X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776012516000

Well Details

Well ID: 0776012516000
Loading map...
Location: 00/16-25-077-01W6/0
Location Alias: 00/16-25-77-01 W6M
Location Alias 2: 00/16-25-077-01 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 01
Section: 25
County/Municipality: Birch Hills County
Well Name: CNRL CINDY 16-25-77-1
Operator Name: Canadian Natural Resources Limited
License Number: 0110729
License Date: 1984-11-13
License Status: Suspension
Spud Date: 1984-11-18
Final Drill Date: 1984-12-20
Well Total Depth: 2378.60 m
Surface Hole Latitude: 55.707367
Surface Hole Longitude: -118.002906

For data sources see[1][2]

Well History

Date Event
1984-11-13 Obtained License
1984-11-21 Surface Casing Operation Performed
1984-12-11 Kick Occurred
1984-12-14 Lost Circulation Occurred
1984-12-20 Finished Drilling
1984-12-20 Well Mode changed to Drilled and Cased
1984-12-21 Well Log Performed
1984-12-23 Drill Stem Test Performed
1984-12-26 Drill Stem Test Performed
1984-12-29 Drill Stem Test Performed
1985-01-01 Drill Stem Test Performed
1985-01-03 Drill Stem Test Performed
1985-01-06 Production Casing Operation Performed
1985-01-07 Rig Released
1985-01-22 Well Log Performed
1985-01-23 Perforation Treatment Performed - Jet Perforation
1985-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-01-27 Well Began Production
1985-01-27 Well Fluid changed to Crude Oil
1985-01-27 Well Mode changed to Flowing
1985-03-05 Well Log Performed
1985-03-06 Perforation Treatment Performed - Jet Perforation
1985-03-06 Well Log Performed
1985-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-04 Well Fluid changed to Crude Oil
1985-04-04 Well Mode changed to Suspended
1985-08-23 Well Fluid changed to Crude Oil
1985-08-23 Well Mode changed to Pumping
1986-02-01 Well Fluid changed to Crude Oil
1986-02-01 Well Mode changed to Suspended
1987-07-08 Well Log Performed
1987-08-07 Well Log Performed
1987-08-08 Perforation Treatment Performed - Jet Perforation
1987-08-10 Perforation Treatment Performed - Remedial Casing
1987-08-28 Well Log Performed
1987-09-01 Plug Back Performed
1987-09-01 Well Fluid changed to Crude Oil
1987-09-01 Well Mode changed to Abandoned and Whipstocked
1987-09-07 Plug Back Performed
1987-09-14 Plug Back Performed
1999-02-24 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-01-23 Perforation 2123.50 2125.00 13
1985-01-23 Perforation 2130.00 2135.00 13
1985-01-26 Acid Treatment 2123.50 2135.00 0
1985-03-06 Perforation 2112.00 2117.00 13
1985-03-09 Acid Treatment 2112.00 2135.00 0
1987-08-08 Perforation 2108.40 2108.70 7
1987-08-10 Remedial Casing Cementing 2108.40 2108.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 1530 0.0 0.0 0.0
1986 651 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-12-11 Kick 2100.00 2100.00
1984-12-14 Lost Circulation 2107.80 2113.40

For data sources see[6]

References