X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0765213616000

Well Details

Well ID: 0765213616000
Loading map...
Location: 00/16-36-076-21W5/0
Location Alias: 00/16-36-76-21 W5M
Location Alias 2: 00/16-36-076-21 W5/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 5
Range: 21
Section: 36
County/Municipality: Municipal District of Smoky River No. 130
Well Name: GALLEON GVILLEE 16-36-76-21
Operator Name: Long Run Exploration Ltd.
License Number: 0118275
License Date: 1985-10-09
License Status: Abandoned
Spud Date: 1985-10-23
Final Drill Date: 1985-11-04
Well Total Depth: 1158.00 m
Surface Hole Latitude: 55.632505
Surface Hole Longitude: -117.110978

For data sources see[1][2]

Well History

Date Event
1985-10-09 Obtained License
1985-10-25 Surface Casing Operation Performed
1985-10-29 Drill Stem Test Performed
1985-10-31 Drill Stem Test Performed
1985-11-02 Drill Stem Test Performed
1985-11-03 Drill Stem Test Performed
1985-11-04 Finished Drilling
1985-11-04 Well Log Performed
1985-11-05 Drill Stem Test Performed
1985-11-05 Well Log Performed
1985-11-06 Drill Stem Test Performed
1985-11-07 Production Casing Operation Performed
1985-11-07 Rig Released
1985-12-16 Well Log Performed
1985-12-18 Perforation Treatment Performed - Jet Perforation
1985-12-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-12-23 Well Log Performed
1985-12-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-12-24 Plug Back Performed
1985-12-31 Perforation Treatment Performed - Jet Perforation
1986-01-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-06-28 Well Mode changed to Drilled and Cased
1986-07-02 Well Log Performed
1987-02-12 Perforation Treatment Performed - Jet Perforation
1987-02-12 Well Log Performed
1987-02-13 Perforation Treatment Performed - Cement Squeeze
1987-02-17 Perforation Treatment Performed - Jet Perforation
1987-02-17 Well Log Performed
1987-02-18 Perforation Treatment Performed - Fractured
1987-02-18 Well Log Performed
1987-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-04-01 Well Began Production
1987-04-01 Well Fluid changed to Gas
1987-04-01 Well Mode changed to Flowing
1988-10-01 Well Fluid changed to Gas
1988-10-01 Well Mode changed to Suspended
2000-08-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-08-16 Plug Back Performed
2000-08-21 Well Abandoned
2000-08-21 Well Fluid changed to Gas
2000-08-21 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-12-18 Perforation 1116.50 1118.50 13
1987-02-18 Fracture 1084.00 1086.00 0
1987-02-20 Acid Treatment 1084.00 1086.00 0
1987-02-24 Acid Treatment 1084.00 1086.00 0
2000-08-16 Packing Device Capped w/Cement 1071.50 1081.00 0
1985-12-19 Acid Treatment 1116.50 1118.50 0
1985-12-20 Acid Treatment 1116.50 1118.50 0
1985-12-24 Packing Device Capped w/Cement 1105.00 1113.00 0
1985-12-31 Perforation 1084.00 1087.50 13
1986-01-01 Acid Treatment 1084.00 1087.50 0
1987-02-12 Perforation 1093.50 1094.50 13
1987-02-13 Cement Squeeze 1084.00 1094.50 0
1987-02-17 Perforation 1084.00 1086.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 3590 0.0 0.0 0.0
1988 575 0.0 0.0 0.0

For data sources see[5]

References