If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0766130409020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.549235,"lon":-119.91948,"icon":""}]} |
Location: 02/09-04-076-13W6/0 | |
Location Alias: 02/09-04-76-13 W6M | |
Location Alias 2: 02/09-04-076-13 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 6 | |
Range: 13 | |
Section: 04 | |
County/Municipality: Saddle Hills County | |
Well Name: AVN 102 HZ GLACIER 9-4-76-13 | |
Operator Name: Advantage Oil & Gas Ltd. | |
License Number: 0434311 | |
License Date: 2011-06-14 | |
License Status: Amended | |
Spud Date: 2011-10-26 | |
Final Drill Date: 2011-11-09 | |
Well Total Depth: 3931.00 m | |
Surface Hole Latitude: 55.549235 | |
Surface Hole Longitude: -119.919480 |
Date | Event |
---|---|
2011-06-14 | Obtained License |
2011-10-28 | Surface Casing Operation Performed |
2011-10-31 | Direction Drilling Operation Performed - Horizontal |
2011-11-05 | Well Log Performed |
2011-11-09 | Finished Drilling |
2011-11-09 | Well Log Performed |
2011-11-09 | Well Mode changed to Drilled and Cased |
2011-11-11 | Production Casing Operation Performed |
2011-11-11 | Rig Released |
2011-11-20 | Well Log Performed |
2011-11-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-11-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-11-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-11-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-11-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-01 | Well Began Production |
2012-03-01 | Well Fluid changed to Gas |
2012-03-01 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-10-31 | 2194.30 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-11-22 | Multi-Stage Fracture | 3909.00 | 3910.00 | 0 |
2011-11-23 | Acid Treatment | 3425.00 | 3426.00 | 0 |
2011-11-24 | Multi-Stage Fracture | 3304.00 | 3305.00 | 0 |
2011-11-24 | Acid Treatment | 3304.00 | 3305.00 | 0 |
2011-11-24 | Multi-Stage Fracture | 3183.00 | 3184.00 | 0 |
2011-11-24 | Acid Treatment | 3183.00 | 3184.00 | 0 |
2011-11-24 | Multi-Stage Fracture | 3062.00 | 3063.00 | 0 |
2011-11-24 | Acid Treatment | 3062.00 | 3063.00 | 0 |
2011-11-25 | Multi-Stage Fracture | 2941.00 | 2942.00 | 0 |
2011-11-25 | Acid Treatment | 2941.00 | 2942.00 | 0 |
2011-11-25 | Multi-Stage Fracture | 2820.00 | 2821.00 | 0 |
2011-11-22 | Acid Treatment | 3909.00 | 3910.00 | 0 |
2011-11-25 | Acid Treatment | 2820.00 | 2821.00 | 0 |
2011-11-25 | Multi-Stage Fracture | 2699.00 | 2700.00 | 0 |
2011-11-25 | Acid Treatment | 2699.00 | 2700.00 | 0 |
2011-11-25 | Multi-Stage Fracture | 2578.00 | 2579.00 | 0 |
2011-11-25 | Acid Treatment | 2578.00 | 2579.00 | 0 |
2011-11-22 | Multi-Stage Fracture | 3788.00 | 3799.00 | 0 |
2011-11-23 | Acid Treatment | 3788.00 | 3789.00 | 0 |
2011-11-23 | Multi-Stage Fracture | 3667.00 | 3668.00 | 0 |
2011-11-23 | Acid Treatment | 3667.00 | 3668.00 | 0 |
2011-11-23 | Multi-Stage Fracture | 3546.00 | 3547.00 | 0 |
2011-11-23 | Acid Treatment | 3546.00 | 3547.00 | 0 |
2011-11-23 | Multi-Stage Fracture | 3425.00 | 3426.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 7173 | 0.0 | 0.0 | 0.0 |
2013 | 8029 | 0.0 | 0.0 | 0.0 |
2014 | 6934 | 0.0 | 0.0 | 0.0 |
2015 | 4327 | 0.0 | 0.0 | 0.0 |
2016 | 3969 | 0.0 | 0.0 | 0.0 |
2017 | 6704 | 0.0 | 0.0 | 0.0 |
2018 | 6623 | 0.0 | 0.0 | 0.0 |
2019 | 6110 | 0.0 | 0.0 | 0.0 |
2020 | 2078 | 0.0 | 0.0 | 0.0 |
For data sources see[6]