X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0766122008000

Well Details

Well ID: 0766122008000
Loading map...
Location: 00/08-20-076-12W6/0
Location Alias: 00/08-20-76-12 W6M
Location Alias 2: 00/08-20-076-12 W6/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 6
Range: 12
Section: 20
County/Municipality: Saddle Hills County
Well Name: AVN HZ GLACIER 8-20-76-12
Operator Name: Advantage Oil & Gas Ltd.
License Number: 0411861
License Date: 2009-08-17
License Status: Issued
Spud Date: 2009-09-13
Final Drill Date: 2009-09-30
Well Total Depth: 3930.00 m
Surface Hole Latitude: 55.605487
Surface Hole Longitude: -119.834762

For data sources see[1][2]

Well History

Date Event
2009-08-17 Obtained License
2009-09-15 Surface Casing Operation Performed
2009-09-19 Direction Drilling Operation Performed - Horizontal
2009-09-22 Well Log Performed
2009-09-23 Well Log Performed
2009-09-28 Well Log Performed
2009-09-30 Finished Drilling
2009-09-30 Well Log Performed
2009-09-30 Well Mode changed to Drilled and Cased
2009-10-02 Well Log Performed
2009-10-03 Production Casing Operation Performed
2009-10-03 Rig Released
2009-11-22 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-11-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-11-22 Perforation Treatment Performed - Fractured
2009-11-23 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-11-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-11-23 Perforation Treatment Performed - Fractured
2009-11-24 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-11-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-11-24 Perforation Treatment Performed - Fractured
2009-11-25 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-11-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-11-25 Perforation Treatment Performed - Fractured
2009-11-26 Perforation Treatment Performed - Fractured
2010-01-04 Well Began Production
2010-01-04 Well Fluid changed to Gas
2010-01-04 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-09-19 2003.90 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-11-22 Hydra Jet Perforation 3910.00 3911.00 3
2009-11-23 Acid Treatment 3615.00 3616.00 0
2009-11-23 Fracture 3615.00 3616.00 0
2009-11-24 Hydra Jet Perforation 3445.00 3446.00 3
2009-11-24 Acid Treatment 3445.00 3446.00 0
2009-11-24 Fracture 3445.00 3446.00 0
2009-11-24 Hydra Jet Perforation 3310.00 3311.00 3
2009-11-24 Acid Treatment 3310.00 3311.00 0
2009-11-24 Fracture 3310.00 3311.00 0
2009-11-24 Hydra Jet Perforation 3160.00 3161.00 3
2009-11-24 Acid Treatment 3160.00 3161.00 0
2009-11-22 Acid Treatment 3910.00 3911.00 0
2009-11-24 Fracture 3160.00 3161.00 0
2009-11-24 Hydra Jet Perforation 2980.00 2981.00 3
2009-11-24 Acid Treatment 2980.00 2981.00 0
2009-11-25 Fracture 2980.00 2981.00 0
2009-11-25 Hydra Jet Perforation 2839.00 2840.00 3
2009-11-25 Acid Treatment 2839.00 2840.00 0
2009-11-25 Fracture 2839.00 2840.00 0
2009-11-25 Hydra Jet Perforation 2673.00 2674.00 3
2009-11-25 Acid Treatment 2673.00 2674.00 0
2009-11-25 Fracture 2673.00 2674.00 0
2009-11-22 Fracture 3910.00 3911.00 0
2009-11-25 Hydra Jet Perforation 2527.00 2528.00 3
2009-11-25 Acid Treatment 2527.00 2528.00 0
2009-11-25 Fracture 2527.00 2528.00 0
2009-11-25 Hydra Jet Perforation 2384.00 2385.00 3
2009-11-25 Acid Treatment 2384.00 2385.00 0
2009-11-26 Fracture 2384.00 2385.00 0
2009-11-22 Hydra Jet Perforation 3770.00 3771.00 3
2009-11-23 Acid Treatment 3770.00 3771.00 0
2009-11-23 Hydra Jet Perforation 3760.00 3761.00 3
2009-11-23 Acid Treatment 3760.00 3761.00 0
2009-11-23 Fracture 3760.00 3761.00 0
2009-11-23 Hydra Jet Perforation 3615.00 3616.00 3

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 7432 0.0 0.0 0.0
2011 8068 0.0 0.0 0.0
2012 8602 0.0 0.0 0.0
2013 6499 0.0 0.0 0.0
2014 3822 0.0 0.0 0.0
2015 3076 0.0 0.0 0.0
2016 7392 0.0 0.0 0.0
2017 7306 0.0 0.0 0.0
2018 6592 0.0 0.0 0.0
2019 5249 0.0 0.0 0.0
2020 2044 0.0 0.0 0.0

For data sources see[6]

References