X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0766020104000

Well Details

Well ID: 0766020104000
Loading map...
Location: 00/04-01-076-02W6/0
Location Alias: 00/04-01-76-02 W6M
Location Alias 2: 00/04-01-076-02 W6/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 6
Range: 02
Section: 01
County/Municipality: Birch Hills County
Well Name: HUNT ET AL PEORIA 4-1-76-2
Operator Name: Harvest Operations Corp.
License Number: 0178634
License Date: 1995-06-19
License Status: Abandoned
Spud Date: 1995-06-26
Final Drill Date: 1995-07-10
Well Total Depth: 1760.00 m
Surface Hole Latitude: 55.559135
Surface Hole Longitude: -118.180378

For data sources see[1][2]

Well History

Date Event
1995-06-19 Obtained License
1995-06-27 Direction Drilling Operation Performed - Deviate
1995-06-27 Surface Casing Operation Performed
1995-07-10 Finished Drilling
1995-07-11 Well Log Performed
1995-07-12 Well Log Performed
1995-07-13 Production Casing Operation Performed
1995-07-13 Rig Released
1995-07-13 Well Mode changed to Drilled and Cased
1995-07-20 Perforation Treatment Performed - Jet Perforation
1995-07-27 Well Log Performed
1995-08-30 Perforation Treatment Performed - Jet Perforation
1995-08-30 Well Log Performed
1995-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-09-01 Perforation Treatment Performed - Bridge Plug No Cement Required
1995-09-01 Perforation Treatment Performed - Cement Squeeze
1995-09-01 Plug Back Performed
1995-09-09 Well Log Performed
1995-09-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-09-12 Perforation Treatment Performed - Cement Squeeze
1995-09-12 Perforation Treatment Performed - Jet Perforation
1995-09-12 Plug Back Performed
1995-09-12 Well Log Performed
1996-08-28 Perforation Treatment Performed - Bridge Plug No Cement Required
2005-06-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-06-28 Plug Back Performed
2005-06-28 Well Log Performed
2005-06-28 Well Mode changed to Abandoned Zone
2005-06-30 Well Log Performed
2005-07-04 Perforation Treatment Performed - Cement Plug
2005-07-04 Perforation Treatment Performed - Jet Perforation
2005-07-04 Perforation Treatment Performed - Remedial Casing
2005-07-04 Well Log Performed
2005-08-17 Perforation Treatment Performed - Jet Perforation
2005-08-19 Perforation Treatment Performed - Cement Plug
2005-08-19 Perforation Treatment Performed - Remedial Casing
2005-08-24 Well Abandoned
2005-08-24 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-06-27 240.60 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-07-20 Perforation 1712.80 1715.30 20
2005-06-28 Packing Device Capped w/Cement 1692.00 1700.00 0
2005-07-04 Perforation 302.00 303.00 14
2005-07-04 Remedial Casing Cementing 302.00 303.00 0
2005-07-04 Cement Plug 257.00 302.00 0
2005-08-17 Perforation 248.00 249.00 14
2005-08-19 Remedial Casing Cementing 248.00 249.00 0
2005-08-19 Cement Plug 145.00 248.00 0
1995-08-30 Perforation 1722.00 1723.00 13
1995-08-31 Acid Treatment 1712.80 1723.00 0
1995-09-01 Cement Squeeze 1722.00 1723.00 0
1995-09-01 Bridge Plug, No Cement 1719.60 1720.00 0
1995-09-12 Perforation 1662.00 1662.30 24
1995-09-12 Acid Treatment 1662.00 1662.30 0
1995-09-12 Cement Squeeze 1662.00 1662.30 0
1996-08-28 Bridge Plug, No Cement 1656.00 1656.50 0

For data sources see[5]



References