If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0766121713000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.578195,"lon":-119.811732,"icon":""}]} |
Location: 00/13-17-076-12W6/0 | |
Location Alias: 00/13-17-76-12 W6M | |
Location Alias 2: 00/13-17-076-12 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 6 | |
Range: 12 | |
Section: 17 | |
County/Municipality: Saddle Hills County | |
Well Name: AVN HZ GLACIER 13-17-76-12 | |
Operator Name: Advantage Oil & Gas Ltd. | |
License Number: 0436968 | |
License Date: 2011-09-20 | |
License Status: Issued | |
Spud Date: 2011-11-06 | |
Final Drill Date: 2011-11-24 | |
Well Total Depth: 4280.00 m | |
Surface Hole Latitude: 55.578195 | |
Surface Hole Longitude: -119.811732 |
Date | Event |
---|---|
2011-09-20 | Obtained License |
2011-11-08 | Surface Casing Operation Performed |
2011-11-11 | Direction Drilling Operation Performed - Horizontal |
2011-11-24 | Finished Drilling |
2011-11-24 | Well Log Performed |
2011-11-24 | Well Mode changed to Drilled and Cased |
2011-11-25 | Production Casing Operation Performed |
2011-11-26 | Rig Released |
2012-01-21 | Well Log Performed |
2012-01-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2012-01-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-01-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2012-01-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-01-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2012-01-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-01-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2012-01-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-31 | Well Began Production |
2012-03-31 | Well Fluid changed to Gas |
2012-03-31 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-11-11 | 2042.20 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-01-25 | Multi-Stage Fracture | 4260.00 | 4261.00 | 0 |
2012-01-26 | Acid Treatment | 3776.00 | 3777.00 | 0 |
2012-01-26 | Multi-Stage Fracture | 3655.00 | 3656.00 | 0 |
2012-01-26 | Acid Treatment | 3655.00 | 3656.00 | 0 |
2012-01-26 | Multi-Stage Fracture | 3534.00 | 3535.00 | 0 |
2012-01-26 | Acid Treatment | 3534.00 | 3535.00 | 0 |
2012-01-27 | Multi-Stage Fracture | 3413.00 | 3414.00 | 0 |
2012-01-27 | Acid Treatment | 3413.00 | 3414.00 | 0 |
2012-01-27 | Multi-Stage Fracture | 3292.00 | 3293.00 | 0 |
2012-01-27 | Acid Treatment | 3292.00 | 3293.00 | 0 |
2012-01-27 | Multi-Stage Fracture | 3171.00 | 3172.00 | 0 |
2012-01-25 | Acid Treatment | 4260.00 | 4261.00 | 0 |
2012-01-27 | Acid Treatment | 3171.00 | 3172.00 | 0 |
2012-01-27 | Multi-Stage Fracture | 3050.00 | 3051.00 | 0 |
2012-01-27 | Acid Treatment | 3050.00 | 3051.00 | 0 |
2012-01-28 | Multi-Stage Fracture | 2929.00 | 2930.00 | 0 |
2012-01-28 | Acid Treatment | 2929.00 | 2930.00 | 0 |
2012-01-28 | Multi-Stage Fracture | 2808.00 | 2809.00 | 0 |
2012-01-28 | Acid Treatment | 2808.00 | 2809.00 | 0 |
2012-01-28 | Multi-Stage Fracture | 2687.00 | 2688.00 | 0 |
2012-01-28 | Acid Treatment | 2687.00 | 2688.00 | 0 |
2012-01-28 | Multi-Stage Fracture | 2566.00 | 2567.00 | 0 |
2012-01-25 | Multi-Stage Fracture | 4139.00 | 4140.00 | 0 |
2012-01-28 | Acid Treatment | 2566.00 | 2567.00 | 0 |
2012-01-25 | Acid Treatment | 4139.00 | 4140.00 | 0 |
2012-01-26 | Multi-Stage Fracture | 4018.00 | 4019.00 | 0 |
2012-01-26 | Acid Treatment | 4018.00 | 4019.00 | 0 |
2012-01-26 | Multi-Stage Fracture | 3897.00 | 3898.00 | 0 |
2012-01-26 | Acid Treatment | 3897.00 | 3898.00 | 0 |
2012-01-26 | Multi-Stage Fracture | 3776.00 | 3777.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6449 | 0.0 | 0.0 | 0.0 |
2013 | 7145 | 0.0 | 0.0 | 0.0 |
2014 | 7375 | 0.0 | 0.0 | 0.0 |
2015 | 7497 | 0.0 | 0.0 | 0.0 |
2016 | 8318 | 0.0 | 0.0 | 0.0 |
2017 | 8524 | 0.0 | 0.0 | 0.0 |
2018 | 7417 | 0.0 | 0.0 | 0.0 |
2019 | 6572 | 0.0 | 0.0 | 0.0 |
2020 | 2126 | 0.0 | 0.0 | 0.0 |
For data sources see[6]