If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0766072801020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.61933,"lon":-119.040642,"icon":""}]} |
Location: 02/01-28-076-07W6/0 | |
Location Alias: 02/01-28-76-07 W6M | |
Location Alias 2: 02/01-28-076-07 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 6 | |
Range: 07 | |
Section: 28 | |
County/Municipality: Saddle Hills County | |
Well Name: TOURMALINE 102 VALHALLA 1-28-76-7 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0480479 | |
License Date: 2016-09-27 | |
License Status: Amended | |
Spud Date: 2016-11-04 | |
Final Drill Date: 2016-12-11 | |
Well Total Depth: 3587.00 m | |
Surface Hole Latitude: 55.619330 | |
Surface Hole Longitude: -119.040642 |
Date | Event |
---|---|
2016-09-27 | Obtained License |
2016-11-05 | Surface Casing Operation Performed |
2016-12-02 | Direction Drilling Operation Performed - Deviate |
2016-12-04 | Direction Drilling Operation Performed - Horizontal |
2016-12-05 | Intermediate Casing Operation Performed |
2016-12-11 | Finished Drilling |
2016-12-11 | Well Log Performed |
2016-12-11 | Well Mode changed to Drilled and Cased |
2016-12-13 | Liner Casing Operation Performed |
2016-12-13 | Rig Released |
2016-12-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-12-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-12-31 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-02-15 | Well Began Production |
2017-02-15 | Well Fluid changed to Crude Oil |
2017-02-15 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2016-11-04 | Precision Drilling Corporation | 226 | N/A | Set Surface |
2016-12-06 | Precision Drilling Corporation | 226 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2016-12-02 | 1174.80 | Deviate (5 - 79 degrees) |
2016-12-04 | 1905.40 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2016-12-29 | Multi-Stage Fracture | 3577.00 | 3577.10 | 0 |
2016-12-30 | Multi-Stage Fracture | 3130.30 | 3130.40 | 0 |
2016-12-30 | Multi-Stage Fracture | 3083.50 | 3083.60 | 0 |
2016-12-30 | Multi-Stage Fracture | 3036.20 | 3036.30 | 0 |
2016-12-30 | Multi-Stage Fracture | 2989.40 | 2989.50 | 0 |
2016-12-30 | Multi-Stage Fracture | 2942.30 | 2942.40 | 0 |
2016-12-30 | Multi-Stage Fracture | 2895.20 | 2895.30 | 0 |
2016-12-30 | Multi-Stage Fracture | 2848.20 | 2848.30 | 0 |
2016-12-30 | Multi-Stage Fracture | 2801.50 | 2801.60 | 0 |
2016-12-30 | Multi-Stage Fracture | 2754.70 | 2754.80 | 0 |
2016-12-31 | Multi-Stage Fracture | 2707.70 | 2707.80 | 0 |
2016-12-29 | Multi-Stage Fracture | 3506.20 | 3506.30 | 0 |
2016-12-31 | Multi-Stage Fracture | 2661.20 | 2661.30 | 0 |
2016-12-31 | Multi-Stage Fracture | 2613.80 | 2613.90 | 0 |
2016-12-31 | Multi-Stage Fracture | 2566.60 | 2566.70 | 0 |
2016-12-31 | Multi-Stage Fracture | 2519.60 | 2519.70 | 0 |
2016-12-31 | Multi-Stage Fracture | 2472.60 | 2472.70 | 0 |
2016-12-31 | Multi-Stage Fracture | 2425.60 | 2425.70 | 0 |
2016-12-31 | Multi-Stage Fracture | 2378.70 | 2378.80 | 0 |
2016-12-31 | Multi-Stage Fracture | 2331.60 | 2331.70 | 0 |
2016-12-31 | Multi-Stage Fracture | 2284.70 | 2284.80 | 0 |
2016-12-31 | Multi-Stage Fracture | 2237.90 | 2238.00 | 0 |
2016-12-29 | Multi-Stage Fracture | 3459.50 | 3459.60 | 0 |
2016-12-31 | Multi-Stage Fracture | 2191.10 | 2191.20 | 0 |
2016-12-31 | Multi-Stage Fracture | 2144.00 | 2144.10 | 0 |
2016-12-31 | Multi-Stage Fracture | 2097.20 | 2097.30 | 0 |
2016-12-31 | Multi-Stage Fracture | 2049.90 | 2050.00 | 0 |
2016-12-31 | Multi-Stage Fracture | 2002.60 | 2002.70 | 0 |
2016-12-31 | Multi-Stage Fracture | 1955.70 | 1955.80 | 0 |
2016-12-29 | Multi-Stage Fracture | 3413.10 | 3413.20 | 0 |
2016-12-30 | Multi-Stage Fracture | 3365.90 | 3366.00 | 0 |
2016-12-30 | Multi-Stage Fracture | 3319.10 | 3319.20 | 0 |
2016-12-30 | Multi-Stage Fracture | 3272.00 | 3272.10 | 0 |
2016-12-30 | Multi-Stage Fracture | 3224.90 | 3225.00 | 0 |
2016-12-30 | Multi-Stage Fracture | 3177.60 | 3177.70 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-12-29 | 2016-12-31 | 1,679 | 7,568 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 88.793 | N/A | |||
Prime Plus (40/70) | Canyon Technical Services | No specific ingredients | Not Available | 100 | 1.9141 | N/A | ||
Sand (40/70) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 8.7665 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 8.7665 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 8.7665 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 8.7665 | N/A | ||||
Sand (50/140) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 0.7948 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 0.7948 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 0.7948 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 0.7948 | N/A | ||||
CAN-1912 Clay Stabilizer (HT) | Canyon Technical Services | Clay Control | No hazardous ingredients | Not Available | 100 | 0.0982 | N/A | |
CAN-2412 Non-emulsifier | Canyon Technical Services | Demulsifier | 1-Hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0859 | N/A | |
Benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol (1:1) |
26836-07-7 | 100 | 0.0859 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0859 | N/A | ||||
Poly(oxyethelyne. oxypropylene) copolymer. liquids | 11/6/9003 | 100 | 0.0859 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0859 | N/A | ||||
CAN-2057 Friction Reducer | Canyon Technical Services | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0578 | N/A | |
CAN-1402 Scale Inhibitor | Canyon Technical Services | Scale Inhibitor | Methyl Alcohol | 67-56-1 | 100 | 0.036 | N/A | |
Potassium Chloride | 7447-40-7 | 100 | 0.036 | N/A | ||||
Water | 7732-18-5 | 100 | 0.036 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2016-12-29 | 2016-12-31 | Surface Water - Runoff | 7568 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 6380 | 0.0 | 0.0 | 0.0 |
2018 | 7843 | 0.0 | 0.0 | 0.0 |
2019 | 8553 | 0.0 | 0.0 | 0.0 |
2020 | 2179 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-12-11 | No Incident Encountered | 0.00 | 0.00 |
2017-03-02 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]