If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0766130601000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.541638,"lon":-119.963829,"icon":""}]} |
Location: 00/01-06-076-13W6/0 | |
Location Alias: 00/01-06-76-13 W6M | |
Location Alias 2: 00/01-06-076-13 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 6 | |
Range: 13 | |
Section: 06 | |
County/Municipality: Saddle Hills County | |
Well Name: AVN HZ GLACIER 1-6-76-13 | |
Operator Name: Advantage Oil & Gas Ltd. | |
License Number: 0422167 | |
License Date: 2010-07-27 | |
License Status: Issued | |
Spud Date: 2010-10-10 | |
Final Drill Date: 2010-10-26 | |
Well Total Depth: 4760.00 m | |
Surface Hole Latitude: 55.541638 | |
Surface Hole Longitude: -119.963829 |
Date | Event |
---|---|
2010-07-27 | Obtained License |
2010-10-11 | Surface Casing Operation Performed |
2010-10-15 | Direction Drilling Operation Performed - Horizontal |
2010-10-20 | Well Log Performed |
2010-10-26 | Finished Drilling |
2010-10-26 | Well Log Performed |
2010-10-26 | Well Mode changed to Drilled and Cased |
2010-10-27 | Production Casing Operation Performed |
2010-10-28 | Rig Released |
2011-02-13 | Well Log Performed |
2011-02-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-02-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-02-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-02-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-02-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-02-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-02-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-02-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-03-19 | Well Log Performed |
2011-10-13 | Well Began Production |
2011-10-13 | Well Fluid changed to Gas |
2011-10-13 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-10-15 | 2213.30 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-17 | Multi-Stage Fracture | 4740.00 | 4741.00 | 0 |
2011-02-18 | Acid Treatment | 4184.00 | 4185.00 | 0 |
2011-02-18 | Multi-Stage Fracture | 4044.00 | 4045.00 | 0 |
2011-02-18 | Acid Treatment | 4044.00 | 4045.00 | 0 |
2011-02-18 | Multi-Stage Fracture | 3904.00 | 3905.00 | 0 |
2011-02-18 | Acid Treatment | 3904.00 | 3905.00 | 0 |
2011-02-18 | Multi-Stage Fracture | 3764.00 | 3765.00 | 0 |
2011-02-18 | Acid Treatment | 3764.00 | 3765.00 | 0 |
2011-02-19 | Multi-Stage Fracture | 3624.00 | 3625.00 | 0 |
2011-02-19 | Acid Treatment | 3624.00 | 3625.00 | 0 |
2011-02-19 | Multi-Stage Fracture | 3484.00 | 3485.00 | 0 |
2011-02-17 | Acid Treatment | 4740.00 | 4741.00 | 0 |
2011-02-19 | Acid Treatment | 3484.00 | 3485.00 | 0 |
2011-02-19 | Multi-Stage Fracture | 3344.00 | 3345.00 | 0 |
2011-02-19 | Acid Treatment | 3344.00 | 3345.00 | 0 |
2011-02-19 | Multi-Stage Fracture | 3204.00 | 3205.00 | 0 |
2011-02-19 | Acid Treatment | 3204.00 | 3205.00 | 0 |
2011-02-20 | Multi-Stage Fracture | 3064.00 | 3065.00 | 0 |
2011-02-20 | Acid Treatment | 3064.00 | 3065.00 | 0 |
2011-02-20 | Multi-Stage Fracture | 2924.00 | 2925.00 | 0 |
2011-02-20 | Acid Treatment | 2924.00 | 2925.00 | 0 |
2011-02-20 | Multi-Stage Fracture | 2784.00 | 2785.00 | 0 |
2011-02-17 | Multi-Stage Fracture | 4604.00 | 4605.00 | 0 |
2011-02-20 | Acid Treatment | 2784.00 | 2785.00 | 0 |
2011-02-20 | Multi-Stage Fracture | 2644.00 | 2645.00 | 0 |
2011-02-20 | Acid Treatment | 2644.00 | 2645.00 | 0 |
2011-02-17 | Acid Treatment | 4604.00 | 4605.00 | 0 |
2011-02-17 | Multi-Stage Fracture | 4464.00 | 4465.00 | 0 |
2011-02-17 | Acid Treatment | 4464.00 | 4465.00 | 0 |
2011-02-17 | Multi-Stage Fracture | 4324.00 | 4325.00 | 0 |
2011-02-18 | Acid Treatment | 4324.00 | 4325.00 | 0 |
2011-02-18 | Multi-Stage Fracture | 4184.00 | 4185.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1733 | 0.0 | 0.0 | 0.0 |
2012 | 7534 | 0.0 | 0.0 | 0.0 |
2013 | 8578 | 0.0 | 0.0 | 0.0 |
2014 | 8244 | 0.0 | 0.0 | 0.0 |
2015 | 5867 | 0.0 | 0.0 | 0.0 |
2016 | 5576 | 0.0 | 0.0 | 0.0 |
2017 | 8006 | 0.0 | 0.0 | 0.0 |
2018 | 7438 | 0.0 | 0.0 | 0.0 |
2019 | 6141 | 0.0 | 0.0 | 0.0 |
2020 | 1984 | 0.0 | 0.0 | 0.0 |
For data sources see[6]