X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0766123012000

Well Details

Well ID: 0766123012000
Loading map...
Location: 00/12-30-076-12W6/0
Location Alias: 00/12-30-76-12 W6M
Location Alias 2: 00/12-30-076-12 W6/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 6
Range: 12
Section: 30
County/Municipality: Saddle Hills County
Well Name: AVN HZ GLACIER 12-30-76-12
Operator Name: Advantage Oil & Gas Ltd.
License Number: 0411862
License Date: 2009-08-17
License Status: Issued
Spud Date: 2009-10-04
Final Drill Date: 2009-10-22
Well Total Depth: 3960.00 m
Surface Hole Latitude: 55.605622
Surface Hole Longitude: -119.834762

For data sources see[1][2]

Well History

Date Event
2009-08-17 Obtained License
2009-10-06 Surface Casing Operation Performed
2009-10-10 Direction Drilling Operation Performed - Horizontal
2009-10-16 Well Log Performed
2009-10-19 Well Log Performed
2009-10-22 Finished Drilling
2009-10-22 Well Log Performed
2009-10-22 Well Mode changed to Drilled and Cased
2009-10-25 Production Casing Operation Performed
2009-10-25 Rig Released
2009-11-14 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-11-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-11-14 Perforation Treatment Performed - Fractured
2009-11-15 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-11-15 Perforation Treatment Performed - Fractured
2009-11-16 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-11-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-11-16 Perforation Treatment Performed - Fractured
2009-11-17 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-11-17 Perforation Treatment Performed - Fractured
2009-11-18 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-11-18 Perforation Treatment Performed - Fractured
2010-01-02 Well Began Production
2010-01-02 Well Fluid changed to Gas
2010-01-02 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-10-10 2003.90 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-11-14 Hydra Jet Perforation 3924.00 3925.00 3
2009-11-15 Hydra Jet Perforation 3475.00 3476.00 3
2009-11-15 Acid Treatment 3475.00 3476.00 0
2009-11-15 Fracture 3475.00 3476.00 0
2009-11-15 Hydra Jet Perforation 3325.00 3326.00 3
2009-11-15 Acid Treatment 3325.00 3326.00 0
2009-11-16 Fracture 3325.00 3326.00 0
2009-11-16 Hydra Jet Perforation 3175.00 3176.00 3
2009-11-16 Acid Treatment 3175.00 3176.00 0
2009-11-16 Fracture 3175.00 3176.00 0
2009-11-16 Hydra Jet Perforation 3025.00 3026.00 3
2009-11-14 Acid Treatment 3924.00 3925.00 0
2009-11-16 Acid Treatment 3025.00 3026.00 0
2009-11-16 Fracture 3025.00 3026.00 0
2009-11-17 Hydra Jet Perforation 2861.00 2862.00 3
2009-11-17 Acid Treatment 2861.00 2862.00 0
2009-11-17 Fracture 2861.00 2862.00 0
2009-11-17 Hydra Jet Perforation 2671.00 2672.00 3
2009-11-17 Acid Treatment 2671.00 2672.00 0
2009-11-17 Fracture 2671.00 2672.00 0
2009-11-18 Hydra Jet Perforation 2556.00 2557.00 3
2009-11-18 Acid Treatment 2556.00 2557.00 0
2009-11-14 Fracture 3924.00 3925.00 0
2009-11-18 Fracture 2556.00 2557.00 0
2009-11-18 Hydra Jet Perforation 2380.00 2381.00 3
2009-11-18 Acid Treatment 2380.00 2381.00 0
2009-11-18 Fracture 2380.00 2381.00 0
2009-11-15 Hydra Jet Perforation 3749.00 3750.00 3
2009-11-15 Acid Treatment 3749.00 3750.00 0
2009-11-15 Fracture 3749.00 3750.00 0
2009-11-15 Hydra Jet Perforation 3636.00 3637.00 3
2009-11-15 Acid Treatment 3636.00 3637.00 0
2009-11-15 Fracture 3636.00 3637.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 7428 0.0 0.0 0.0
2011 8516 0.0 0.0 0.0
2012 8458 0.0 0.0 0.0
2013 8543 0.0 0.0 0.0
2014 7995 0.0 0.0 0.0
2015 6512 0.0 0.0 0.0
2016 7513 0.0 0.0 0.0
2017 7390 0.0 0.0 0.0
2018 7017 0.0 0.0 0.0
2019 6984 0.0 0.0 0.0
2020 2160 0.0 0.0 0.0

For data sources see[6]

References