X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0766061805000

Well Details

Well ID: 0766061805000
Loading map...
Location: 00/05-18-076-06W6/0
Location Alias: 00/05-18-76-06 W6M
Location Alias 2: 00/05-18-076-06 W6/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 6
Range: 06
Section: 18
County/Municipality: Saddle Hills County
Well Name: SEC HZ VALHALLA 5-18-76-6
Operator Name: Canadian Natural Resources Limited
License Number: 0447858
License Date: 2012-08-20
License Status: Issued
Spud Date: 2012-08-30
Final Drill Date: 2012-09-13
Well Total Depth: 3045.00 m
Surface Hole Latitude: 55.584008
Surface Hole Longitude: -118.906596

For data sources see[1][2]

Well History

Date Event
2012-08-20 Obtained License
2012-08-31 Surface Casing Operation Performed
2012-09-03 Direction Drilling Operation Performed - Deviate
2012-09-05 Direction Drilling Operation Performed - Horizontal
2012-09-13 Finished Drilling
2012-09-13 Well Mode changed to Drilled and Cased
2012-09-14 Well Log Performed
2012-09-16 Production Casing Operation Performed
2012-09-17 Rig Released
2012-10-06 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-07 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-08 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-21 Well Began Production
2013-02-21 Well Fluid changed to Crude Oil
2013-02-21 Well Mode changed to Pumping
2016-07-31 Well Fluid changed to Crude Oil
2016-07-31 Well Mode changed to Suspended
2016-12-19 Well Fluid changed to Crude Oil
2016-12-19 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-08-30 Horizon Drilling Inc. 29 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-09-03 1442.90 Deviate (5 - 79 degrees)
2012-09-05 1809.34 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-10-06 Multi-Stage Fracture 2991.30 2991.40 0
2012-10-07 Multi-Stage Fracture 2415.30 2415.40 0
2012-10-07 Multi-Stage Fracture 2329.50 2329.60 0
2012-10-07 Multi-Stage Fracture 2246.30 2246.40 0
2012-10-07 Multi-Stage Fracture 2177.70 2177.80 0
2012-10-07 Multi-Stage Fracture 2121.90 2122.00 0
2012-10-07 Multi-Stage Fracture 2052.30 2052.40 0
2012-10-07 Multi-Stage Fracture 1956.40 1956.50 0
2012-10-08 Multi-Stage Fracture 1884.20 1884.30 0
2012-10-06 Multi-Stage Fracture 2935.40 2935.50 0
2012-10-06 Multi-Stage Fracture 2842.90 2843.00 0
2012-10-06 Multi-Stage Fracture 2787.30 2787.40 0
2012-10-06 Multi-Stage Fracture 2730.70 2730.80 0
2012-10-07 Multi-Stage Fracture 2622.20 2622.30 0
2012-10-07 Multi-Stage Fracture 2540.70 2540.80 0
2012-10-07 Multi-Stage Fracture 2510.30 2510.40 0
2012-10-07 Multi-Stage Fracture 2449.00 2449.10 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 6607 0.0 0.0 0.0
2014 7729 0.0 0.0 0.0
2015 8615 0.0 0.0 0.0
2016 768 0.0 0.0 0.0
2017 7483 0.0 0.0 0.0
2018 6354 0.0 0.0 0.0
2019 6646 0.0 0.0 0.0
2020 1094 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-17 No Incident Encountered 0.00 0.00
2012-10-18 No Incident Encountered 0.00 0.00

For data sources see[8]

References