If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0764061510150 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.593839,"lon":-110.832582,"icon":""}]} |
Location: 15/10-15-076-06W4/0 | |
Location Alias: 15/10-15-76-06 W4M | |
Location Alias 2: 15/10-15-076-06 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 4 | |
Range: 06 | |
Section: 15 | |
County/Municipality: Regional Municipality of Wood Buffalo | |
Well Name: CVE FCCL L03P09 LEISMER 10-15-76-6 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0472666 | |
License Date: 2014-12-04 | |
License Status: Suspension | |
Spud Date: 2015-02-25 | |
Final Drill Date: 2015-03-24 | |
Well Total Depth: 1518.00 m | |
Surface Hole Latitude: 55.593839 | |
Surface Hole Longitude: -110.832582 |
Date | Event |
---|---|
2014-12-04 | Obtained License |
2015-01-17 | Conductor Casing Operation Performed |
2015-02-25 | Direction Drilling Operation Performed - Deviate |
2015-02-25 | Surface Casing Operation Performed |
2015-02-25 | Well Mode changed to Preset |
2015-03-15 | Well Log Performed |
2015-03-19 | Direction Drilling Operation Performed - Horizontal |
2015-03-19 | Well Log Performed |
2015-03-20 | Intermediate Casing Operation Performed |
2015-03-24 | Finished Drilling |
2015-03-24 | Perforation Treatment Performed - Open-Hole Completion |
2015-03-24 | Perforation Treatment Performed - Slotted Liner or Casing |
2015-03-24 | Well Log Performed |
2015-03-24 | Well Mode changed to Drilled and Cased |
2015-03-25 | Liner Casing Operation Performed |
2015-03-25 | Rig Released |
2015-04-29 | Well Log Performed |
2018-05-01 | Well Began Production |
2018-05-01 | Well Type changed to Steam Assisted Gravity Drain |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2015-03-18 | Precision Drilling Corporation | 395 | N/A | Resumption |
2015-02-25 | Precision Drilling Corporation | 395 | N/A | Set Surface |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2015-02-25 | 69.50 | Deviate (5 - 79 degrees) |
2015-03-19 | 646.60 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-03-24 | Open Hole/Barefoot Completion | 1508.00 | 1518.00 | 0 |
2015-03-24 | Slotted Liner | 735.00 | 1508.00 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 3803 | 0.0 | 0.0 | 0.0 |
2019 | 7677 | 0.0 | 0.0 | 0.0 |
2020 | 2182 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-03-23 | No Incident Encountered | 0.00 | 0.00 |
2015-03-25 | No Incident Encountered | 0.00 | 0.00 |
2015-04-29 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]