X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0764070114030

Well Details

Well ID: 0764070114030
Loading map...
Location: 03/14-01-076-07W4/0
Location Alias: 03/14-01-76-07 W4M
Location Alias 2: 03/14-01-076-07 W4/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 4
Range: 07
Section: 01
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: HARVEST HZ 102 P5 LEISMER 14-1-76-7
Operator Name: Harvest Operations Corp.
License Number: 0434888
License Date: 2011-07-05
License Status: Issued
Spud Date: 2011-11-16
Final Drill Date: 2012-04-07
Well Total Depth: 1528.00 m
Surface Hole Latitude: 55.571706
Surface Hole Longitude: -110.959321

For data sources see[1][2]

Well History

Date Event
2011-07-05 Obtained License
2011-11-15 Well Log Performed
2011-11-16 Direction Drilling Operation Performed - Deviate
2011-11-17 Surface Casing Operation Performed
2012-02-27 Direction Drilling Operation Performed - Horizontal
2012-02-28 Well Log Performed
2012-02-29 Intermediate Casing Operation Performed
2012-04-07 Finished Drilling
2012-04-07 Well Log Performed
2012-04-07 Well Mode changed to Drilled and Cased
2012-04-08 Liner Casing Operation Performed
2012-04-08 Perforation Treatment Performed - Open-Hole Completion
2012-04-08 Perforation Treatment Performed - Slotted Liner or Casing
2012-04-08 Rig Released
2014-09-25 Well Began Production
2014-09-25 Well Fluid changed to Crude Bitumen
2014-09-25 Well Mode changed to Flowing
2014-12-01 Well Fluid changed to Crude Bitumen
2014-12-01 Well Mode changed to Suspended
2018-06-18 Well Type changed to Steam Assisted Gravity Drain

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-04-06 Nabors Drilling Limited 103 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2011-11-16 100.40 Deviate (5 - 79 degrees)
2012-02-27 591.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-04-08 Slotted Liner 739.00 1523.00 0
2012-04-08 Open Hole/Barefoot Completion 1523.00 1528.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 24 0.0 0.0 0.0
2018 4057 0.0 0.0 0.0
2019 7605 0.0 0.0 0.0
2020 2179 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-04-08 No Incident Encountered 0.00 0.00

For data sources see[8]

References