X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776070814030

Well Details

Well ID: 0776070814030
Loading map...
Location: 03/14-08-077-07W6/0
Location Alias: 03/14-08-77-07 W6M
Location Alias 2: 03/14-08-077-07 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 07
Section: 08
County/Municipality: Saddle Hills County
Well Name: TOURMALINE 103 HZ VALHALLA 14-8-77-7
Operator Name: Tourmaline Oil Corp.
License Number: 0450398
License Date: 2012-11-21
License Status: Amended
Spud Date: 2013-01-09
Final Drill Date: 2013-01-26
Well Total Depth: 3510.00 m
Surface Hole Latitude: 55.676344
Surface Hole Longitude: -119.069503

For data sources see[1][2]

Well History

Date Event
2012-11-21 Obtained License
2013-01-09 Lost Circulation Occurred
2013-01-12 Surface Casing Operation Performed
2013-01-15 Direction Drilling Operation Performed - Deviate
2013-01-16 Direction Drilling Operation Performed - Horizontal
2013-01-25 Well Log Performed
2013-01-26 Finished Drilling
2013-01-26 Well Mode changed to Drilled and Cased
2013-01-28 Production Casing Operation Performed
2013-01-29 Rig Released
2013-02-04 Well Log Performed
2013-02-08 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-14 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-15 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-20 Well Began Production
2013-02-20 Well Fluid changed to Crude Oil
2013-02-20 Well Mode changed to Flowing
2013-10-28 Well Fluid changed to Crude Oil
2013-10-28 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-01-09 Beaver Drilling Ltd. 7 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-01-15 1421.00 Deviate (5 - 79 degrees)
2013-01-16 1861.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-02-08 Multi-Stage Fracture 3475.60 3475.70 0
2013-02-14 Multi-Stage Fracture 2947.70 2947.80 0
2013-02-14 Multi-Stage Fracture 2889.20 2889.30 0
2013-02-14 Multi-Stage Fracture 2830.70 2830.80 0
2013-02-14 Multi-Stage Fracture 2772.30 2772.40 0
2013-02-15 Multi-Stage Fracture 2713.80 2713.90 0
2013-02-15 Multi-Stage Fracture 2655.30 2655.40 0
2013-02-15 Multi-Stage Fracture 2596.80 2596.90 0
2013-02-15 Multi-Stage Fracture 2536.30 2536.40 0
2013-02-15 Multi-Stage Fracture 2479.70 2479.80 0
2013-02-15 Multi-Stage Fracture 2421.30 2421.40 0
2013-02-14 Multi-Stage Fracture 3415.60 3415.70 0
2013-02-15 Multi-Stage Fracture 2362.80 2362.90 0
2013-02-15 Multi-Stage Fracture 2304.30 2304.40 0
2013-02-15 Multi-Stage Fracture 2245.80 2245.90 0
2013-02-15 Multi-Stage Fracture 2187.30 2187.40 0
2013-02-15 Multi-Stage Fracture 2128.80 2128.90 0
2013-02-14 Multi-Stage Fracture 3357.00 3357.10 0
2013-02-14 Multi-Stage Fracture 3298.60 3298.70 0
2013-02-14 Multi-Stage Fracture 3240.10 3240.20 0
2013-02-14 Multi-Stage Fracture 3181.60 3186.70 0
2013-02-14 Multi-Stage Fracture 3123.10 3123.20 0
2013-02-14 Multi-Stage Fracture 3064.70 3064.80 0
2013-02-14 Multi-Stage Fracture 3006.20 3006.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-02-08 2013-02-15 1,727 4,522 N/A
2 2013-02-08 2013-02-08 1,727 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 82.8455 N/A
16/30 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 6.4037 N/A
16/30 SiberProp Calfrac Quartz 14808-60-7 100 1.3176 N/A
20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 8.187 N/A
50/140 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 0.8887 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.078 N/A
DWP-949 Calfrac Demulsifier Ethoxylated alcohols 8300 100 0.0904 N/A
Ethoxylated phenolic resin 8300 100 0.0917 N/A
Isobutyl ketone 8300 100 0.0906 N/A
Non-Hazardous Ingredients Trade Secret 100 0.1037 N/A
Organic acid salts 1 8300 100 0.0904 N/A
Organic acid salts 2 8300 100 0.0914 N/A
Organic acid salts 3 8300 100 0.0917 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0904 N/A
2 15% HCl Calfrac Acid Hydrochloric acid 7647-01-0 100 2.1354 N/A
Water 7732-18-5 100 2.1354 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-02-08 2013-02-26 Surface Water - Runoff 4522

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 6302 0.0 0.0 0.0
2014 8307 0.0 0.0 0.0
2015 8138 0.0 0.0 0.0
2016 8581 0.0 0.0 0.0
2017 8289 0.0 0.0 0.0
2018 8649 0.0 0.0 0.0
2019 8026 0.0 0.0 0.0
2020 1580 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-01-09 Lost Circulation 32.00 32.00
2013-02-25 No Incident Encountered 0.00 0.00

For data sources see[10]

References