X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0775261305000

Well Details

Well ID: 0775261305000
Loading map...
Location: 00/05-13-077-26W5/0
Location Alias: 00/05-13-77-26 W5M
Location Alias 2: 00/05-13-077-26 W5/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 5
Range: 26
Section: 13
County/Municipality: Birch Hills County
Well Name: CNRL EAGLE 5-13-77-26
Operator Name: Canadian Natural Resources Limited
License Number: 0003900
License Date: 1951-12-05
License Status: Suspension
Spud Date: 1952-02-04
Final Drill Date: 1952-07-20
Well Total Depth: 2390.90 m
Surface Hole Latitude: 55.670533
Surface Hole Longitude: -117.904017

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-12-05 Obtained License
1952-02-04 Direction Drilling Operation Performed - 98
1952-03-03 Drill Stem Test Performed
1952-03-04 Drill Stem Test Performed
1952-03-07 Drill Stem Test Performed
1952-03-13 Drill Stem Test Performed
1952-03-14 Drill Stem Test Performed
1952-03-17 Drill Stem Test Performed
1952-03-21 Drill Stem Test Performed
1952-03-23 Drill Stem Test Performed
1952-03-24 Drill Stem Test Performed
1952-03-31 Drill Stem Test Performed
1952-04-06 Drill Stem Test Performed
1952-04-08 Drill Stem Test Performed
1952-04-10 Drill Stem Test Performed
1952-04-11 Drill Stem Test Performed
1952-04-13 Drill Stem Test Performed
1952-07-03 Drill Stem Test Performed
1952-07-18 Drill Stem Test Performed
1952-07-20 Finished Drilling
1952-07-23 Liner Casing Operation Performed
1952-08-01 Well Mode changed to Drilled and Cased
1952-08-16 Perforation Treatment Performed - Jet Perforation
1952-08-19 Perforation Treatment Performed - Acid Wash - No Pressure
1952-08-22 Perforation Treatment Performed - Acid Wash - No Pressure
1968-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-02-20 Perforation Treatment Performed - Jet Perforation
1968-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1968-02-24 Perforation Treatment Performed - Jet Perforation
1968-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-02-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1968-02-29 Perforation Treatment Performed - Jet Perforation
1968-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-06-23 Well Began Production
1980-06-23 Well Fluid changed to Gas
1980-06-23 Well Mode changed to Flowing
1991-11-02 Perforation Treatment Performed - Jet Perforation
1991-11-02 Well Log Performed
1991-11-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-10-01 Well Fluid changed to Gas
2015-10-01 Well Mode changed to Pumping
2016-12-31 Well Fluid changed to Gas
2016-12-31 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1952-02-04 2149.10 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-08-16 Perforation 1436.20 1438.00 13
1968-02-24 Perforation 1571.50 1577.00 7
1968-02-25 Acid Treatment 1565.10 1577.00 0
1968-02-29 Packing Device Capped w/Cement 1551.40 1554.50 0
1968-02-29 Perforation 1505.70 1510.60 7
1968-02-29 Perforation 1510.60 1514.20 7
1968-02-29 Perforation 1516.10 1518.80 7
1968-03-03 Packing Device Capped w/Cement 1479.80 1485.60 0
1977-11-15 Acid Treatment 1430.10 1438.00 0
1991-11-02 Perforation 1460.90 1462.40 13
1991-11-02 Perforation 1463.30 1464.90 13
1952-08-16 Perforation 1430.10 1434.40 13
1991-11-02 Perforation 1473.10 1475.50 13
1991-11-03 Acid Treatment 1460.90 1475.50 0
1952-08-19 Acid Wash 1430.10 1438.00 0
1952-08-22 Acid Wash 1430.10 1438.00 0
1968-02-20 Perforation 1595.90 1602.00 7
1968-02-20 Acid Treatment 1595.90 1602.00 0
1968-02-24 Packing Device Capped w/Cement 1585.00 1591.10 0
1968-02-24 Perforation 1565.10 1566.10 7
1968-02-24 Perforation 1567.90 1570.30 7

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 408 0.0 0.0 0.0
1979 2402 0.0 0.0 0.0
1980 784 0.0 0.0 0.0
1981 3711 0.0 0.0 0.0
1982 5183 0.0 0.0 0.0
1983 3048 0.0 0.0 0.0
1984 3018 0.0 0.0 0.0
1985 3617 0.0 0.0 0.0
1986 4849 0.0 0.0 0.0
1987 5205 0.0 0.0 0.0
1988 5097 0.0 0.0 0.0
1989 5848 0.0 0.0 0.0
1990 3890 0.0 0.0 0.0
1991 3088 0.0 0.0 0.0
1992 7891 0.0 0.0 0.0
1993 8115 0.0 0.0 0.0
1994 7682 0.0 0.0 0.0
1995 8339 0.0 0.0 0.0
1996 7816 0.0 0.0 0.0
1997 8560 0.0 0.0 0.0
1998 8522 0.0 0.0 0.0
1999 7780 0.0 0.0 0.0
2000 8645 0.0 0.0 0.0
2001 8081 0.0 0.0 0.0
2002 8469 0.0 0.0 0.0
2003 8727 0.0 0.0 0.0
2004 8773 0.0 0.0 0.0
2005 8540 0.0 0.0 0.0
2006 8304 0.0 0.0 0.0
2007 8559 0.0 0.0 0.0
2008 8747 0.0 0.0 0.0
2009 8754 0.0 0.0 0.0
2010 8664 0.0 0.0 0.0
2011 8700 0.0 0.0 0.0
2012 8323 0.0 0.0 0.0
2013 8335 0.0 0.0 0.0
2014 8463 0.0 0.0 0.0
2015 8437 0.0 0.0 0.0
2016 2343 0.0 0.0 0.0

For data sources see[6]

References