If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0766091706000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.58165,"lon":-119.348242,"icon":""}]} |
Location: 00/06-17-076-09W6/0 | |
Location Alias: 00/06-17-76-09 W6M | |
Location Alias 2: 00/06-17-076-09 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 6 | |
Range: 09 | |
Section: 17 | |
County/Municipality: Saddle Hills County | |
Well Name: CANAXAS ET AL VALHALLA 6-17-76-9 | |
Operator Name: TAQA North Ltd. | |
License Number: 0252396 | |
License Date: 2001-03-02 | |
License Status: Amended | |
Spud Date: 2001-03-09 | |
Final Drill Date: 2001-04-01 | |
Well Total Depth: 2508.00 m | |
Surface Hole Latitude: 55.581650 | |
Surface Hole Longitude: -119.348242 |
Date | Event |
---|---|
2001-03-02 | Obtained License |
2001-03-11 | Surface Casing Operation Performed |
2001-03-13 | Direction Drilling Operation Performed - Deviate |
2001-04-01 | Finished Drilling |
2001-04-01 | Well Log Performed |
2001-04-03 | Well Log Performed |
2001-04-05 | Production Casing Operation Performed |
2001-04-08 | Well Log Performed |
2001-04-09 | Liner Casing Operation Performed |
2001-04-09 | Rig Released |
2001-04-09 | Well Mode changed to Drilled and Cased |
2001-05-07 | Perforation Treatment Performed - Jet Perforation |
2001-05-07 | Well Log Performed |
2001-05-12 | Well Log Performed |
2001-08-15 | Well Began Production |
2001-08-15 | Well Fluid changed to Gas |
2001-08-15 | Well Mode changed to Flowing |
2017-01-01 | Well Fluid changed to Gas |
2017-01-01 | Well Mode changed to Suspended |
2018-03-29 | Well Fluid changed to Gas |
2018-03-29 | Well Mode changed to Pumping |
2020-03-01 | Well Fluid changed to Gas |
2020-03-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2001-03-13 | 430.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2001-05-07 | Perforation | 2389.00 | 2392.00 | 17 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2001 | 2768 | 0.0 | 0.0 | 0.0 |
2002 | 7957 | 0.0 | 0.0 | 0.0 |
2003 | 8514 | 0.0 | 0.0 | 0.0 |
2004 | 8404 | 0.0 | 0.0 | 0.0 |
2005 | 5864 | 0.0 | 0.0 | 0.0 |
2006 | 8635 | 0.0 | 0.0 | 0.0 |
2007 | 8525 | 0.0 | 0.0 | 0.0 |
2008 | 7893 | 0.0 | 0.0 | 0.0 |
2009 | 8095 | 0.0 | 0.0 | 0.0 |
2010 | 8254 | 0.0 | 0.0 | 0.0 |
2011 | 7727 | 0.0 | 0.0 | 0.0 |
2012 | 7473 | 0.0 | 0.0 | 0.0 |
2013 | 6759 | 0.0 | 0.0 | 0.0 |
2014 | 7465 | 0.0 | 0.0 | 0.0 |
2015 | 5603 | 0.0 | 0.0 | 0.0 |
2018 | 5315 | 0.0 | 0.0 | 0.0 |
For data sources see[6]