If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0766072901020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.627625,"lon":-119.033271,"icon":""}]} |
Location: 02/01-29-076-07W6/0 | |
Location Alias: 02/01-29-76-07 W6M | |
Location Alias 2: 02/01-29-076-07 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 6 | |
Range: 07 | |
Section: 29 | |
County/Municipality: Saddle Hills County | |
Well Name: TOURMALINE HZ 102 VALHALLA 1-29-76-7 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0485956 | |
License Date: 2017-10-23 | |
License Status: Issued | |
Spud Date: 2017-11-24 | |
Final Drill Date: 2018-01-26 | |
Well Total Depth: 3803.00 m | |
Surface Hole Latitude: 55.627625 | |
Surface Hole Longitude: -119.033271 |
Date | Event |
---|---|
2017-10-23 | Obtained License |
2017-11-24 | Surface Casing Operation Performed |
2018-01-17 | Direction Drilling Operation Performed - Deviate |
2018-01-18 | Direction Drilling Operation Performed - Horizontal |
2018-01-20 | Intermediate Casing Operation Performed |
2018-01-26 | Finished Drilling |
2018-01-26 | Well Log Performed |
2018-01-26 | Well Mode changed to Drilled and Cased |
2018-01-27 | Liner Casing Operation Performed |
2018-01-28 | Rig Released |
2018-02-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-08 | Well Began Production |
2018-03-08 | Well Fluid changed to Crude Oil |
2018-03-08 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-01-20 | Precision Drilling Corporation | 226 | N/A | Resumption |
2017-11-24 | Precision Drilling Corporation | 226 | N/A | Set Surface |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-01-17 | 1482.80 | Deviate (5 - 79 degrees) |
2018-01-18 | 1931.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-02-20 | Multi-Stage Fracture | 3777.70 | 3777.80 | 0 |
2018-02-20 | Multi-Stage Fracture | 3435.30 | 3435.40 | 0 |
2018-02-20 | Multi-Stage Fracture | 3391.00 | 3391.10 | 0 |
2018-02-20 | Multi-Stage Fracture | 3346.40 | 3346.50 | 0 |
2018-02-20 | Multi-Stage Fracture | 3301.80 | 3301.90 | 0 |
2018-02-20 | Multi-Stage Fracture | 3257.10 | 3257.20 | 0 |
2018-02-20 | Multi-Stage Fracture | 3212.50 | 3212.60 | 0 |
2018-02-20 | Multi-Stage Fracture | 3167.90 | 3168.00 | 0 |
2018-02-20 | Multi-Stage Fracture | 3123.70 | 3123.80 | 0 |
2018-02-20 | Multi-Stage Fracture | 3079.10 | 3079.20 | 0 |
2018-02-20 | Multi-Stage Fracture | 3035.20 | 3035.30 | 0 |
2018-02-20 | Multi-Stage Fracture | 3747.50 | 3747.60 | 0 |
2018-02-20 | Multi-Stage Fracture | 2991.70 | 2991.80 | 0 |
2018-02-20 | Multi-Stage Fracture | 2947.80 | 2947.90 | 0 |
2018-02-20 | Multi-Stage Fracture | 2903.60 | 2903.70 | 0 |
2018-02-20 | Multi-Stage Fracture | 2859.10 | 2859.20 | 0 |
2018-02-20 | Multi-Stage Fracture | 2814.50 | 2814.60 | 0 |
2018-02-20 | Multi-Stage Fracture | 2770.00 | 2770.10 | 0 |
2018-02-20 | Multi-Stage Fracture | 2725.40 | 2725.50 | 0 |
2018-02-20 | Multi-Stage Fracture | 2680.90 | 2681.00 | 0 |
2018-02-20 | Multi-Stage Fracture | 2636.40 | 2636.50 | 0 |
2018-02-20 | Multi-Stage Fracture | 2591.80 | 2591.90 | 0 |
2018-02-20 | Multi-Stage Fracture | 3717.30 | 3717.40 | 0 |
2018-02-20 | Multi-Stage Fracture | 2547.50 | 2547.60 | 0 |
2018-02-20 | Multi-Stage Fracture | 2503.00 | 2503.10 | 0 |
2018-02-20 | Multi-Stage Fracture | 2458.50 | 2458.60 | 0 |
2018-02-20 | Multi-Stage Fracture | 2414.00 | 2414.10 | 0 |
2018-02-20 | Multi-Stage Fracture | 2369.70 | 2369.80 | 0 |
2018-02-20 | Multi-Stage Fracture | 2325.10 | 2325.20 | 0 |
2018-02-20 | Multi-Stage Fracture | 2280.50 | 2280.60 | 0 |
2018-02-20 | Multi-Stage Fracture | 2236.00 | 2236.10 | 0 |
2018-02-20 | Multi-Stage Fracture | 2191.40 | 2191.50 | 0 |
2018-02-20 | Multi-Stage Fracture | 3687.20 | 3687.30 | 0 |
2018-02-20 | Multi-Stage Fracture | 3657.30 | 3657.40 | 0 |
2018-02-20 | Multi-Stage Fracture | 3613.20 | 3613.30 | 0 |
2018-02-20 | Multi-Stage Fracture | 3568.70 | 3568.80 | 0 |
2018-02-20 | Multi-Stage Fracture | 3524.40 | 3524.50 | 0 |
2018-02-20 | Multi-Stage Fracture | 3479.80 | 3479.90 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-02-20 | 2018-02-20 | 1,806 | 9,200 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 85.4593 | N/A | |||
Prime Plus 40/70 | Trican | hexamethylenetetramine | 100-97-0 | 100 | 4.3724 | N/A | ||
silica crystalline | 14808-60-7 | 100 | 4.3724 | N/A | ||||
Sand - Tier 2 (30/50) | Trican | silica crystalline | 14808-60-7 | 100 | 0.3782 | N/A | ||
Sand - Tier 2 (40/70) | Trican | silica crystalline | 14808-60-7 | 100 | 9.8849 | N/A | ||
AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0101 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0101 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0101 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0101 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0101 | N/A | ||||
CC-8 | Trican | Clay Control | choline chloride | 67-48-1 | 100 | 0.094 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.094 | N/A | ||||
FR-23 | Trican | Friction Reducer | acrylamide modified polymer | Trade Secret | 100 | 0.0457 | N/A | |
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0457 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0457 | N/A | ||||
SI-18 | Trican | Scale Inhibitor | non-hazardous ingredients | Not Available | 100 | 0.0399 | N/A | |
S-17X | Trican | Surfactant | 1-hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0833 | N/A | |
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol | 26836-07-7 | 100 | 0.0833 | N/A | ||||
methanol | 67-56-1 | 100 | 0.0833 | N/A | ||||
methyloxirane polymer with oxirane | 11/6/9003 | 100 | 0.0833 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0833 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-02-20 | 2018-02-22 | Surface Water - Runoff | 9200 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 6581 | 0.0 | 0.0 | 0.0 |
2019 | 7802 | 0.0 | 0.0 | 0.0 |
2020 | 1259 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-01-26 | No Incident Encountered | 0.00 | 0.00 |
2018-02-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]