X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0766130416000

Well Details

Well ID: 0766130416000
Loading map...
Location: 00/16-04-076-13W6/0
Location Alias: 00/16-04-76-13 W6M
Location Alias 2: 00/16-04-076-13 W6/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 6
Range: 13
Section: 04
County/Municipality: Saddle Hills County
Well Name: AVN HZ GLACIER 16-4-76-13
Operator Name: Advantage Oil & Gas Ltd.
License Number: 0434452
License Date: 2011-06-17
License Status: Issued
Spud Date: 2011-08-09
Final Drill Date: 2011-08-27
Well Total Depth: 4690.00 m
Surface Hole Latitude: 55.549325
Surface Hole Longitude: -119.918785

For data sources see[1][2]

Well History

Date Event
2011-06-17 Obtained License
2011-08-12 Surface Casing Operation Performed
2011-08-15 Direction Drilling Operation Performed - Horizontal
2011-08-17 Well Log Performed
2011-08-20 Well Log Performed
2011-08-27 Finished Drilling
2011-08-27 Well Mode changed to Drilled and Cased
2011-08-29 Production Casing Operation Performed
2011-08-29 Rig Released
2011-11-21 Well Log Performed
2011-11-26 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-11-27 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-11-28 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-11-29 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-11-30 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-12-01 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-26 Well Began Production
2012-02-26 Well Fluid changed to Gas
2012-02-26 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-15 2196.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-26 Multi-Stage Fracture 4665.00 4666.00 0
2011-11-27 Acid Treatment 4181.00 4182.00 0
2011-11-28 Multi-Stage Fracture 4060.00 4061.00 0
2011-11-28 Acid Treatment 4060.00 4061.00 0
2011-11-28 Multi-Stage Fracture 3939.00 3940.00 0
2011-11-28 Acid Treatment 3939.00 3940.00 0
2011-11-28 Multi-Stage Fracture 3818.00 3819.00 0
2011-11-28 Acid Treatment 3818.00 3819.00 0
2011-11-28 Multi-Stage Fracture 3808.00 3813.00 0
2011-11-28 Acid Treatment 3808.00 3813.00 0
2011-11-29 Multi-Stage Fracture 3697.00 3698.00 0
2011-11-27 Acid Treatment 4665.00 4666.00 0
2011-11-29 Acid Treatment 3697.00 3698.00 0
2011-11-29 Multi-Stage Fracture 3576.00 3577.00 0
2011-11-29 Acid Treatment 3576.00 3577.00 0
2011-11-29 Multi-Stage Fracture 3455.00 3456.00 0
2011-11-29 Acid Treatment 3455.00 3456.00 0
2011-11-30 Multi-Stage Fracture 3334.00 3335.00 0
2011-11-30 Acid Treatment 3334.00 3335.00 0
2011-11-30 Multi-Stage Fracture 3213.00 3214.00 0
2011-11-30 Acid Treatment 3213.00 3214.00 0
2011-11-30 Multi-Stage Fracture 3092.00 3093.00 0
2011-11-27 Multi-Stage Fracture 4544.00 4545.00 0
2011-11-30 Acid Treatment 3092.00 3093.00 0
2011-11-30 Multi-Stage Fracture 2971.00 2972.00 0
2011-11-30 Acid Treatment 2971.00 2972.00 0
2011-11-30 Multi-Stage Fracture 2850.00 2851.00 0
2011-11-30 Acid Treatment 2850.00 2851.00 0
2011-11-30 Multi-Stage Fracture 2729.00 2730.00 0
2011-11-30 Acid Treatment 2729.00 2730.00 0
2011-12-01 Multi-Stage Fracture 2608.00 2609.00 0
2011-12-01 Acid Treatment 2608.00 2609.00 0
2011-11-27 Acid Treatment 4544.00 4545.00 0
2011-11-27 Multi-Stage Fracture 4423.00 4424.00 0
2011-11-27 Acid Treatment 4423.00 4424.00 0
2011-11-27 Multi-Stage Fracture 4302.00 4303.00 0
2011-11-27 Acid Treatment 4302.00 4303.00 0
2011-11-27 Multi-Stage Fracture 4181.00 4182.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 3775 0.0 0.0 0.0
2013 7820 0.0 0.0 0.0
2014 7396 0.0 0.0 0.0
2015 3482 0.0 0.0 0.0
2016 803 0.0 0.0 0.0
2017 7551 0.0 0.0 0.0
2018 6788 0.0 0.0 0.0
2019 6662 0.0 0.0 0.0
2020 1977 0.0 0.0 0.0

For data sources see[6]

References