X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0764061502270

Well Details

Well ID: 0764061502270
Loading map...
Location: 27/02-15-076-06W4/0
Location Alias: 27/02-15-76-06 W4M
Location Alias 2: 27/02-15-076-06 W4/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 4
Range: 06
Section: 15
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: CVE B01P06-1 LEISMER 2-15-76-6
Operator Name: Cenovus Energy Inc.
License Number: 0492625
License Date: 2018-12-06
License Status: Issued
Spud Date: 2019-01-03
Final Drill Date: 2019-01-06
Well Total Depth: 1691.00 m
Surface Hole Latitude: 55.581708
Surface Hole Longitude: -110.866048

For data sources see[1][2]

Well History

Date Event
2018-12-06 Obtained License
2019-01-04 Direction Drilling Operation Performed - Deviate
2019-01-04 Surface Casing Operation Performed
2019-01-05 Direction Drilling Operation Performed - Horizontal
2019-01-05 Intermediate Casing Operation Performed
2019-01-05 Well Log Performed
2019-01-06 Finished Drilling
2019-01-06 Well Log Performed
2019-01-06 Well Mode changed to Drilled and Cased
2019-01-07 Liner Casing Operation Performed
2019-01-07 Perforation Treatment Performed - Open-Hole Completion
2019-01-07 Perforation Treatment Performed - Slotted Liner or Casing
2019-01-07 Rig Released
2019-01-07 Well Log Performed
2019-01-15 Well Log Performed
2019-03-02 Well Began Production
2019-03-02 Well Type changed to Steam Assisted Gravity Drain

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-01-04 Precision Drilling Corporation 199 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-01-04 103.70 Deviate (5 - 79 degrees)
2019-01-05 409.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-01-07 Slotted Liner 802.00 1681.00 0
2019-01-07 Open Hole/Barefoot Completion 1681.00 1691.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 6698 0.0 0.0 0.0
2020 2179 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-07 No Incident Encountered 0.00 0.00
2019-01-28 No Incident Encountered 0.00 0.00

For data sources see[8]

References