If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0766073105020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.615561,"lon":-119.059517,"icon":""}]} |
Location: 02/05-31-076-07W6/0 | |
Location Alias: 02/05-31-76-07 W6M | |
Location Alias 2: 02/05-31-076-07 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 6 | |
Range: 07 | |
Section: 31 | |
County/Municipality: Saddle Hills County | |
Well Name: TOURMALINE HZ 102 VALHALLA 5-31-76-7 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0474626 | |
License Date: 2015-02-18 | |
License Status: Issued | |
Spud Date: 2015-05-22 | |
Final Drill Date: 2015-06-02 | |
Well Total Depth: 3600.00 m | |
Surface Hole Latitude: 55.615561 | |
Surface Hole Longitude: -119.059517 |
Date | Event |
---|---|
2015-02-18 | Obtained License |
2015-05-22 | Surface Casing Operation Performed |
2015-05-25 | Direction Drilling Operation Performed - Deviate |
2015-05-27 | Intermediate Casing Operation Performed |
2015-05-28 | Direction Drilling Operation Performed - Horizontal |
2015-06-02 | Finished Drilling |
2015-06-02 | Well Log Performed |
2015-06-02 | Well Mode changed to Drilled and Cased |
2015-06-03 | Production Casing Operation Performed |
2015-06-04 | Rig Released |
2015-06-04 | Well Log Performed |
2015-06-26 | Well Log Performed |
2015-07-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2015-07-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-07-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-07-07 | Well Began Production |
2015-07-07 | Well Fluid changed to Crude Oil |
2015-07-07 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2015-05-22 | Beaver Drilling Ltd. | 7 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2015-05-25 | 1407.50 | Deviate (5 - 79 degrees) |
2015-05-28 | 1882.40 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-07-02 | Multi-Stage Fracture | 3569.40 | 3569.50 | 0 |
2015-07-03 | Multi-Stage Fracture | 2981.10 | 2981.20 | 0 |
2015-07-03 | Multi-Stage Fracture | 2908.60 | 2908.70 | 0 |
2015-07-03 | Multi-Stage Fracture | 2835.00 | 2835.10 | 0 |
2015-07-03 | Multi-Stage Fracture | 2761.20 | 2761.30 | 0 |
2015-07-03 | Multi-Stage Fracture | 2687.40 | 2687.50 | 0 |
2015-07-03 | Multi-Stage Fracture | 2628.30 | 2628.40 | 0 |
2015-07-03 | Multi-Stage Fracture | 2569.00 | 2569.10 | 0 |
2015-07-03 | Multi-Stage Fracture | 2510.60 | 2510.70 | 0 |
2015-07-03 | Multi-Stage Fracture | 2451.90 | 2452.00 | 0 |
2015-07-03 | Multi-Stage Fracture | 2393.00 | 2393.10 | 0 |
2015-07-02 | Acid Treatment | 3569.40 | 3569.50 | 0 |
2015-07-03 | Multi-Stage Fracture | 2334.10 | 2334.20 | 0 |
2015-07-03 | Multi-Stage Fracture | 2274.80 | 2274.90 | 0 |
2015-07-03 | Multi-Stage Fracture | 2215.70 | 2215.80 | 0 |
2015-07-03 | Multi-Stage Fracture | 2156.20 | 2156.30 | 0 |
2015-07-03 | Multi-Stage Fracture | 2096.60 | 2096.70 | 0 |
2015-07-03 | Multi-Stage Fracture | 2037.60 | 2037.70 | 0 |
2015-07-03 | Multi-Stage Fracture | 1978.60 | 1978.70 | 0 |
2015-07-03 | Multi-Stage Fracture | 1918.80 | 1918.90 | 0 |
2015-07-03 | Multi-Stage Fracture | 3494.50 | 3494.60 | 0 |
2015-07-03 | Multi-Stage Fracture | 3421.40 | 3421.50 | 0 |
2015-07-03 | Multi-Stage Fracture | 3348.60 | 3348.70 | 0 |
2015-07-03 | Multi-Stage Fracture | 3275.10 | 3275.20 | 0 |
2015-07-03 | Multi-Stage Fracture | 3201.30 | 3201.40 | 0 |
2015-07-03 | Multi-Stage Fracture | 3128.50 | 3128.60 | 0 |
2015-07-03 | Multi-Stage Fracture | 3055.20 | 3055.30 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-07-02 | 2015-07-03 | 1,722 | 4,563 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 89.0609 | N/A | |||
Sand (50/140) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 1.0271 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 1.0271 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 1.0271 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 1.0271 | N/A | ||||
SiberProp (20/40) | Canyon | Crystalline silica. quartz | 14808-60-7 | 100 | 9.6593 | N/A | ||
Phenol formaldehyde resin | 9003-35-4 | 100 | 9.6593 | N/A | ||||
Tolcide PS75LT | Canyon | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0151 | N/A | |
Water | 7732-18-5 | 100 | 0.0151 | N/A | ||||
CAN-1912 Clay Stabilizer (HT) | Canyon | Clay Control | No hazardous ingredients | Not Available | 100 | 0.0989 | N/A | |
CAN-2410 Demulsifier | Canyon | Demulsifier | Methyl Alcohol | 67-56-1 | 100 | 0.0841 | N/A | |
Water | 7732-18-5 | 100 | 0.0841 | N/A | ||||
CAN-2057 Friction Reducer | Canyon | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0542 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2015-07-01 | 2015-07-01 | Surface Water - Runoff | 4563 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 3549 | 0.0 | 0.0 | 0.0 |
2016 | 6515 | 0.0 | 0.0 | 0.0 |
2017 | 8376 | 0.0 | 0.0 | 0.0 |
2018 | 8659 | 0.0 | 0.0 | 0.0 |
2019 | 7445 | 0.0 | 0.0 | 0.0 |
2020 | 1940 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-06-04 | No Incident Encountered | 0.00 | 0.00 |
2015-07-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]