X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0766072013000

Well Details

Well ID: 0766072013000
Loading map...
Location: 00/13-20-076-07W6/0
Location Alias: 00/13-20-76-07 W6M
Location Alias 2: 00/13-20-076-07 W6/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 6
Range: 07
Section: 20
County/Municipality: Saddle Hills County
Well Name: TOURMALINE HZ VALHALLA 13-20-76-7
Operator Name: Tourmaline Oil Corp.
License Number: 0472484
License Date: 2014-12-02
License Status: Suspension
Spud Date: 2015-07-07
Final Drill Date: 2015-08-27
Well Total Depth: 3632.00 m
Surface Hole Latitude: 55.591610
Surface Hole Longitude: -119.033440

For data sources see[1][2]

Well History

Date Event
2014-12-02 Obtained License
2015-07-08 Surface Casing Operation Performed
2015-08-17 Direction Drilling Operation Performed - Deviate
2015-08-20 Direction Drilling Operation Performed - Horizontal
2015-08-20 Well Log Performed
2015-08-21 Well Log Performed
2015-08-22 Intermediate Casing Operation Performed
2015-08-27 Finished Drilling
2015-08-27 Well Log Performed
2015-08-27 Well Mode changed to Drilled and Cased
2015-08-28 Liner Casing Operation Performed
2015-08-29 Rig Released
2015-09-20 Well Log Performed
2015-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-09-26 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-28 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-11 Well Began Production
2015-10-11 Well Fluid changed to Crude Oil
2015-10-11 Well Mode changed to Flowing
2016-07-18 Well Fluid changed to Crude Oil
2016-07-18 Well Mode changed to Pumping
2019-01-01 Well Fluid changed to Crude Oil
2019-01-01 Well Mode changed to Suspended
2020-02-01 Well Fluid changed to Crude Oil
2020-02-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-07-07 Precision Drilling Corporation 226 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-08-17 1351.50 Deviate (5 - 79 degrees)
2015-08-20 1811.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-09-26 Multi-Stage Fracture 3600.80 3600.90 0
2015-09-28 Multi-Stage Fracture 3284.50 3284.60 0
2015-09-28 Multi-Stage Fracture 3239.50 3239.60 0
2015-09-28 Multi-Stage Fracture 3194.30 3194.40 0
2015-09-28 Multi-Stage Fracture 3149.00 3149.10 0
2015-09-28 Multi-Stage Fracture 3104.10 3104.20 0
2015-09-28 Multi-Stage Fracture 3058.80 3058.90 0
2015-09-28 Multi-Stage Fracture 3014.40 3014.50 0
2015-09-28 Multi-Stage Fracture 2954.70 2954.80 0
2015-09-28 Multi-Stage Fracture 2482.70 2482.80 0
2015-09-28 Multi-Stage Fracture 2423.30 2423.40 0
2015-09-26 Acid Treatment 3600.80 3600.90 0
2015-09-28 Multi-Stage Fracture 2363.90 2364.00 0
2015-09-28 Multi-Stage Fracture 2304.90 2305.00 0
2015-09-28 Multi-Stage Fracture 2246.00 2246.10 0
2015-09-28 Multi-Stage Fracture 2187.70 2187.80 0
2015-09-28 Multi-Stage Fracture 2129.00 2129.10 0
2015-09-28 Multi-Stage Fracture 2069.30 2069.40 0
2015-09-28 Multi-Stage Fracture 2009.40 2009.50 0
2015-09-28 Multi-Stage Fracture 1950.40 1950.50 0
2015-09-28 Multi-Stage Fracture 3568.30 3568.40 0
2015-09-28 Multi-Stage Fracture 3537.80 3537.90 0
2015-09-28 Multi-Stage Fracture 3507.00 3507.10 0
2015-09-28 Multi-Stage Fracture 3464.00 3464.10 0
2015-09-28 Multi-Stage Fracture 3419.40 3419.50 0
2015-09-28 Multi-Stage Fracture 3374.40 3374.50 0
2015-09-28 Multi-Stage Fracture 3329.10 3329.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-09-26 2015-09-28 1,664 4,109 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 88.7168 N/A
Atlas CRC-LT (20/40) Canyon Crystalline silica. quartz 14808-60-7 100 4.9221 N/A
Phenolic Resin 9003-35-4 100 4.9221 N/A
Sand (20/40) Ottawa Canyon Aluminum Oxide 1344-28-1 100 5.4682 N/A
Crystalline silica. quartz 14808-60-7 100 5.4682 N/A
Iron Oxide 1309-37-1 100 5.4682 N/A
Titanium Oxide 13463-67-7 100 5.4682 N/A
Sand (50/140) Canyon Aluminum Oxide 1344-28-1 100 1.0935 N/A
Crystalline silica. quartz 14808-60-7 100 1.0935 N/A
Iron Oxide 1309-37-1 100 1.0935 N/A
Titanium Oxide 13463-67-7 100 1.0935 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0069 N/A
Water 7732-18-5 100 0.0069 N/A
CAN-1912 Clay Stabilizer (HT) Canyon Clay Control No hazardous ingredients Not Available 100 0.0998 N/A
CAN-2410 Demulsifier Canyon Demulsifier Methyl Alcohol 67-56-1 100 0.0848 N/A
Water 7732-18-5 100 0.0848 N/A
CAN-2057 Friction Reducer Canyon Gelling Agent No hazardous ingredients Not Available 100 0.0493 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-09-28 2015-09-28 Surface Water - Runoff 4110

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 70 0.0 0.0 0.0
2016 5813 0.0 0.0 0.0
2017 3726 0.0 0.0 0.0
2020 772 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-08-27 No Incident Encountered 0.00 0.00
2015-11-07 No Incident Encountered 0.00 0.00

For data sources see[10]

References