Encountered | 0.00 | 0.00 |
2015-06-13 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]