If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776070602000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.652061,"lon":-119.078891,"icon":""}]} |
Location: 00/02-06-077-07W6/0 | |
Location Alias: 00/02-06-77-07 W6M | |
Location Alias 2: 00/02-06-077-07 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 07 | |
Section: 06 | |
County/Municipality: Saddle Hills County | |
Well Name: TOURMALINE HZ VALHALLA 2-6-77-7 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0484825 | |
License Date: 2017-08-01 | |
License Status: Issued | |
Spud Date: 2017-08-15 | |
Final Drill Date: 2017-08-26 | |
Well Total Depth: 3677.00 m | |
Surface Hole Latitude: 55.652061 | |
Surface Hole Longitude: -119.078891 |
Date | Event |
---|---|
2017-08-01 | Obtained License |
2017-08-16 | Surface Casing Operation Performed |
2017-08-18 | Direction Drilling Operation Performed - Deviate |
2017-08-21 | Intermediate Casing Operation Performed |
2017-08-22 | Direction Drilling Operation Performed - Horizontal |
2017-08-26 | Finished Drilling |
2017-08-26 | Well Log Performed |
2017-08-26 | Well Mode changed to Drilled and Cased |
2017-08-27 | Liner Casing Operation Performed |
2017-08-27 | Rig Released |
2017-09-19 | Well Log Performed |
2017-10-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-10-30 | Well Began Production |
2017-10-30 | Well Fluid changed to Crude Oil |
2017-10-30 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-08-15 | Precision Drilling Corporation | 226 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-08-18 | 1445.70 | Deviate (5 - 79 degrees) |
2017-08-22 | 1967.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-10-15 | Multi-Stage Fracture | 3652.40 | 3652.50 | 0 |
2017-10-15 | Multi-Stage Fracture | 3167.90 | 3168.00 | 0 |
2017-10-15 | Multi-Stage Fracture | 3120.60 | 3120.70 | 0 |
2017-10-15 | Multi-Stage Fracture | 3061.20 | 3061.30 | 0 |
2017-10-15 | Multi-Stage Fracture | 3013.70 | 3013.80 | 0 |
2017-10-15 | Multi-Stage Fracture | 2954.70 | 2954.80 | 0 |
2017-10-15 | Multi-Stage Fracture | 2907.20 | 2907.30 | 0 |
2017-10-15 | Multi-Stage Fracture | 2848.20 | 2848.30 | 0 |
2017-10-15 | Multi-Stage Fracture | 2789.30 | 2789.40 | 0 |
2017-10-15 | Multi-Stage Fracture | 2730.00 | 2730.10 | 0 |
2017-10-15 | Multi-Stage Fracture | 2670.40 | 2670.50 | 0 |
2017-10-15 | Multi-Stage Fracture | 3593.70 | 3593.80 | 0 |
2017-10-15 | Multi-Stage Fracture | 2610.90 | 2611.00 | 0 |
2017-10-15 | Multi-Stage Fracture | 2551.50 | 2551.60 | 0 |
2017-10-15 | Multi-Stage Fracture | 2492.10 | 2492.20 | 0 |
2017-10-15 | Multi-Stage Fracture | 2433.00 | 2433.10 | 0 |
2017-10-15 | Multi-Stage Fracture | 2374.30 | 2374.40 | 0 |
2017-10-15 | Multi-Stage Fracture | 2315.10 | 2315.20 | 0 |
2017-10-15 | Multi-Stage Fracture | 2255.80 | 2255.90 | 0 |
2017-10-15 | Multi-Stage Fracture | 3546.50 | 3546.60 | 0 |
2017-10-15 | Multi-Stage Fracture | 3487.80 | 3487.90 | 0 |
2017-10-15 | Multi-Stage Fracture | 3440.10 | 3440.20 | 0 |
2017-10-15 | Multi-Stage Fracture | 3381.00 | 3381.10 | 0 |
2017-10-15 | Multi-Stage Fracture | 3333.30 | 3333.40 | 0 |
2017-10-15 | Multi-Stage Fracture | 3274.30 | 3274.40 | 0 |
2017-10-15 | Multi-Stage Fracture | 3226.90 | 3227.00 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-10-15 | 2017-10-15 | 1,815 | 5,678 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 90.6567 | N/A | |||
Prime Plus (40/70) | Canyon Technical Services | No specific ingredients | Not Available | 100 | 3.3083 | N/A | ||
