X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0766131808000

Well Details

Well ID: 0766131808000
Loading map...
Location: 00/08-18-076-13W6/0
Location Alias: 00/08-18-76-13 W6M
Location Alias 2: 00/08-18-076-13 W6/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 6
Range: 13
Section: 18
County/Municipality: Saddle Hills County
Well Name: AVN HZ GLACIER 8-18-76-13
Operator Name: Advantage Oil & Gas Ltd.
License Number: 0417677
License Date: 2010-01-20
License Status: Amended
Spud Date: 2010-07-04
Final Drill Date: 2010-07-22
Well Total Depth: 4133.00 m
Surface Hole Latitude: 55.576669
Surface Hole Longitude: -119.971664

For data sources see[1][2]

Well History

Date Event
2010-01-20 Obtained License
2010-07-06 Surface Casing Operation Performed
2010-07-11 Well Log Performed
2010-07-12 Direction Drilling Operation Performed - Horizontal
2010-07-21 Well Log Performed
2010-07-22 Finished Drilling
2010-07-22 Production Casing Operation Performed
2010-07-22 Well Mode changed to Drilled and Cased
2010-07-24 Rig Released
2010-09-26 Well Log Performed
2010-10-03 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-10-03 Perforation Treatment Performed - Fractured
2010-10-04 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-10-04 Perforation Treatment Performed - Fractured
2010-10-05 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-10-05 Perforation Treatment Performed - Fractured
2010-10-06 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-10-06 Perforation Treatment Performed - Fractured
2010-12-30 Well Began Production
2010-12-30 Well Fluid changed to Gas
2010-12-30 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-07-12 2210.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-10-03 Hydra Jet Perforation 4114.00 4115.00 3
2010-10-04 Hydra Jet Perforation 3694.00 3695.00 3
2010-10-04 Acid Treatment 3694.00 3695.00 0
2010-10-04 Fracture 3694.00 3695.00 0
2010-10-04 Hydra Jet Perforation 3554.00 3555.00 3
2010-10-04 Acid Treatment 3554.00 3555.00 0
2010-10-04 Fracture 3554.00 3555.00 0
2010-10-04 Hydra Jet Perforation 3414.00 3415.00 3
2010-10-04 Acid Treatment 3414.00 3415.00 0
2010-10-04 Fracture 3414.00 3415.00 0
2010-10-05 Hydra Jet Perforation 3274.00 3275.00 3
2010-10-03 Acid Treatment 4114.00 4115.00 0
2010-10-05 Acid Treatment 3274.00 3275.00 0
2010-10-05 Fracture 3274.00 3275.00 0
2010-10-05 Hydra Jet Perforation 3134.00 3135.00 3
2010-10-05 Acid Treatment 3134.00 3135.00 0
2010-10-05 Fracture 3134.00 3135.00 0
2010-10-05 Hydra Jet Perforation 2994.00 2995.00 3
2010-10-05 Acid Treatment 2994.00 2995.00 0
2010-10-05 Fracture 2994.00 2995.00 0
2010-10-05 Hydra Jet Perforation 2854.00 2855.00 3
2010-10-05 Acid Treatment 2854.00 2855.00 0
2010-10-03 Fracture 4114.00 4115.00 0
2010-10-05 Fracture 2854.00 2855.00 0
2010-10-05 Hydra Jet Perforation 2714.00 2715.00 3
2010-10-05 Acid Treatment 2714.00 2715.00 0
2010-10-05 Fracture 2714.00 2715.00 0
2010-10-06 Hydra Jet Perforation 2584.00 2585.00 3
2010-10-06 Acid Treatment 2584.00 2585.00 0
2010-10-06 Fracture 2584.00 2585.00 0
2010-10-03 Hydra Jet Perforation 3974.00 3975.00 3
2010-10-03 Acid Treatment 3974.00 3975.00 0
2010-10-03 Fracture 3974.00 3975.00 0
2010-10-04 Hydra Jet Perforation 3834.00 3835.00 3
2010-10-04 Acid Treatment 3834.00 3835.00 0
2010-10-04 Fracture 3834.00 3835.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 48 0.0 0.0 0.0
2011 8397 0.0 0.0 0.0
2012 8731 0.0 0.0 0.0
2013 8393 0.0 0.0 0.0
2014 8350 0.0 0.0 0.0
2015 6299 0.0 0.0 0.0
2016 7446 0.0 0.0 0.0
2017 8200 0.0 0.0 0.0
2018 5462 0.0 0.0 0.0
2019 7937 0.0 0.0 0.0
2020 2149 0.0 0.0 0.0

For data sources see[6]

References