X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776072513030

Well Details

Well ID: 0776072513030
Loading map...
Location: 03/13-25-077-07W6/0
Location Alias: 03/13-25-77-07 W6M
Location Alias 2: 03/13-25-077-07 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 07
Section: 25
County/Municipality: Saddle Hills County
Well Name: TOURMALINE 103HZ VALHALLA 13-25-77-7
Operator Name: Tourmaline Oil Corp.
License Number: 0454080
License Date: 2013-01-24
License Status: Issued
Spud Date: 2013-03-16
Final Drill Date: 2013-09-05
Well Total Depth: 3503.00 m
Surface Hole Latitude: 55.694668
Surface Hole Longitude: -118.932437

For data sources see[1][2]

Well History

Date Event
2013-01-24 Obtained License
2013-03-16 Surface Casing Operation Performed
2013-03-16 Well Mode changed to Preset
2013-03-18 Well Log Performed
2013-08-28 Direction Drilling Operation Performed - Deviate
2013-08-29 Direction Drilling Operation Performed - Horizontal
2013-08-31 Well Log Performed
2013-09-05 Finished Drilling
2013-09-05 Well Log Performed
2013-09-05 Well Mode changed to Drilled and Cased
2013-09-08 Production Casing Operation Performed
2013-09-09 Rig Released
2013-09-23 Well Log Performed
2013-09-25 Perforation Treatment Performed - Multi-Stage Fracture
2013-09-26 Perforation Treatment Performed - Multi-Stage Fracture
2013-09-27 Perforation Treatment Performed - Multi-Stage Fracture
2013-09-28 Perforation Treatment Performed - Multi-Stage Fracture
2013-11-03 Well Began Production
2013-11-03 Well Fluid changed to Crude Oil
2013-11-03 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-03-16 Patterson-UTI Drilling Co. Canada 53 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-08-28 1204.00 Deviate (5 - 79 degrees)
2013-08-29 1648.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-09-25 Multi-Stage Fracture 3460.50 3460.60 0
2013-09-27 Multi-Stage Fracture 2828.70 2828.80 0
2013-09-27 Multi-Stage Fracture 2757.00 2757.10 0
2013-09-27 Multi-Stage Fracture 2685.30 2685.40 0
2013-09-27 Multi-Stage Fracture 2613.60 2613.70 0
2013-09-27 Multi-Stage Fracture 2542.00 2542.10 0
2013-09-27 Multi-Stage Fracture 2470.30 2470.40 0
2013-09-27 Multi-Stage Fracture 2398.60 2398.70 0
2013-09-27 Multi-Stage Fracture 2326.90 2327.00 0
2013-09-28 Multi-Stage Fracture 2255.30 2255.40 0
2013-09-28 Multi-Stage Fracture 2183.60 2183.70 0
2013-09-26 Multi-Stage Fracture 3402.20 3402.30 0
2013-09-28 Multi-Stage Fracture 2112.00 2112.10 0
2013-09-28 Multi-Stage Fracture 2040.40 2040.50 0
2013-09-28 Multi-Stage Fracture 1968.70 1968.80 0
2013-09-28 Multi-Stage Fracture 1910.40 1910.50 0
2013-09-28 Multi-Stage Fracture 1865.60 1865.70 0
2013-09-26 Multi-Stage Fracture 3330.60 3330.70 0
2013-09-26 Multi-Stage Fracture 3258.80 3258.90 0
2013-09-27 Multi-Stage Fracture 3187.10 3187.20 0
2013-09-27 Multi-Stage Fracture 3115.40 3115.50 0
2013-09-27 Multi-Stage Fracture 3043.70 3043.80 0
2013-09-27 Multi-Stage Fracture 2972.10 2972.20 0
2013-09-27 Multi-Stage Fracture 2900.40 2900.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-09-25 2013-09-28 1,538 5,790 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 86.7861 N/A
16/30 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 4.872 N/A
16/30 SiberProp Calfrac Quartz 14808-60-7 100 1.1792 N/A
20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 6.4233 N/A
50/140 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 0.7477 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.3105 N/A
DWP-949 Calfrac Demulsifier Ethoxylated alcohols 8300 100 0.3596 N/A
Ethoxylated phenolic resin 8300 100 0.3609 N/A
Isobutyl ketone 8300 100 0.3597 N/A
Non-Hazardous Ingredients Trade Secret 100 0.3728 N/A
Organic acid salts 1 8300 100 0.3596 N/A
Organic acid salts 2 8300 100 0.3605 N/A
Organic acid salts 3 8300 100 0.3609 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.3462 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-09-26 2013-09-28 Surface Water - Runoff 4994
2013-09-19 2013-10-20 Surface Water - Runoff 690
2013-09-21 2013-09-21 Surface Water - Runoff 106

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 1276 0.0 0.0 0.0
2014 7722 0.0 0.0 0.0
2015 8619 0.0 0.0 0.0
2016 8446 0.0 0.0 0.0
2017 7720 0.0 0.0 0.0
2018 7441 0.0 0.0 0.0
2019 8507 0.0 0.0 0.0
2020 108 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-03-22 No Incident Encountered 0.00 0.00
2013-09-05 No Incident Encountered 0.00 0.00
2013-10-09 No Incident Encountered 0.00 0.00

For data sources see[10]

References