X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776040508000

Well Details

Well ID: 0776040508000
Loading map...
Location: 00/08-05-077-04W6/0
Location Alias: 00/08-05-77-04 W6M
Location Alias 2: 00/08-05-077-04 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 04
Section: 05
County/Municipality: Birch Hills County
Well Name: PACIFIC GAS EXPLORATION RYCROFT NO 1
Operator Name: Suncor Energy Inc.
License Number: 0004871
License Date: 1952-06-19
License Status: RecCertified
Spud Date: 1952-06-29
Final Drill Date: 1952-08-27
Well Total Depth: 1854.10 m
Surface Hole Latitude: 55.641483
Surface Hole Longitude: -118.572687

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-06-19 Obtained License
1952-07-06 Drill Stem Test Performed
1952-07-07 Drill Stem Test Performed
1952-07-09 Drill Stem Test Performed
1952-07-14 Drill Stem Test Performed
1952-07-17 Drill Stem Test Performed
1952-07-18 Drill Stem Test Performed
1952-07-19 Drill Stem Test Performed
1952-07-20 Drill Stem Test Performed
1952-07-24 Drill Stem Test Performed
1952-07-25 Drill Stem Test Performed
1952-08-10 Drill Stem Test Performed
1952-08-14 Drill Stem Test Performed
1952-08-18 Drill Stem Test Performed
1952-08-20 Drill Stem Test Performed
1952-08-27 Finished Drilling
1952-08-30 Production Casing Operation Performed
1952-09-02 Perforation Treatment Performed - Bullet Perforation
1952-09-06 Perforation Treatment Performed - Cement Squeeze
1952-09-07 Drill Stem Test Performed
1952-09-07 Perforation Treatment Performed - Cement Squeeze
1952-09-07 Perforation Treatment Performed - Selective Bullet Perforations
1952-09-10 Perforation Treatment Performed - Selective Jet Perforations
1952-09-11 Drill Stem Test Performed
1952-09-11 Perforation Treatment Performed - Bullet Perforation
1952-09-11 Perforation Treatment Performed - Jet Perforation
1952-09-13 Perforation Treatment Performed - Bullet Perforation
1952-09-13 Perforation Treatment Performed - Jet Perforation
1952-09-26 Well Mode changed to Drilled and Cased
1953-09-21 Perforation Treatment Performed - Bullet Perforation
1953-09-21 Perforation Treatment Performed - Jet Perforation
1954-01-14 Well Began Production
1954-01-14 Well Fluid changed to Gas
1954-01-14 Well Mode changed to Flowing
1958-03-10 Perforation Treatment Performed - Cement Squeeze
1958-03-20 Perforation Treatment Performed - Bullet Perforation
1958-03-22 Perforation Treatment Performed - Acid Wash - No Pressure
1958-03-26 Perforation Treatment Performed - Cement Squeeze
1958-03-27 Perforation Treatment Performed - Bullet Perforation
1958-08-07 Well Fluid changed to Gas
1958-08-07 Well Mode changed to Suspended
1962-11-20 Perforation Treatment Performed - Cement Squeeze
1962-11-21 Perforation Treatment Performed - Bullet Perforation
1962-11-22 Perforation Treatment Performed - Cement Squeeze
1962-12-10 Perforation Treatment Performed - Cement Squeeze
1962-12-28 Well Fluid changed to Gas
1962-12-28 Well Mode changed to Flowing
1967-03-10 Well Fluid changed to Gas
1967-03-10 Well Mode changed to Suspended
1973-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1973-09-19 Well Abandoned
1973-09-19 Well Fluid changed to Gas
1973-09-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-09-02 Bullet Perforation 1285.60 1286.00 13
1953-09-21 Perforation 1269.80 1277.10 13
1953-09-21 Bullet Perforation 1269.80 1277.10 13
1958-03-10 Cement Squeeze 1264.00 1277.10 0
1958-03-20 Bullet Perforation 1281.70 1283.50 20
1958-03-22 Acid Wash 1281.70 1283.50 0
1958-03-26 Cement Squeeze 1281.70 1283.50 0
1958-03-27 Bullet Perforation 1280.80 1281.70 13
1962-11-20 Cement Squeeze 1280.80 1281.70 0
1962-11-21 Bullet Perforation 1270.40 1276.20 7
1962-11-22 Cement Squeeze 1270.40 1276.20 0
1952-09-06 Cement Squeeze 1285.60 1286.00 0
1962-12-10 Cement Squeeze 1270.40 1276.20 0
1973-09-19 Packing Device Capped w/Cement 1251.20 1251.20 0
1952-09-07 Selective Bullet Perforations 1286.00 1286.00 0
1952-09-07 Cement Squeeze 1286.00 1286.00 0
1952-09-10 Selective Jet Perforations 1264.00 1264.00 0
1952-09-11 Perforation 1268.60 1272.50 13
1952-09-11 Bullet Perforation 1268.60 1272.50 13
1952-09-13 Perforation 1272.50 1277.10 13
1952-09-13 Bullet Perforation 1272.50 1277.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0

For data sources see[5]

References