X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0766082313000

Well Details

Well ID: 0766082313000
Loading map...
Location: 00/13-23-076-08W6/0
Location Alias: 00/13-23-76-08 W6M
Location Alias 2: 00/13-23-076-08 W6/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 6
Range: 08
Section: 23
County/Municipality: Saddle Hills County
Well Name: TOURMALINE HZ VALHALLA 13-23-76-8
Operator Name: Tourmaline Oil Corp.
License Number: 0475643
License Date: 2015-06-02
License Status: Issued
Spud Date: 2015-07-07
Final Drill Date: 2015-07-17
Well Total Depth: 3138.00 m
Surface Hole Latitude: 55.593130
Surface Hole Longitude: -119.133032

For data sources see[1][2]

Well History

Date Event
2015-06-02 Obtained License
2015-07-08 Surface Casing Operation Performed
2015-07-09 Direction Drilling Operation Performed - Deviate
2015-07-11 Direction Drilling Operation Performed - Horizontal
2015-07-14 Intermediate Casing Operation Performed
2015-07-17 Finished Drilling
2015-07-17 Well Log Performed
2015-07-17 Well Mode changed to Drilled and Cased
2015-07-18 Well Log Performed
2015-07-19 Liner Casing Operation Performed
2015-07-20 Rig Released
2015-08-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-08-09 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-12 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-16 Perforation Treatment Performed - Jet Perforation
2015-09-16 Well Log Performed
2015-09-17 Perforation Treatment Performed - Cement Squeeze
2015-09-23 Well Log Performed
2015-10-01 Well Began Production
2015-10-01 Well Fluid changed to Crude Oil
2015-10-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-07-07 Beaver Drilling Ltd. 7 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-07-09 1387.90 Deviate (5 - 79 degrees)
2015-07-11 1920.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-08-09 Multi-Stage Fracture 3092.20 3092.30 0
2015-08-12 Multi-Stage Fracture 2730.50 2730.60 0
2015-08-12 Multi-Stage Fracture 2685.10 2685.20 0
2015-08-12 Multi-Stage Fracture 2641.40 2641.50 0
2015-08-12 Multi-Stage Fracture 2596.30 2596.40 0
2015-08-12 Multi-Stage Fracture 2552.70 2552.80 0
2015-08-12 Multi-Stage Fracture 2508.10 2508.20 0
2015-08-12 Multi-Stage Fracture 2478.50 2478.60 0
2015-08-12 Multi-Stage Fracture 2436.30 2436.40 0
2015-08-12 Multi-Stage Fracture 2393.10 2393.20 0
2015-08-12 Multi-Stage Fracture 2348.80 2348.90 0
2015-08-09 Acid Treatment 3092.20 3092.30 0
2015-08-12 Multi-Stage Fracture 2304.50 2304.60 0
2015-08-12 Multi-Stage Fracture 2260.00 2260.10 0
2015-08-12 Multi-Stage Fracture 2214.70 2214.80 0
2015-08-12 Multi-Stage Fracture 2172.30 2172.40 0
2015-08-12 Multi-Stage Fracture 2142.50 2142.60 0
2015-08-12 Multi-Stage Fracture 2114.40 2114.50 0
2015-08-12 Multi-Stage Fracture 2084.20 2084.30 0
2015-08-12 Multi-Stage Fracture 2054.60 2054.70 0
2015-09-16 Perforation 1345.00 1346.00 14
2015-09-17 Cement Squeeze 1345.00 1346.00 0
2015-08-12 Multi-Stage Fracture 3046.20 3046.30 0
2015-08-12 Multi-Stage Fracture 3000.80 3000.90 0
2015-08-12 Multi-Stage Fracture 2955.60 2955.70 0
2015-08-12 Multi-Stage Fracture 2910.40 2910.50 0
2015-08-12 Multi-Stage Fracture 2866.20 2866.30 0
2015-08-12 Multi-Stage Fracture 2820.70 2820.80 0
2015-08-12 Multi-Stage Fracture 2775.80 2775.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-08-09 2015-08-12 1,718 4,147 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 88.1215 N/A
Atlas CRC-LT (20/40) Canyon Crystalline silica. quartz 14808-60-7 100 4.9847 N/A
Phenolic Resin 9003-35-4 100 4.9847 N/A
Sand (20/40) Ottawa Canyon Aluminum Oxide 1344-28-1 100 5.5385 N/A
Crystalline silica. quartz 14808-60-7 100 5.5385 N/A
Iron Oxide 1309-37-1 100 5.5385 N/A
Titanium Oxide 13463-67-7 100 5.5386 N/A
Sand (50/140) Canyon Aluminum Oxide 1344-28-1 100 1.1077 N/A
Crystalline silica. quartz 14808-60-7 100 1.1077 N/A
Iron Oxide 1309-37-1 100 1.1077 N/A
Titanium Oxide 13463-67-7 100 1.1077 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0206 N/A
Water 7732-18-5 100 0.0206 N/A
CAN-1912 Clay Stabilizer (HT) Canyon Clay Control No hazardous ingredients Not Available 100 0.097 N/A
CAN-2410 Demulsifier Canyon Demulsifier Methyl Alcohol 67-56-1 100 0.0824 N/A
Water 7732-18-5 100 0.0824 N/A
CAN-2057 Friction Reducer Canyon Gelling Agent No hazardous ingredients Not Available 100 0.0473 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-08-12 2015-08-12 Surface Water - Runoff 4147

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 2099 0.0 0.0 0.0
2016 8582 0.0 0.0 0.0
2017 8237 0.0 0.0 0.0
2018 5629 0.0 0.0 0.0
2019 7861 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-07-20 No Incident Encountered 0.00 0.00
2015-09-02 No Incident Encountered 0.00 0.00
2015-09-25 No Incident Encountered 0.00 0.00

For data sources see[10]

References