Sand (40/70) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 5.1479 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 5.1479 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 5.1479 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 5.1479 | N/A | ||||
Sand (50/140) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 0.472 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 0.472 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 0.472 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 0.472 | N/A | ||||
HCL 15% | Canyon Technical Services | Acid | Hydrogen Chloride | 7647-01-0 | 100 | 0.5053 | N/A | |
Water | 7732-18-5 | 100 | 0.5053 | N/A | ||||
CC-8 Clay Stabilizer | Trican Well Service | Clay Control | choline chloride | 67-48-1 | 100 | 0.1001 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.1001 | N/A | ||||
CAN-1000 Corrosion Inhibitor | Canyon Technical Services | Corrosion Inhibitor | Refer to MSDS | 8141 | 100 | 0.0006 | N/A | |
CAN-1200 Anti-Sludge Agent / Non-Emulsifier | Canyon Technical Services | Demulsifier | Refer to MSDS | 8251 | 100 | 0.0012 | N/A | |
CAN-2412 Non-emulsifier | Canyon Technical Services | Demulsifier | 1-Hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0876 | N/A | |
Benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol (1:1) |
26836-07-7 | 100 | 0.0876 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0876 | N/A | ||||
Poly(oxyethelyne. oxypropylene) copolymer. liquids | 11/6/9003 | 100 | 0.0876 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0876 | N/A | ||||
CAN-2057 Friction Reducer | Canyon Technical Services | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0482 | N/A | |
CAN-1101 Iron Control Reduction | Canyon Technical Services | Iron Control | 2-Mercaptoethanol | 60-24-2 | 100 | 0.0018 | N/A | |
Cupric Chloride | 7447-39-4 | 100 | 0.0018 | N/A | ||||
Monoethanolamine | 141-43-5 | 100 | 0.0018 | N/A | ||||
CAN-1404 Paraffin Inhibitor | Canyon Technical Services | Scale Inhibitor | Ethylene glycol monobutyl ether | 111-76-2 | 100 | 0.0002 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0002 | N/A | ||||
Monoethanolamine | 141-43-5 | 100 | 0.0002 | N/A | ||||
Non-hazardous base ingredient(s) | Not Available | 100 | 0.0002 | N/A | ||||
SI-14 Scale Inhibitor | Trican Well Service | Scale Inhibitor | methanol | 67-56-1 | 100 | 0.0363 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.0363 | N/A | ||||
CAN-1202 Acid Wetting Agent | Canyon Technical Services | Surfactant | 1-Methoxy-2-Propanol | 107-98-2 | 100 | 0.0012 | N/A | |
Water | 7732-18-5 | 100 | 0.0012 | N/A | ||||
S-4W (Surfactant) | Trican Well Service | Surfactant | coconut dethanolamide | 68603-42-9 | 100 | 0.0012 | N/A | |
diethanolamine | 111-42-2 | 100 | 0.0012 | N/A | ||||
fatty acids. coco. compds. with diethanolamine | 61790-63-4 | 100 | 0.0012 | N/A | ||||
glycerin | 56-81-5 | 100 | 0.0012 | N/A | ||||
methanol | 67-56-1 | 100 | 0.0012 | N/A | ||||
phosphoric acid. mixed decyl and octyl esters. compds. with diethanolamine |
68425-57-0 | 100 | 0.0012 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-10-15 | 2017-10-17 | Surface Water - Runoff | 5853 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 1488 | 0.0 | 0.0 | 0.0 |
2018 | 8707 | 0.0 | 0.0 | 0.0 |
2019 | 8265 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-08-26 | No Incident Encountered | 0.00 | 0.00 |
2017-10-29 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]