If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0766120409040 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.567644,"lon":-119.811287,"icon":""}]} |
Location: 04/09-04-076-12W6/0 | |
Location Alias: 04/09-04-76-12 W6M | |
Location Alias 2: 04/09-04-076-12 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 6 | |
Range: 12 | |
Section: 04 | |
County/Municipality: Saddle Hills County | |
Well Name: AVN 104 HZ PCOUPES 9-4-76-12 | |
Operator Name: Advantage Oil & Gas Ltd. | |
License Number: 0489323 | |
License Date: 2018-05-30 | |
License Status: Issued | |
Spud Date: 2018-08-28 | |
Final Drill Date: 2018-09-06 | |
Well Total Depth: 4275.00 m | |
Surface Hole Latitude: 55.567644 | |
Surface Hole Longitude: -119.811287 |
Date | Event |
---|---|
2018-05-30 | Obtained License |
2018-08-29 | Surface Casing Operation Performed |
2018-08-30 | Direction Drilling Operation Performed - Deviate |
2018-09-02 | Direction Drilling Operation Performed - Horizontal |
2018-09-02 | Well Log Performed |
2018-09-06 | Finished Drilling |
2018-09-06 | Well Log Performed |
2018-09-06 | Well Mode changed to Drilled and Cased |
2018-09-07 | Production Casing Operation Performed |
2018-09-07 | Rig Released |
2018-12-10 | Perforation Treatment Performed - Open-Hole Completion |
2018-12-10 | Well Log Performed |
2019-02-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-03-10 | Well Began Production |
2019-03-10 | Well Fluid changed to Gas |
2019-03-10 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-08-28 | Horizon Drilling Inc. | 30 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-08-30 | 844.60 | Deviate (5 - 79 degrees) |
2018-09-02 | 2552.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-12-10 | Open Hole/Barefoot Completion | 4260.00 | 4275.00 | 0 |
2019-02-11 | Multi-Stage Fracture | 3850.30 | 3851.00 | 0 |
2019-02-11 | Multi-Stage Fracture | 3798.30 | 3798.90 | 0 |
2019-02-12 | Multi-Stage Fracture | 3758.70 | 3759.40 | 0 |
2019-02-12 | Multi-Stage Fracture | 3706.90 | 3707.60 | 0 |
2019-02-13 | Multi-Stage Fracture | 3654.90 | 3655.50 | 0 |
2019-02-13 | Multi-Stage Fracture | 3602.40 | 3603.00 | 0 |
2019-02-13 | Multi-Stage Fracture | 3550.40 | 3551.00 | 0 |
2019-02-13 | Multi-Stage Fracture | 3510.70 | 3512.00 | 0 |
2019-02-13 | Multi-Stage Fracture | 3458.80 | 3460.00 | 0 |
2019-02-13 | Multi-Stage Fracture | 3406.40 | 3407.60 | 0 |
2019-02-11 | Multi-Stage Fracture | 4248.70 | 4249.30 | 0 |
2019-02-13 | Multi-Stage Fracture | 3354.50 | 3355.70 | 0 |
2019-02-13 | Multi-Stage Fracture | 3302.30 | 3303.50 | 0 |
2019-02-13 | Multi-Stage Fracture | 3262.60 | 3263.80 | 0 |
2019-02-13 | Multi-Stage Fracture | 3210.80 | 3212.00 | 0 |
2019-02-13 | Multi-Stage Fracture | 3158.50 | 3159.70 | 0 |
2019-02-13 | Multi-Stage Fracture | 3106.30 | 3107.50 | 0 |
2019-02-13 | Multi-Stage Fracture | 3054.00 | 3055.20 | 0 |
2019-02-14 | Multi-Stage Fracture | 3014.20 | 3015.40 | 0 |
2019-02-14 | Multi-Stage Fracture | 2962.00 | 2963.20 | 0 |
2019-02-14 | Multi-Stage Fracture | 2910.40 | 2911.60 | 0 |
2019-02-11 | Multi-Stage Fracture | 4202.70 | 4203.30 | 0 |
2019-02-14 | Multi-Stage Fracture | 2858.20 | 2859.40 | 0 |
2019-02-14 | Multi-Stage Fracture | 2805.60 | 2806.80 | 0 |
2019-02-14 | Multi-Stage Fracture | 2765.90 | 2767.20 | 0 |
2019-02-14 | Multi-Stage Fracture | 2714.00 | 2715.20 | 0 |
2019-02-14 | Multi-Stage Fracture | 2661.90 | 2663.10 | 0 |
2019-02-11 | Multi-Stage Fracture | 4150.30 | 4151.00 | 0 |
2019-02-11 | Multi-Stage Fracture | 4098.00 | 4098.70 | 0 |
2019-02-11 | Multi-Stage Fracture | 4045.80 | 4046.40 | 0 |
2019-02-11 | Multi-Stage Fracture | 3994.20 | 3994.80 | 0 |
2019-02-11 | Multi-Stage Fracture | 3954.50 | 3955.10 | 0 |
2019-02-11 | Multi-Stage Fracture | 3902.20 | 3902.80 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-02-11 | 2019-02-14 | 2,457 | 10,345 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 1.5831 | N/A | |||
water | Not Available | 100 | 82.4853 | N/A | ||||
Sand 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 9.7287 | N/A | ||
Sand 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 6.9704 | N/A | ||
AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0098 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0097 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0098 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0098 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0098 | N/A | ||||
Breaker HT | Trican | Breaker | ammonium persulfate | 7727-54-0 | 100 | 0.002 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.002 | N/A | ||||
pH-13W | Trican | Buffer | methanol | 67-56-1 | 100 | 0.0426 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.0426 | N/A | ||||
sodium hydroxide | 1310-73-2 | 100 | 0.0426 | N/A | ||||
CC-10 | Trican | Clay Control | non-hazardous ingredients | Not Available | 100 | 0.0907 | N/A | |
WXB-17 | Trican | Crosslinker | monoethanolamine | 141-43-5 | 100 | 0.0365 | N/A | |
monoethanolamine borate | 26038-87-9 | 100 | 0.0365 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0365 | N/A | ||||
FR-24 | Trican | Friction Reducer | distillates (petroleum). hydrotreated light naphthenic | 64742-53-6 | 100 | 0.0262 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.0262 | N/A | ||||
WG-111DA | Trican | Gelling Agent | fumaric acid | 110-17-8 | 100 | 0.0324 | N/A | |
guar gum | 9000-30-0 | 100 | 0.0324 | N/A | ||||
NMR-1N | Trican | Surfactant | methanol | 67-56-1 | 100 | 0.0395 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.0395 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-12-10 | 2018-12-10 | Central Water Distribution Facility | 32 |
2018-12-13 | 2018-12-13 | Central Water Distribution Facility | 60 |
2019-02-11 | 2019-02-11 | Central Water Distribution Facility | 1552 |
2019-02-11 | 2019-02-11 | Central Water Distribution Facility | 3078 |
2019-02-11 | 2019-02-12 | Surface Water - Lake | 7983 |
2019-02-11 | 2019-02-11 | Municipal Water | 2070 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 3696 | 0.0 | 0.0 | 0.0 |
2020 | 2140 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-09-07 | No Incident Encountered | 0.00 | 0.00 |
2019-02-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]