If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776072205020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.695196,"lon":-119.033466,"icon":""}]} |
Location: 02/05-22-077-07W6/0 | |
Location Alias: 02/05-22-77-07 W6M | |
Location Alias 2: 02/05-22-077-07 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 07 | |
Section: 22 | |
County/Municipality: Saddle Hills County | |
Well Name: TOURMALINE 102 VALHALLA 5-22-77-7 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0474801 | |
License Date: 2015-03-02 | |
License Status: Issued | |
Spud Date: 2015-05-28 | |
Final Drill Date: 2015-06-10 | |
Well Total Depth: 3637.00 m | |
Surface Hole Latitude: 55.695196 | |
Surface Hole Longitude: -119.033466 |
Date | Event |
---|---|
2015-03-02 | Obtained License |
2015-05-29 | Surface Casing Operation Performed |
2015-05-31 | Direction Drilling Operation Performed - Deviate |
2015-06-02 | Direction Drilling Operation Performed - Horizontal |
2015-06-03 | Well Log Performed |
2015-06-04 | Intermediate Casing Operation Performed |
2015-06-10 | Finished Drilling |
2015-06-10 | Well Log Performed |
2015-06-10 | Well Mode changed to Drilled and Cased |
2015-06-11 | Production Casing Operation Performed |
2015-06-13 | Rig Released |
2015-06-17 | Well Log Performed |
2015-06-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2015-06-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-06-24 | Well Began Production |
2015-06-24 | Well Fluid changed to Crude Oil |
2015-06-24 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2015-05-28 | Ironhand Drilling Inc. | 3 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2015-05-31 | 1246.50 | Deviate (5 - 79 degrees) |
2015-06-02 | 1817.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-06-19 | Multi-Stage Fracture | 3600.80 | 3600.90 | 0 |
2015-06-19 | Multi-Stage Fracture | 3083.50 | 3083.60 | 0 |
2015-06-19 | Multi-Stage Fracture | 3024.50 | 3024.60 | 0 |
2015-06-19 | Multi-Stage Fracture | 2951.00 | 2951.10 | 0 |
2015-06-19 | Multi-Stage Fracture | 2893.00 | 2893.10 | 0 |
2015-06-19 | Multi-Stage Fracture | 2820.00 | 2820.10 | 0 |
2015-06-19 | Multi-Stage Fracture | 2760.20 | 2760.30 | 0 |
2015-06-19 | Multi-Stage Fracture | 2686.50 | 2686.60 | 0 |
2015-06-19 | Multi-Stage Fracture | 2627.30 | 2627.40 | 0 |
2015-06-19 | Multi-Stage Fracture | 2553.30 | 2553.40 | 0 |
2015-06-19 | Multi-Stage Fracture | 2493.40 | 2493.50 | 0 |
2015-06-19 | Acid Treatment | 3600.80 | 3600.90 | 0 |
2015-06-19 | Multi-Stage Fracture | 2421.40 | 2421.50 | 0 |
2015-06-19 | Multi-Stage Fracture | 2361.80 | 2361.90 | 0 |
2015-06-19 | Multi-Stage Fracture | 2288.20 | 2288.30 | 0 |
2015-06-19 | Multi-Stage Fracture | 2229.20 | 2229.30 | 0 |
2015-06-19 | Multi-Stage Fracture | 2155.20 | 2155.30 | 0 |
2015-06-19 | Multi-Stage Fracture | 2095.80 | 2095.90 | 0 |
2015-06-19 | Multi-Stage Fracture | 2022.40 | 2022.50 | 0 |
2015-06-19 | Multi-Stage Fracture | 1964.60 | 1964.70 | 0 |
2015-06-19 | Multi-Stage Fracture | 3554.30 | 3554.40 | 0 |
2015-06-19 | Multi-Stage Fracture | 3480.90 | 3481.00 | 0 |
2015-06-19 | Multi-Stage Fracture | 3422.00 | 3422.10 | 0 |
2015-06-19 | Multi-Stage Fracture | 3349.80 | 3349.90 | 0 |
2015-06-19 | Multi-Stage Fracture | 3290.40 | 3290.50 | 0 |
2015-06-19 | Multi-Stage Fracture | 3216.90 | 3217.00 | 0 |
2015-06-19 | Multi-Stage Fracture | 3157.50 | 3157.60 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-06-19 | 2015-06-19 | 1,567 | 3,882 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 87.3871 | N/A | |||
Atlas CRC-LT (20/40) | Canyon | Crystalline silica. quartz | 14808-60-7 | 100 | 11.1861 | N/A | ||
Phenolic Resin | 9003-35-4 | 100 | 11.1861 | N/A | ||||
Sand (50/140) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 1.1774 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 1.1774 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 1.1774 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 1.1774 | N/A | ||||
Tolcide PS75LT | Canyon | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.014 | N/A | |
Water | 7732-18-5 | 100 | 0.014 | N/A | ||||
CAN-1912 Clay Stabilizer (HT) | Canyon | Clay Control | No hazardous ingredients | Not Available | 100 | 0.098 | N/A | |
CAN-2411 Non-emulsifier | Canyon | Demulsifier | Ethylene glycol | 107-21-1 | 100 | 0.0881 | N/A | |
Isopropanol | 67-63-0 | 100 | 0.0881 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0881 | N/A | ||||
CAN-2057 Friction Reducer | Canyon | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0489 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2015-06-17 | 2015-06-18 | Surface Water - Runoff | 3882 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 4128 | 0.0 | 0.0 | 0.0 |
2016 | 8255 | 0.0 | 0.0 | 0.0 |
2017 | 7462 | 0.0 | 0.0 | 0.0 |
2018 | 4256 | 0.0 | 0.0 | 0.0 |
2019 | 8687 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-06-13 | No Incident Encountered | 0.00 | 0.00 |
2015-06-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]