If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776070803020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.668011,"lon":-119.072028,"icon":""}]} |
Location: 02/03-08-077-07W6/0 | |
Location Alias: 02/03-08-77-07 W6M | |
Location Alias 2: 02/03-08-077-07 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 07 | |
Section: 08 | |
County/Municipality: Saddle Hills County | |
Well Name: TOURMALINE HZ 102 VALHALLA 3-8-77-7 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0476138 | |
License Date: 2015-07-16 | |
License Status: Issued | |
Spud Date: 2015-09-19 | |
Final Drill Date: 2015-10-25 | |
Well Total Depth: 3886.00 m | |
Surface Hole Latitude: 55.668011 | |
Surface Hole Longitude: -119.072028 |
Date | Event |
---|---|
2015-07-16 | Obtained License |
2015-09-20 | Surface Casing Operation Performed |
2015-10-10 | Direction Drilling Operation Performed - Deviate |
2015-10-12 | Direction Drilling Operation Performed - Horizontal |
2015-10-14 | Intermediate Casing Operation Performed |
2015-10-17 | Well Log Performed |
2015-10-19 | Well Log Performed |
2015-10-25 | Finished Drilling |
2015-10-25 | Well Log Performed |
2015-10-25 | Well Mode changed to Drilled and Cased |
2015-10-27 | Liner Casing Operation Performed |
2015-10-27 | Rig Released |
2016-01-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2016-01-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-01-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-01-29 | Well Began Production |
2016-01-29 | Well Fluid changed to Crude Oil |
2016-01-29 | Well Mode changed to Pumping |
2016-02-07 | Perforation Treatment Performed - Jet Perforation |
2016-02-07 | Well Log Performed |
2016-02-08 | Perforation Treatment Performed - Cement Squeeze |
2016-02-09 | Perforation Treatment Performed - Jet Perforation |
2016-02-09 | Well Log Performed |
2016-02-10 | Perforation Treatment Performed - Cement Squeeze |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2015-09-19 | Precision Drilling Corporation | 226 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2015-10-10 | 1438.30 | Deviate (5 - 79 degrees) |
2015-10-12 | 2113.30 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2016-01-10 | Multi-Stage Fracture | 3871.00 | 3871.10 | 0 |
2016-01-10 | Multi-Stage Fracture | 3330.00 | 3330.10 | 0 |
2016-01-10 | Multi-Stage Fracture | 3272.30 | 3272.40 | 0 |
2016-01-10 | Multi-Stage Fracture | 3214.70 | 3214.80 | 0 |
2016-01-10 | Multi-Stage Fracture | 3156.60 | 3156.70 | 0 |
2016-01-10 | Multi-Stage Fracture | 3097.90 | 3098.00 | 0 |
2016-01-10 | Multi-Stage Fracture | 3039.10 | 3039.20 | 0 |
2016-01-10 | Multi-Stage Fracture | 2980.30 | 2980.40 | 0 |
2016-01-10 | Multi-Stage Fracture | 2921.60 | 2921.70 | 0 |
2016-01-12 | Multi-Stage Fracture | 2863.20 | 2863.30 | 0 |
2016-01-12 | Multi-Stage Fracture | 2804.70 | 2804.80 | 0 |
2016-01-10 | Acid Treatment | 3871.00 | 3871.10 | 0 |
2016-01-12 | Multi-Stage Fracture | 2645.90 | 2646.00 | 0 |
2016-01-12 | Multi-Stage Fracture | 2587.40 | 2587.50 | 0 |
2016-01-12 | Multi-Stage Fracture | 2528.50 | 2528.60 | 0 |
2016-01-12 | Multi-Stage Fracture | 2470.10 | 2470.20 | 0 |
2016-01-12 | Multi-Stage Fracture | 2411.10 | 2411.20 | 0 |
2016-01-12 | Multi-Stage Fracture | 2352.30 | 2352.40 | 0 |
2016-01-12 | Multi-Stage Fracture | 2293.60 | 2293.70 | 0 |
2016-01-12 | Multi-Stage Fracture | 2234.50 | 2234.60 | 0 |
2016-02-07 | Perforation | 1215.00 | 1216.00 | 17 |
2016-02-08 | Cement Squeeze | 1215.00 | 1216.00 | 0 |
2016-01-10 | Multi-Stage Fracture | 3783.20 | 3783.30 | 0 |
2016-02-09 | Perforation | 1102.00 | 1103.00 | 17 |
2016-02-10 | Cement Squeeze | 1102.00 | 1103.00 | 0 |
2016-01-10 | Multi-Stage Fracture | 3709.80 | 3709.90 | 0 |
2016-01-10 | Multi-Stage Fracture | 3651.60 | 3651.70 | 0 |
2016-01-10 | Multi-Stage Fracture | 3593.00 | 3593.10 | 0 |
2016-01-10 | Multi-Stage Fracture | 3519.60 | 3519.70 | 0 |
2016-01-10 | Multi-Stage Fracture | 3461.00 | 3461.10 | 0 |
2016-01-10 | Multi-Stage Fracture | 3388.20 | 3388.30 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-01-10 | 2016-01-12 | 1,775 | 4,092 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 90.0309 | N/A | |||
Sand (20/40) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 5.1591 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 5.1591 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 5.1591 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 5.1591 | N/A | ||||
Sand (50/140) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 1.1591 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 1.1591 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 1.1591 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 1.159 | N/A | ||||
SiberProp (20/40) | Canyon Technical Services | Crystalline silica. quartz | 14808-60-7 | 100 | 4.4671 | N/A | ||
Phenol formaldehyde resin | 9003-35-4 | 100 | 4.4671 | N/A | ||||
Tolcide PS75LT | Canyon Technical Services | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0142 | N/A | |
Water | 7732-18-5 | 100 | 0.0142 | N/A | ||||
CAN-1912 Clay Stabilizer (HT) | Canyon Technical Services | Clay Control | No hazardous ingredients | Not Available | 100 | 0.0914 | N/A | |
CAN-2410 Demulsifier | Canyon Technical Services | Demulsifier | Methyl Alcohol | 67-56-1 | 100 | 0.0953 | N/A | |
Water | 7732-18-5 | 100 | 0.0953 | N/A | ||||
CAN-2057 Friction Reducer | Canyon Technical Services | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0481 | N/A | |
CAN-1402 Scale Inhibitor | Canyon Technical Services | Scale Inhibitor | Methyl Alcohol | 67-56-1 | 100 | 0.0365 | N/A | |
Potassium Chloride | 7447-40-7 | 100 | 0.0365 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0365 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2016-01-10 | 2016-01-10 | Surface Water - Runoff | 3646 |
2016-01-12 | 2016-01-12 | Surface Water - Runoff | 446 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2016 | 7406 | 0.0 | 0.0 | 0.0 |
2017 | 8267 | 0.0 | 0.0 | 0.0 |
2018 | 7569 | 0.0 | 0.0 | 0.0 |
2019 | 8282 | 0.0 | 0.0 | 0.0 |
2020 | 1895 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-10-25 | No Incident Encountered | 0.00 | 0.00 |
2016-02-16 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]