If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0766130501020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.558617,"lon":-119.984562,"icon":""}]} |
Location: 02/01-05-076-13W6/0 | |
Location Alias: 02/01-05-76-13 W6M | |
Location Alias 2: 02/01-05-076-13 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 6 | |
Range: 13 | |
Section: 05 | |
County/Municipality: Saddle Hills County | |
Well Name: AVN HZ GLACIER 1-5-76-13 | |
Operator Name: Advantage Oil & Gas Ltd. | |
License Number: 0435577 | |
License Date: 2011-07-28 | |
License Status: Issued | |
Spud Date: 2011-09-15 | |
Final Drill Date: 2011-10-04 | |
Well Total Depth: 3970.00 m | |
Surface Hole Latitude: 55.558617 | |
Surface Hole Longitude: -119.984562 |
Date | Event |
---|---|
2011-07-28 | Obtained License |
2011-09-17 | Surface Casing Operation Performed |
2011-09-23 | Direction Drilling Operation Performed - Horizontal |
2011-10-04 | Finished Drilling |
2011-10-04 | Well Mode changed to Drilled and Cased |
2011-10-05 | Production Casing Operation Performed |
2011-10-05 | Well Log Performed |
2011-10-06 | Rig Released |
2011-11-05 | Well Log Performed |
2011-11-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-11-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-11-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-11-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-11-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-12-27 | Well Began Production |
2011-12-27 | Well Fluid changed to Gas |
2011-12-27 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-09-23 | 2158.20 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-11-15 | Multi-Stage Fracture | 3955.00 | 3956.00 | 0 |
2011-11-16 | Acid Treatment | 3471.00 | 3472.00 | 0 |
2011-11-16 | Multi-Stage Fracture | 3350.00 | 3351.00 | 0 |
2011-11-16 | Acid Treatment | 3350.00 | 3351.00 | 0 |
2011-11-16 | Multi-Stage Fracture | 3229.00 | 3230.00 | 0 |
2011-11-16 | Acid Treatment | 3229.00 | 3230.00 | 0 |
2011-11-16 | Multi-Stage Fracture | 3108.00 | 3109.00 | 0 |
2011-11-16 | Acid Treatment | 3108.00 | 3109.00 | 0 |
2011-11-17 | Multi-Stage Fracture | 2987.00 | 2988.00 | 0 |
2011-11-17 | Acid Treatment | 2987.00 | 2988.00 | 0 |
2011-11-18 | Multi-Stage Fracture | 2866.00 | 2867.00 | 0 |
2011-11-15 | Acid Treatment | 3955.00 | 3956.00 | 0 |
2011-11-18 | Acid Treatment | 2866.00 | 2867.00 | 0 |
2011-11-18 | Multi-Stage Fracture | 2745.00 | 2746.00 | 0 |
2011-11-18 | Acid Treatment | 2745.00 | 2746.00 | 0 |
2011-11-18 | Multi-Stage Fracture | 2624.00 | 2625.00 | 0 |
2011-11-18 | Acid Treatment | 2624.00 | 2625.00 | 0 |
2011-11-18 | Multi-Stage Fracture | 2614.00 | 2619.00 | 0 |
2011-11-18 | Acid Treatment | 2614.00 | 2619.00 | 0 |
2011-11-18 | Multi-Stage Fracture | 2503.00 | 2504.00 | 0 |
2011-11-18 | Acid Treatment | 2503.00 | 2504.00 | 0 |
2011-11-18 | Multi-Stage Fracture | 2496.00 | 2498.00 | 0 |
2011-11-15 | Multi-Stage Fracture | 3834.00 | 3835.00 | 0 |
2011-11-19 | Acid Treatment | 2496.00 | 2504.00 | 0 |
2011-11-15 | Acid Treatment | 3834.00 | 3835.00 | 0 |
2011-11-15 | Multi-Stage Fracture | 3713.00 | 3714.00 | 0 |
2011-11-15 | Acid Treatment | 3713.00 | 3714.00 | 0 |
2011-11-15 | Multi-Stage Fracture | 3592.00 | 3593.00 | 0 |
2011-11-16 | Acid Treatment | 3592.00 | 3593.00 | 0 |
2011-11-16 | Multi-Stage Fracture | 3471.00 | 3472.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 504 | 0.0 | 0.0 | 0.0 |
2012 | 7896 | 0.0 | 0.0 | 0.0 |
2013 | 8546 | 0.0 | 0.0 | 0.0 |
2014 | 7555 | 0.0 | 0.0 | 0.0 |
2015 | 864 | 0.0 | 0.0 | 0.0 |
2016 | 2048 | 0.0 | 0.0 | 0.0 |
2017 | 4389 | 0.0 | 0.0 | 0.0 |
2018 | 4031 | 0.0 | 0.0 | 0.0 |
2019 | 4301 | 0.0 | 0.0 | 0.0 |
2020 | 1705 | 0.0 | 0.0 | 0.0 |
For data sources see[6]