X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776062314002

Well Details

Well ID: 0776062314002
Loading map...
Location: 00/14-23-077-06W6/2
Location Alias: 00/14-23-77-06 W6M
Location Alias 2: 00/14-23-077-06 W6/02
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 06
Section: 23
County/Municipality: Municipal District of Spirit River No. 133
Well Name: PETRUS RYCROFT 14-23-77-6
Operator Name: Rising Star Resources Ltd.
License Number: 0120669
License Date: 1985-12-23
License Status: Issued
Spud Date: 1985-12-28
Final Drill Date: 1986-01-05
Well Total Depth: 1535.00 m
Surface Hole Latitude: 55.693047
Surface Hole Longitude: -118.815535

For data sources see[1][2]

Well History

Date Event
1985-12-23 Obtained License
1985-12-29 Surface Casing Operation Performed
1986-01-05 Finished Drilling
1986-01-05 Lost Circulation Occurred
1986-01-05 Well Mode changed to Drilled and Cased
1986-01-06 Drill Stem Test Performed
1986-01-06 Well Log Performed
1986-01-08 Production Casing Operation Performed
1986-01-08 Rig Released
1986-02-10 Perforation Treatment Performed - Jet Perforation
1987-09-07 Perforation Treatment Performed - Jet Perforation
1987-09-07 Well Log Performed
1987-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-09-11 Perforation Treatment Performed - Cement Squeeze
1987-10-01 Well Began Injection
1987-10-01 Well Fluid changed to Water
1987-10-01 Well Type changed to Injection
1990-08-22 Perforation Treatment Performed - Jet Perforation
1990-08-22 Well Log Performed
1990-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-28 Perforation Treatment Performed - Chemical Squeeze
1990-10-01 Well Fluid changed to Water
1990-10-01 Well Type changed to Injection
1995-03-17 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-02-10 Perforation 1417.00 1419.00 13
1995-03-17 Acid Treatment 1416.50 1419.50 0
1987-09-07 Perforation 1446.00 1447.00 13
1987-09-07 Perforation 1448.00 1450.00 13
1987-09-07 Perforation 1453.00 1460.00 13
1987-09-09 Acid Treatment 1446.00 1460.00 0
1987-09-11 Cement Squeeze 1417.00 1419.00 0
1990-08-22 Perforation 1416.50 1419.50 13
1990-08-27 Acid Treatment 1416.50 1419.50 0
1990-08-28 Chemical Squeeze 1416.50 1419.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1986-01-05 Lost Circulation 1455.00 1455.00

For data sources see[6]

References