X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0766131815020

Well Details

Well ID: 0766131815020
Loading map...
Location: 02/15-18-076-13W6/0
Location Alias: 02/15-18-76-13 W6M
Location Alias 2: 02/15-18-076-13 W6/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 6
Range: 13
Section: 18
County/Municipality: Saddle Hills County
Well Name: AVN 102 HZ PCOUPES 15-18-76-13
Operator Name: Advantage Oil & Gas Ltd.
License Number: 0484865
License Date: 2017-08-03
License Status: Issued
Spud Date: 2017-09-16
Final Drill Date: 2017-09-26
Well Total Depth: 4912.00 m
Surface Hole Latitude: 55.576072
Surface Hole Longitude: -119.972137

For data sources see[1][2]

Well History

Date Event
2017-08-03 Obtained License
2017-09-17 Surface Casing Operation Performed
2017-09-18 Direction Drilling Operation Performed - Deviate
2017-09-23 Direction Drilling Operation Performed - Horizontal
2017-09-26 Finished Drilling
2017-09-26 Well Log Performed
2017-09-26 Well Mode changed to Drilled and Cased
2017-09-28 Production Casing Operation Performed
2017-09-29 Rig Released
2017-12-10 Perforation Treatment Performed - Open-Hole Completion
2017-12-11 Well Log Performed
2018-02-25 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-26 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-27 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-17 Well Began Production
2018-03-17 Well Fluid changed to Gas
2018-03-17 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-09-16 Horizon Drilling Inc. 30 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-09-18 472.40 Deviate (5 - 79 degrees)
2017-09-23 2792.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-12-10 Open Hole/Barefoot Completion 4898.50 4912.00 0
2018-02-25 Multi-Stage Fracture 4296.40 4296.50 0
2018-02-26 Multi-Stage Fracture 4231.20 4231.30 0
2018-02-26 Multi-Stage Fracture 4153.40 4153.50 0
2018-02-26 Multi-Stage Fracture 4088.30 4088.40 0
2018-02-26 Multi-Stage Fracture 4011.20 4011.30 0
2018-02-26 Multi-Stage Fracture 3946.10 3946.20 0
2018-02-26 Multi-Stage Fracture 3868.40 3868.50 0
2018-02-26 Multi-Stage Fracture 3803.20 3803.30 0
2018-02-26 Multi-Stage Fracture 3738.00 3738.10 0
2018-02-26 Multi-Stage Fracture 3672.80 3672.90 0
2018-02-25 Multi-Stage Fracture 4887.10 4887.20 0
2018-02-26 Multi-Stage Fracture 3607.80 3607.90 0
2018-02-26 Multi-Stage Fracture 3542.60 3542.70 0
2018-02-26 Multi-Stage Fracture 3477.50 3477.60 0
2018-02-26 Multi-Stage Fracture 3412.40 3412.50 0
2018-02-27 Multi-Stage Fracture 3347.20 3347.30 0
2018-02-27 Multi-Stage Fracture 3282.00 3282.10 0
2018-02-27 Multi-Stage Fracture 3216.90 3217.00 0
2018-02-27 Multi-Stage Fracture 3151.70 3151.80 0
2018-02-27 Multi-Stage Fracture 3086.50 3086.60 0
2018-02-27 Multi-Stage Fracture 3021.30 3021.40 0
2018-02-25 Multi-Stage Fracture 4802.90 4803.00 0
2018-02-27 Multi-Stage Fracture 2956.10 2956.20 0
2018-02-27 Multi-Stage Fracture 2891.30 2891.40 0
2018-02-25 Multi-Stage Fracture 4725.10 4725.20 0
2018-02-25 Multi-Stage Fracture 4659.90 4660.00 0
2018-02-25 Multi-Stage Fracture 4582.10 4582.20 0
2018-02-25 Multi-Stage Fracture 4517.00 4517.10 0
2018-02-25 Multi-Stage Fracture 4439.20 4439.30 0
2018-02-25 Multi-Stage Fracture 4373.90 4374.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-02-25 2018-02-27 2,673 6,990 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 80.4551 N/A
Sand - Tier 1 (30/50) Trican Well Service Aluminum Oxide 1344-28-1 100 10.691 N/A
Crystalline silica. quartz 14808-60-7 100 10.691 N/A
Iron Oxide 1309-37-1 100 10.691 N/A
Titanium Oxide 13463-67-7 100 10.691 N/A
Sand - Tier 1 (40/70) Trican Well Service Aluminum Oxide 1344-28-1 100 7.1273 N/A
Crystalline silica. quartz 14808-60-7 100 7.1273 N/A
Iron Oxide 1309-37-1 100 7.1273 N/A
Titanium Oxide 13463-67-7 100 7.1274 N/A
AQUCAR DB20 Biocide Trican Well Service Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0101 N/A
2-mercaptoethanol 60-24-2 100 0.0101 N/A
dibromoacetonitrile 3252-43-5 100 0.0101 N/A
non-hazardous ingredients Not Available 100 0.0101 N/A
sodium bromide 7647-15-6 100 0.0101 N/A
EnCap HT Trican Well Service Breaker ammonium persulfate 7727-54-0 100 0.0051 N/A
cured acrylic resin Not Available 100 0.0051 N/A
silica crystalline 14808-60-7 100 0.0051 N/A
pH-13W High pH Adjuster Trican Well Service Buffer Methyl Alcohol 67-56-1 100 0.0488 N/A
Sodium Hydroxide 1310-73-2 100 0.0488 N/A
Water 7732-18-5 100 0.0488 N/A
CC-8 Clay Stabilizer Trican Well Service Clay Control choline chloride 67-48-1 100 0.1806 N/A
non-hazardous ingredients Not Available 100 0.1806 N/A
WXB-17 Instant Cross Linker Trican Well Service Crosslinker 2-aminoethanol 141-43-5 100 0.0416 N/A
orthoboric acid 26038-87-9 100 0.0416 N/A
Water 7732-18-5 100 0.0416 N/A
Nitrogen Gas Trican Well Service Energizing Fluid Nitrogen 7727-37-9 100 1.1887 N/A
Non-hazardous base ingredient(s) Not Available 100 1.1888 N/A
FR-23 Friction Reducer Trican Well Service Gelling Agent No hazardous ingredients Not Available 100 0.0796 N/A
WG-111LA (Rapid Gellant. Buffered) Trican Well Service Gelling Agent fumaric acid 110-17-8 100 0.0886 N/A
guar gum 9000-30-0 100 0.0886 N/A
solvent naphtha (petroleum). heavy aliphatic 64742-96-7 100 0.0886 N/A
nanoFLO 2 Trican Well Service Surfactant Refer to MSDS 1097 100 0.083 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-12-09 2017-12-09 Central Water Distribution Facility 36
2017-12-16 2017-12-16 Central Water Distribution Facility 20
2018-02-24 2018-02-24 Central Water Distribution Facility 7068
2018-02-23 2018-02-27 Surface Water - Lake 4656
2018-02-25 2018-02-27 Municipal Water 1467

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 4259 0.0 0.0 0.0
2019 8318 0.0 0.0 0.0
2020 1600 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-09-26 No Incident Encountered 0.00 0.00
2018-02-28 No Incident Encountered 0.00 0.00

For data sources see[10]

References