X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0766130609000

Well Details

Well ID: 0766130609000
Loading map...
Location: 00/09-06-076-13W6/0
Location Alias: 00/09-06-76-13 W6M
Location Alias 2: 00/09-06-076-13 W6/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 6
Range: 13
Section: 06
County/Municipality: Saddle Hills County
Well Name: AVN HZ GLACIER 9-6-76-13
Operator Name: Advantage Oil & Gas Ltd.
License Number: 0422166
License Date: 2010-07-27
License Status: Issued
Spud Date: 2010-10-30
Final Drill Date: 2010-11-18
Well Total Depth: 5010.00 m
Surface Hole Latitude: 55.541765
Surface Hole Longitude: -119.963746

For data sources see[1][2]

Well History

Date Event
2010-07-27 Obtained License
2010-10-18 Well Log Performed
2010-11-01 Surface Casing Operation Performed
2010-11-04 Direction Drilling Operation Performed - Horizontal
2010-11-04 Well Log Performed
2010-11-18 Finished Drilling
2010-11-18 Well Log Performed
2010-11-18 Well Mode changed to Drilled and Cased
2010-11-20 Production Casing Operation Performed
2010-11-21 Rig Released
2011-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-02-11 Perforation Treatment Performed - Multi-Stage Fracture
2011-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-02-12 Perforation Treatment Performed - Multi-Stage Fracture
2011-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-02-13 Perforation Treatment Performed - Multi-Stage Fracture
2011-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-02-14 Perforation Treatment Performed - Multi-Stage Fracture
2011-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-02-15 Perforation Treatment Performed - Multi-Stage Fracture
2011-02-27 Well Log Performed
2011-08-11 Well Began Production
2011-08-11 Well Fluid changed to Gas
2011-08-11 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-11-04 2192.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-02-11 Multi-Stage Fracture 4990.00 4991.00 0
2011-02-12 Acid Treatment 4464.00 4465.00 0
2011-02-13 Multi-Stage Fracture 4324.00 4325.00 0
2011-02-13 Acid Treatment 4324.00 4325.00 0
2011-02-13 Multi-Stage Fracture 4184.00 4185.00 0
2011-02-13 Acid Treatment 4184.00 4185.00 0
2011-02-13 Multi-Stage Fracture 4044.00 4045.00 0
2011-02-13 Acid Treatment 4044.00 4045.00 0
2011-02-13 Multi-Stage Fracture 3904.00 3905.00 0
2011-02-13 Acid Treatment 3904.00 3905.00 0
2011-02-14 Multi-Stage Fracture 3764.00 3765.00 0
2011-02-11 Acid Treatment 4990.00 4991.00 0
2011-02-14 Acid Treatment 3764.00 3765.00 0
2011-02-14 Multi-Stage Fracture 3624.00 3625.00 0
2011-02-14 Acid Treatment 3624.00 3625.00 0
2011-02-14 Multi-Stage Fracture 3484.00 3485.00 0
2011-02-14 Acid Treatment 3484.00 3485.00 0
2011-02-14 Multi-Stage Fracture 3344.00 3345.00 0
2011-02-14 Acid Treatment 3344.00 3345.00 0
2011-02-14 Multi-Stage Fracture 3204.00 3205.00 0
2011-02-14 Acid Treatment 3204.00 3205.00 0
2011-02-15 Multi-Stage Fracture 3064.00 3065.00 0
2011-02-11 Multi-Stage Fracture 4884.00 4885.00 0
2011-02-15 Acid Treatment 3064.00 3065.00 0
2011-02-15 Multi-Stage Fracture 2924.00 2925.00 0
2011-02-15 Acid Treatment 2924.00 2925.00 0
2011-02-15 Multi-Stage Fracture 2784.00 2785.00 0
2011-02-15 Acid Treatment 2784.00 2785.00 0
2011-02-15 Multi-Stage Fracture 2644.00 2645.00 0
2011-02-15 Acid Treatment 2644.00 2645.00 0
2011-02-12 Acid Treatment 4884.00 4885.00 0
2011-02-12 Multi-Stage Fracture 4744.00 4745.00 0
2011-02-12 Acid Treatment 4744.00 4745.00 0
2011-02-12 Multi-Stage Fracture 4604.00 4605.00 0
2011-02-12 Acid Treatment 4604.00 4605.00 0
2011-02-12 Multi-Stage Fracture 4464.00 4465.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 3274 0.0 0.0 0.0
2012 8264 0.0 0.0 0.0
2013 8442 0.0 0.0 0.0
2014 8162 0.0 0.0 0.0
2015 6986 0.0 0.0 0.0
2016 6988 0.0 0.0 0.0
2017 8008 0.0 0.0 0.0
2018 7400 0.0 0.0 0.0
2019 6330 0.0 0.0 0.0
2020 1936 0.0 0.0 0.0

For data sources see[6]

References