X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0766070808002

Well Details

Well ID: 0766070808002
Loading map...
Location: 00/08-08-076-07W6/2
Location Alias: 00/08-08-76-07 W6M
Location Alias 2: 00/08-08-076-07 W6/02
Country: Canada
Province: Alberta
Township: 076
Meridian: 6
Range: 07
Section: 08
County/Municipality: Saddle Hills County
Well Name: CNRL VALHALLA 8-8-76-7
Operator Name: Canadian Natural Resources Limited
License Number: 0273695
License Date: 2002-09-11
License Status: Suspension
Spud Date: 2002-09-27
Final Drill Date: 2002-11-07
Well Total Depth: 3640.00 m
Surface Hole Latitude: 55.568405
Surface Hole Longitude: -119.039812

For data sources see[1][2]

Well History

Date Event
2002-09-11 Obtained License
2002-09-27 Well Log Performed
2002-10-01 Surface Casing Operation Performed
2002-10-18 Direction Drilling Operation Performed - Deviate
2002-10-24 Well Log Performed
2002-11-07 Finished Drilling
2002-11-07 Well Mode changed to Drilled and Cased
2002-11-08 Well Log Performed
2002-11-11 Production Casing Operation Performed
2002-11-12 Well Log Performed
2002-11-13 Rig Released
2002-12-01 Perforation Treatment Performed - Jet Perforation
2002-12-01 Well Log Performed
2002-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-12-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-12-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-12-11 Plug Back Performed
2002-12-11 Well Log Performed
2002-12-12 Well Log Performed
2002-12-13 Perforation Treatment Performed - Jet Perforation
2002-12-16 Perforation Treatment Performed - Fractured
2003-02-05 Well Began Production
2003-02-05 Well Fluid changed to Gas
2003-02-05 Well Mode changed to Flowing
2003-11-10 Perforation Treatment Performed - Casing Patch (Over Perfs)
2003-11-10 Well Log Performed
2003-11-12 Perforation Treatment Performed - Jet Perforation
2003-11-12 Well Log Performed
2003-11-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-11-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-11-20 Plug Back Performed
2003-11-20 Well Log Performed
2003-11-21 Perforation Treatment Performed - Jet Perforation
2003-11-21 Well Log Performed
2003-11-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-11-24 Plug Back Performed
2003-11-24 Well Log Performed
2003-11-25 Perforation Treatment Performed - Jet Perforation
2003-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-11-27 Plug Back Performed
2003-11-27 Well Fluid changed to Gas
2003-11-27 Well Log Performed
2003-11-27 Well Mode changed to Abandoned Zone
2003-11-28 Perforation Treatment Performed - Jet Perforation
2003-11-28 Well Log Performed
2003-11-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-07-29 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-10-18 2434.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-12-01 Perforation 3355.00 3357.00 20
2002-12-16 Fracture 2079.00 2084.00 0
2003-11-10 Casing Patch 2079.00 2084.00 0
2003-11-12 Perforation 2509.00 2511.00 20
2003-11-14 Acid Treatment 2509.00 2511.00 0
2003-11-20 Packing Device Capped w/Cement 2492.00 2500.00 0
2003-11-21 Perforation 2452.50 2454.50 20
2003-11-21 Perforation 2447.50 2449.50 20
2003-11-24 Packing Device Capped w/Cement 2432.00 2440.00 0
2003-11-25 Perforation 2074.00 2076.00 20
2003-11-26 Acid Treatment 2074.00 2076.00 0
2002-12-01 Perforation 3320.00 3325.50 20
2003-11-27 Packing Device Capped w/Cement 2056.00 2064.00 0
2003-11-28 Perforation 1703.50 1705.50 20
2003-11-29 Acid Treatment 1703.50 1705.50 0
2002-12-04 Acid Treatment 3320.00 3357.00 0
2002-12-05 Acid Treatment 3320.00 3357.00 0
2002-12-06 Acid Treatment 3320.00 3357.00 0
2002-12-09 Acid Treatment 3320.00 3357.00 0
2002-12-11 Packing Device Capped w/Cement 3304.00 3312.00 0
2002-12-13 Perforation 2083.00 2084.00 20
2002-12-13 Perforation 2079.00 2081.00 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 372 0.0 0.0 0.0

For data sources see[6]

References