If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0766120813W20 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.567996,"lon":-119.811777,"icon":""}]} |
Location: W2/13-08-076-12W6/0 | |
Location Alias: W2/13-08-76-12 W6M | |
Location Alias 2: W2/13-08-076-12 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 6 | |
Range: 12 | |
Section: 08 | |
County/Municipality: Saddle Hills County | |
Well Name: AVN 103 HZ PCOUPES 13-8-76-12 | |
Operator Name: Advantage Oil & Gas Ltd. | |
License Number: 0489322 | |
License Date: 2018-05-30 | |
License Status: Amended | |
Spud Date: 2018-10-23 | |
Final Drill Date: 2018-10-31 | |
Well Total Depth: 4175.00 m | |
Surface Hole Latitude: 55.567996 | |
Surface Hole Longitude: -119.811777 |
Date | Event |
---|---|
2018-05-30 | Obtained License |
2018-10-23 | Surface Casing Operation Performed |
2018-10-28 | Well Log Performed |
2018-10-30 | Well Log Performed |
2018-10-31 | Direction Drilling Operation Performed - Deviate |
2018-10-31 | Direction Drilling Operation Performed - Horizontal |
2018-10-31 | Finished Drilling |
2018-10-31 | Well Log Performed |
2018-10-31 | Well Mode changed to Drilled and Cased |
2018-11-01 | Production Casing Operation Performed |
2018-11-01 | Rig Released |
2018-12-11 | Perforation Treatment Performed - Open-Hole Completion |
2018-12-11 | Well Log Performed |
2019-01-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-01-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-01-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-01-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-01-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-28 | Well Began Production |
2019-02-28 | Well Fluid changed to Gas |
2019-02-28 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2018-10-31 | 845.60 | Deviate (5 - 79 degrees) |
2018-10-31 | 2639.80 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-12-11 | Open Hole/Barefoot Completion | 4166.00 | 4175.00 | 0 |
2019-01-18 | Multi-Stage Fracture | 3755.70 | 3756.30 | 0 |
2019-01-18 | Multi-Stage Fracture | 3704.20 | 3704.80 | 0 |
2019-01-19 | Multi-Stage Fracture | 3664.40 | 3665.00 | 0 |
2019-01-19 | Multi-Stage Fracture | 3612.10 | 3612.70 | 0 |
2019-01-19 | Multi-Stage Fracture | 3559.60 | 3560.30 | 0 |
2019-01-19 | Multi-Stage Fracture | 3519.80 | 3520.40 | 0 |
2019-01-19 | Multi-Stage Fracture | 3467.50 | 3468.10 | 0 |
2019-01-19 | Multi-Stage Fracture | 3415.20 | 3416.40 | 0 |
2019-01-20 | Multi-Stage Fracture | 3362.80 | 3364.00 | 0 |
2019-01-20 | Multi-Stage Fracture | 3322.80 | 3324.10 | 0 |
2019-01-17 | Multi-Stage Fracture | 4154.60 | 4155.20 | 0 |
2019-01-20 | Multi-Stage Fracture | 3270.30 | 3271.50 | 0 |
2019-01-20 | Multi-Stage Fracture | 3217.80 | 3219.10 | 0 |
2019-01-20 | Multi-Stage Fracture | 3178.00 | 3179.20 | 0 |
2019-01-20 | Multi-Stage Fracture | 3125.80 | 3127.00 | 0 |
2019-01-20 | Multi-Stage Fracture | 3073.70 | 3074.90 | 0 |
2019-01-20 | Multi-Stage Fracture | 3021.40 | 3022.70 | 0 |
2019-01-21 | Multi-Stage Fracture | 2981.60 | 2982.80 | 0 |
2019-01-21 | Multi-Stage Fracture | 2929.20 | 2930.40 | 0 |
2019-01-21 | Multi-Stage Fracture | 2877.50 | 2878.70 | 0 |
2019-01-21 | Multi-Stage Fracture | 2825.20 | 2826.40 | 0 |
2019-01-17 | Multi-Stage Fracture | 4096.10 | 4096.70 | 0 |
2019-01-21 | Multi-Stage Fracture | 2785.40 | 2786.60 | 0 |
2019-01-21 | Multi-Stage Fracture | 2733.00 | 2734.20 | 0 |
2019-01-17 | Multi-Stage Fracture | 4056.20 | 4056.90 | 0 |
2019-01-17 | Multi-Stage Fracture | 4004.00 | 4004.60 | 0 |
2019-01-18 | Multi-Stage Fracture | 3951.80 | 3952.40 | 0 |
2019-01-18 | Multi-Stage Fracture | 3911.90 | 3912.50 | 0 |
2019-01-18 | Multi-Stage Fracture | 3859.90 | 3860.50 | 0 |
2019-01-18 | Multi-Stage Fracture | 3807.80 | 3808.50 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-01-17 | 2019-01-21 | 2,518 | 15,367 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 1.3778 | N/A | |||
water | Not Available | 100 | 88.3644 | N/A | ||||
Sand 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 5.9552 | N/A | ||
Sand 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 4.3914 | N/A | ||
AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0129 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0129 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0129 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0129 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0129 | N/A | ||||
Breaker HT | Trican | Breaker | ammonium persulfate | 7727-54-0 | 100 | 0.0018 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.0018 | N/A | ||||
pH-13W | Trican | Buffer | methanol | 67-56-1 | 100 | 0.0397 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.0397 | N/A | ||||
sodium hydroxide | 1310-73-2 | 100 | 0.0397 | N/A | ||||
CC-10 | Trican | Clay Control | non-hazardous ingredients | Not Available | 100 | 0.1009 | N/A | |
WXB-17 | Trican | Crosslinker | monoethanolamine | 141-43-5 | 100 | 0.0342 | N/A | |
monoethanolamine borate | 26038-87-9 | 100 | 0.0342 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0342 | N/A | ||||
FR-24 | Trican | Friction Reducer | distillates (petroleum). hydrotreated light naphthenic | 64742-53-6 | 100 | 0.0375 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.0375 | N/A | ||||
WG-111DA | Trican | Gelling Agent | fumaric acid | 110-17-8 | 100 | 0.0307 | N/A | |
guar gum | 9000-30-0 | 100 | 0.0307 | N/A | ||||
NMR-1N | Trican | Surfactant | methanol | 67-56-1 | 100 | 0.045 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.045 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-12-10 | 2018-12-10 | Central Water Distribution Facility | 31 |
2018-12-15 | 2018-12-15 | Central Water Distribution Facility | 66 |
2019-01-16 | 2019-01-16 | Central Water Distribution Facility | 124 |
2019-01-15 | 2019-01-20 | Surface Water - Lake | 9798 |
2019-01-15 | 2019-01-20 | Municipal Water | 8883 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 5710 | 0.0 | 0.0 | 0.0 |
2020 | 2172 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-11-01 | No Incident Encountered | 0.00 | 0.00 |
2019-01-21 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]