If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0766073116030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.619397,"lon":-119.040568,"icon":""}]} |
Location: 03/16-31-076-07W6/0 | |
Location Alias: 03/16-31-76-07 W6M | |
Location Alias 2: 03/16-31-076-07 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 6 | |
Range: 07 | |
Section: 31 | |
County/Municipality: Saddle Hills County | |
Well Name: TOURMALINE 103HZ VALHALLA 16-31-76-7 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0480481 | |
License Date: 2016-09-27 | |
License Status: Amended | |
Spud Date: 2016-11-05 | |
Final Drill Date: 2016-11-29 | |
Well Total Depth: 3604.00 m | |
Surface Hole Latitude: 55.619397 | |
Surface Hole Longitude: -119.040568 |
Date | Event |
---|---|
2016-09-27 | Obtained License |
2016-11-06 | Surface Casing Operation Performed |
2016-11-22 | Direction Drilling Operation Performed - Deviate |
2016-11-23 | Direction Drilling Operation Performed - Horizontal |
2016-11-25 | Intermediate Casing Operation Performed |
2016-11-29 | Finished Drilling |
2016-11-29 | Well Log Performed |
2016-11-29 | Well Mode changed to Drilled and Cased |
2016-11-30 | Liner Casing Operation Performed |
2016-11-30 | Rig Released |
2017-01-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-01-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-01-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-02-16 | Well Began Production |
2017-02-16 | Well Fluid changed to Crude Oil |
2017-02-16 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2016-11-05 | Precision Drilling Corporation | 226 | N/A | Set Surface |
2016-11-25 | Precision Drilling Corporation | 226 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2016-11-22 | 1334.00 | Deviate (5 - 79 degrees) |
2016-11-23 | 1839.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-01-01 | Multi-Stage Fracture | 3595.00 | 3595.10 | 0 |
2017-01-02 | Multi-Stage Fracture | 3135.80 | 3135.90 | 0 |
2017-01-02 | Multi-Stage Fracture | 3088.70 | 3088.80 | 0 |
2017-01-02 | Multi-Stage Fracture | 3041.60 | 3041.70 | 0 |
2017-01-02 | Multi-Stage Fracture | 2983.20 | 2983.30 | 0 |
2017-01-02 | Multi-Stage Fracture | 2936.00 | 2936.10 | 0 |
2017-01-02 | Multi-Stage Fracture | 2888.90 | 2889.00 | 0 |
2017-01-02 | Multi-Stage Fracture | 2841.60 | 2841.70 | 0 |
2017-01-02 | Multi-Stage Fracture | 2783.20 | 2783.30 | 0 |
2017-01-02 | Multi-Stage Fracture | 2735.80 | 2735.90 | 0 |
2017-01-02 | Multi-Stage Fracture | 2688.80 | 2688.90 | 0 |
2017-01-01 | Multi-Stage Fracture | 3535.90 | 3536.00 | 0 |
2017-01-02 | Multi-Stage Fracture | 2641.50 | 2641.60 | 0 |
2017-01-02 | Multi-Stage Fracture | 2582.80 | 2582.90 | 0 |
2017-01-02 | Multi-Stage Fracture | 2535.90 | 2536.00 | 0 |
2017-01-02 | Multi-Stage Fracture | 2488.90 | 2489.00 | 0 |
2017-01-02 | Multi-Stage Fracture | 2441.50 | 2441.60 | 0 |
2017-01-02 | Multi-Stage Fracture | 2383.20 | 2383.30 | 0 |
2017-01-02 | Multi-Stage Fracture | 2336.10 | 2336.20 | 0 |
2017-01-02 | Multi-Stage Fracture | 2288.80 | 2288.90 | 0 |
2017-01-02 | Multi-Stage Fracture | 2242.00 | 2242.10 | 0 |
2017-01-03 | Multi-Stage Fracture | 2183.20 | 2183.30 | 0 |
2017-01-01 | Multi-Stage Fracture | 3488.60 | 3488.70 | 0 |
2017-01-03 | Multi-Stage Fracture | 2136.40 | 2136.50 | 0 |
2017-01-03 | Multi-Stage Fracture | 2089.40 | 2089.50 | 0 |
2017-01-03 | Multi-Stage Fracture | 2042.20 | 2042.30 | 0 |
2017-01-03 | Multi-Stage Fracture | 1984.10 | 1984.20 | 0 |
2017-01-03 | Multi-Stage Fracture | 1937.40 | 1937.50 | 0 |
2017-01-03 | Multi-Stage Fracture | 1890.20 | 1890.30 | 0 |
2017-01-01 | Multi-Stage Fracture | 3441.50 | 3441.60 | 0 |
2017-01-01 | Multi-Stage Fracture | 3382.80 | 3382.90 | 0 |
2017-01-01 | Multi-Stage Fracture | 3336.00 | 3336.10 | 0 |
2017-01-01 | Multi-Stage Fracture | 3288.90 | 3289.00 | 0 |
2017-01-01 | Multi-Stage Fracture | 3241.40 | 3241.50 | 0 |
2017-01-01 | Multi-Stage Fracture | 3183.00 | 3183.10 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-01-01 | 2017-01-03 | 1,682 | 7,732 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 90.0475 | N/A | |||
Prime Plus (40/70) | Canyon Technical Services | No specific ingredients | Not Available | 100 | 1.7786 | N/A | ||
Sand (40/70) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 7.3562 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 7.3562 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 7.3563 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 7.3563 | N/A | ||||
Sand (50/140) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 0.7966 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 0.7966 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 0.7966 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 0.7967 | N/A | ||||
CAN-1912 Clay Stabilizer (HT) | Canyon Technical Services | Clay Control | No hazardous ingredients | Not Available | 100 | 0.0991 | N/A | |
CAN-2412 Non-emulsifier | Canyon Technical Services | Demulsifier | 1-Hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0867 | N/A | |
Benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol (1:1) |
26836-07-7 | 100 | 0.0867 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0867 | N/A | ||||
Poly(oxyethelyne. oxypropylene) copolymer. liquids | 11/6/9003 | 100 | 0.0867 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0867 | N/A | ||||
CAN-2057 Friction Reducer | Canyon Technical Services | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0533 | N/A | |
CAN-1402 Scale Inhibitor | Canyon Technical Services | Scale Inhibitor | Methyl Alcohol | 67-56-1 | 100 | 0.0357 | N/A | |
Potassium Chloride | 7447-40-7 | 100 | 0.0357 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0357 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-02-02 | 2017-02-03 | Surface Water - Runoff | 5526 |
2017-02-01 | 2017-02-01 | Surface Water - Runoff | 2207 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 6784 | 0.0 | 0.0 | 0.0 |
2018 | 8581 | 0.0 | 0.0 | 0.0 |
2019 | 8439 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-11-29 | No Incident Encountered | 0.00 | 0.00 |
2017-02-16 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]