X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776072213000

Well Details

Well ID: 0776072213000
Loading map...
Location: 00/13-22-077-07W6/0
Location Alias: 00/13-22-77-07 W6M
Location Alias 2: 00/13-22-077-07 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 07
Section: 22
County/Municipality: Saddle Hills County
Well Name: TOURMALINE HZ VALHALLA 13-22-77-7
Operator Name: Tourmaline Oil Corp.
License Number: 0457364
License Date: 2013-06-06
License Status: Amended
Spud Date: 2014-01-09
Final Drill Date: 2014-01-27
Well Total Depth: 3530.00 m
Surface Hole Latitude: 55.681042
Surface Hole Longitude: -118.979970

For data sources see[1][2]

Well History

Date Event
2013-06-06 Obtained License
2014-01-10 Surface Casing Operation Performed
2014-01-12 Direction Drilling Operation Performed - Deviate
2014-01-15 Direction Drilling Operation Performed - Horizontal
2014-01-17 Well Log Performed
2014-01-20 Intermediate Casing Operation Performed
2014-01-21 Well Log Performed
2014-01-27 Finished Drilling
2014-01-27 Well Mode changed to Drilled and Cased
2014-01-30 Liner Casing Operation Performed
2014-01-31 Rig Released
2014-02-05 Well Log Performed
2014-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-02-09 Perforation Treatment Performed - Multi-Stage Fracture
2014-02-17 Perforation Treatment Performed - Multi-Stage Fracture
2014-02-18 Perforation Treatment Performed - Multi-Stage Fracture
2014-02-19 Well Log Performed
2014-02-23 Well Log Performed
2014-03-03 Well Log Performed
2014-03-05 Well Log Performed
2014-03-14 Well Began Production
2014-03-14 Well Fluid changed to Crude Oil
2014-03-14 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-01-09 Beaver Drilling Ltd. 7 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-01-12 1260.40 Deviate (5 - 79 degrees)
2014-01-15 1697.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-02-09 Multi-Stage Fracture 3494.80 3494.90 0
2014-02-17 Multi-Stage Fracture 2933.70 2933.80 0
2014-02-18 Multi-Stage Fracture 2861.80 2861.90 0
2014-02-18 Multi-Stage Fracture 2790.00 2790.10 0
2014-02-18 Multi-Stage Fracture 2718.20 2718.30 0
2014-02-18 Multi-Stage Fracture 2646.30 2646.40 0
2014-02-18 Multi-Stage Fracture 2574.50 2574.60 0
2014-02-18 Multi-Stage Fracture 2502.70 2502.80 0
2014-02-18 Multi-Stage Fracture 2430.90 2431.00 0
2014-02-18 Multi-Stage Fracture 2359.20 2359.30 0
2014-02-18 Multi-Stage Fracture 2287.40 2287.50 0
2014-02-09 Acid Treatment 3494.80 3494.90 0
2014-02-18 Multi-Stage Fracture 2215.60 2215.70 0
2014-02-18 Multi-Stage Fracture 2143.70 2143.80 0
2014-02-18 Multi-Stage Fracture 2071.90 2072.00 0
2014-02-18 Multi-Stage Fracture 2000.10 2000.20 0
2014-02-18 Multi-Stage Fracture 1928.20 1928.30 0
2014-02-18 Multi-Stage Fracture 1869.90 1870.00 0
2014-02-18 Multi-Stage Fracture 1811.50 1811.60 0
2014-02-18 Multi-Stage Fracture 1766.40 1766.50 0
2014-02-17 Multi-Stage Fracture 3436.50 3436.60 0
2014-02-17 Multi-Stage Fracture 3364.70 3364.80 0
2014-02-17 Multi-Stage Fracture 3292.80 3292.90 0
2014-02-17 Multi-Stage Fracture 3221.00 3221.10 0
2014-02-17 Multi-Stage Fracture 3149.10 3149.20 0
2014-02-17 Multi-Stage Fracture 3077.30 3077.40 0
2014-02-17 Multi-Stage Fracture 3005.50 3005.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-02-09 2014-02-18 1,579 4,397 N/A
2 2014-02-17 2014-02-18 1,579 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 86.0325 N/A
16/30 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 4.9137 N/A
16/30 SiberProp Calfrac Quartz 14808-60-7 100 1.5361 N/A
20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 7.2875 N/A
50/140 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 1.0238 N/A
DWP-962 Calfrac Bactericide/Biocide Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) 55566-30-8 100 0.0139 N/A
Water 7732-18-5 100 0.0162 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.083 N/A
DWP-937 Calfrac Demulsifier Citrus terpenes 94266-47-4 100 0.0923 N/A
Isopropanol 67-63-0 100 0.0956 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0923 N/A
Triethylene glycol 112-27-6 100 0.0956 N/A
Water 7732-18-5 100 0.0929 N/A
DWP-602 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.1003 N/A
2 Activator W Calfrac Activator Alcohols. C12-14-Secondary. Ethoxylated 84133-50-6 100 0.0204 N/A
Methanol 67-56-1 100 0.0201 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0361 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-02-27 2014-02-27 Surface Water - Runoff 406
2014-02-27 2014-02-27 Surface Water - Runoff 3732
2014-03-03 2014-03-03 Recycled Fracturing Water (treated at well site) 259

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 5521 0.0 0.0 0.0
2015 7685 0.0 0.0 0.0
2016 8303 0.0 0.0 0.0
2017 8335 0.0 0.0 0.0
2018 8357 0.0 0.0 0.0
2019 8363 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-01-27 No Incident Encountered 0.00 0.00
2014-03-19 No Incident Encountered 0.00 0.00
2014-09-09 No Incident Encountered 0.00 0.00
2015-11-06 No Incident Encountered 0.00 0.00

For data sources see[10]

References