If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0766130403000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.558796,"lon":-119.984562,"icon":""}]} |
Location: 00/03-04-076-13W6/0 | |
Location Alias: 00/03-04-76-13 W6M | |
Location Alias 2: 00/03-04-076-13 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 6 | |
Range: 13 | |
Section: 04 | |
County/Municipality: Saddle Hills County | |
Well Name: AVN HZ GLACIER 3-4-76-13 | |
Operator Name: Advantage Oil & Gas Ltd. | |
License Number: 0435584 | |
License Date: 2011-07-28 | |
License Status: Amended | |
Spud Date: 2011-10-08 | |
Final Drill Date: 2011-10-28 | |
Well Total Depth: 4290.00 m | |
Surface Hole Latitude: 55.558796 | |
Surface Hole Longitude: -119.984562 |
Date | Event |
---|---|
2011-07-28 | Obtained License |
2011-10-10 | Surface Casing Operation Performed |
2011-10-15 | Direction Drilling Operation Performed - Horizontal |
2011-10-28 | Finished Drilling |
2011-10-28 | Well Log Performed |
2011-10-28 | Well Mode changed to Drilled and Cased |
2011-10-29 | Production Casing Operation Performed |
2011-10-29 | Rig Released |
2011-11-05 | Well Log Performed |
2011-11-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-11-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-11-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-11-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-11-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-11-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-12-15 | Well Began Production |
2011-12-15 | Well Fluid changed to Gas |
2011-12-15 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-10-15 | 2144.10 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-11-09 | Multi-Stage Fracture | 4269.00 | 4270.00 | 0 |
2011-11-10 | Acid Treatment | 4014.00 | 4019.00 | 0 |
2011-11-11 | Multi-Stage Fracture | 3906.00 | 3907.00 | 0 |
2011-11-11 | Acid Treatment | 3906.00 | 3907.00 | 0 |
2011-11-11 | Multi-Stage Fracture | 3785.00 | 3786.00 | 0 |
2011-11-11 | Acid Treatment | 3785.00 | 3786.00 | 0 |
2011-11-11 | Multi-Stage Fracture | 3664.00 | 3665.00 | 0 |
2011-11-12 | Acid Treatment | 3664.00 | 3665.00 | 0 |
2011-11-12 | Multi-Stage Fracture | 3543.00 | 3544.00 | 0 |
2011-11-12 | Acid Treatment | 3543.00 | 3544.00 | 0 |
2011-11-12 | Multi-Stage Fracture | 3422.00 | 3423.00 | 0 |
2011-11-09 | Acid Treatment | 4269.00 | 4270.00 | 0 |
2011-11-12 | Acid Treatment | 3422.00 | 3423.00 | 0 |
2011-11-12 | Multi-Stage Fracture | 3301.00 | 3302.00 | 0 |
2011-11-12 | Acid Treatment | 3301.00 | 3302.00 | 0 |
2011-11-12 | Multi-Stage Fracture | 3180.00 | 3181.00 | 0 |
2011-11-12 | Acid Treatment | 3180.00 | 3181.00 | 0 |
2011-11-13 | Multi-Stage Fracture | 3059.00 | 3060.00 | 0 |
2011-11-13 | Acid Treatment | 3059.00 | 3060.00 | 0 |
2011-11-13 | Multi-Stage Fracture | 2938.00 | 2939.00 | 0 |
2011-11-13 | Acid Treatment | 2938.00 | 2939.00 | 0 |
2011-11-13 | Multi-Stage Fracture | 2817.00 | 2818.00 | 0 |
2011-11-09 | Multi-Stage Fracture | 4148.00 | 4149.00 | 0 |
2011-11-13 | Acid Treatment | 2817.00 | 2818.00 | 0 |
2011-11-13 | Multi-Stage Fracture | 2696.00 | 2697.00 | 0 |
2011-11-13 | Acid Treatment | 2696.00 | 2697.00 | 0 |
2011-11-13 | Multi-Stage Fracture | 2575.00 | 2576.00 | 0 |
2011-11-13 | Acid Treatment | 2575.00 | 2576.00 | 0 |
2011-11-09 | Acid Treatment | 4148.00 | 4149.00 | 0 |
2011-11-10 | Multi-Stage Fracture | 4135.00 | 4140.00 | 0 |
2011-11-10 | Acid Treatment | 4135.00 | 4140.00 | 0 |
2011-11-10 | Multi-Stage Fracture | 4027.00 | 4028.00 | 0 |
2011-11-10 | Acid Treatment | 4027.00 | 4028.00 | 0 |
2011-11-10 | Multi-Stage Fracture | 4014.00 | 4019.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 712 | 0.0 | 0.0 | 0.0 |
2012 | 8250 | 0.0 | 0.0 | 0.0 |
2013 | 8630 | 0.0 | 0.0 | 0.0 |
2014 | 7288 | 0.0 | 0.0 | 0.0 |
2015 | 1927 | 0.0 | 0.0 | 0.0 |
2016 | 7999 | 0.0 | 0.0 | 0.0 |
2017 | 5473 | 0.0 | 0.0 | 0.0 |
2018 | 7025 | 0.0 | 0.0 | 0.0 |
2019 | 5120 | 0.0 | 0.0 | 0.0 |
2020 | 1241 | 0.0 | 0.0 | 0.0 |
For data sources see[6]