X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0766132402020

Well Details

Well ID: 0766132402020
Loading map...
Location: 02/02-24-076-13W6/0
Location Alias: 02/02-24-76-13 W6M
Location Alias 2: 02/02-24-076-13 W6/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 6
Range: 13
Section: 24
County/Municipality: Saddle Hills County
Well Name: AVN GLACIER 2-24-76-13
Operator Name: Advantage Oil & Gas Ltd.
License Number: 0410573
License Date: 2009-05-22
License Status: Amended
Spud Date: 2009-09-09
Final Drill Date: 2009-09-25
Well Total Depth: 4030.00 m
Surface Hole Latitude: 55.605922
Surface Hole Longitude: -119.884675

For data sources see[1][2]

Well History

Date Event
2009-05-22 Obtained License
2009-09-09 Surface Casing Operation Performed
2009-09-15 Direction Drilling Operation Performed - Horizontal
2009-09-25 Finished Drilling
2009-09-25 Well Log Performed
2009-09-25 Well Mode changed to Drilled and Cased
2009-09-27 Production Casing Operation Performed
2009-09-28 Rig Released
2009-10-17 Perforation Treatment Performed - Open-Hole Completion
2009-10-18 Well Log Performed
2009-11-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-11-22 Perforation Treatment Performed - Multi-Stage Fracture
2009-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-11-26 Perforation Treatment Performed - Multi-Stage Fracture
2009-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-11-27 Perforation Treatment Performed - Jet Perforation
2009-11-27 Perforation Treatment Performed - Multi-Stage Fracture
2009-11-28 Perforation Treatment Performed - Fractured
2009-11-29 Perforation Treatment Performed - Multi-Stage Fracture
2009-11-30 Perforation Treatment Performed - Multi-Stage Fracture
2009-12-01 Perforation Treatment Performed - Multi-Stage Fracture
2009-12-02 Perforation Treatment Performed - Multi-Stage Fracture
2010-01-31 Well Began Production
2010-01-31 Well Fluid changed to Gas
2010-01-31 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-09-15 2165.70 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-10-17 Open Hole/Barefoot Completion 4015.00 4030.00 0
2009-11-29 Multi-Stage Fracture 3267.00 3268.00 0
2009-11-30 Multi-Stage Fracture 3079.00 3080.00 0
2009-12-01 Multi-Stage Fracture 2893.00 2894.00 0
2009-12-02 Multi-Stage Fracture 2693.00 2694.00 0
2009-11-22 Multi-Stage Fracture 4014.00 4015.00 0
2009-11-22 Acid Treatment 4014.00 4015.00 0
2009-11-26 Multi-Stage Fracture 3641.00 3642.00 0
2009-11-26 Acid Treatment 3641.00 3642.00 0
2009-11-27 Multi-Stage Fracture 3452.00 3453.00 0
2009-11-27 Perforation 3400.00 3402.00 20
2009-11-27 Acid Treatment 3400.00 3402.00 0
2009-11-28 Fracture 3400.00 3402.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 7151 0.0 0.0 0.0
2011 8393 0.0 0.0 0.0
2012 7608 0.0 0.0 0.0
2013 8121 0.0 0.0 0.0
2014 7549 0.0 0.0 0.0
2015 2820 0.0 0.0 0.0
2016 5036 0.0 0.0 0.0
2017 2589 0.0 0.0 0.0
2018 4105 0.0 0.0 0.0
2019 4562 0.0 0.0 0.0
2020 369 0.0 0.0 0.0

For data sources see[6]

References