X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0764061502140

Well Details

Well ID: 0764061502140
Loading map...
Location: 14/02-15-076-06W4/0
Location Alias: 14/02-15-76-06 W4M
Location Alias 2: 14/02-15-076-06 W4/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 4
Range: 06
Section: 15
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: CVE FCCL B01W05 LEISMER 2-15-76-6
Operator Name: Cenovus Energy Inc.
License Number: 0457935
License Date: 2013-07-09
License Status: Amended
Spud Date: 2013-07-13
Final Drill Date: 2013-07-31
Well Total Depth: 1572.00 m
Surface Hole Latitude: 55.581811
Surface Hole Longitude: -110.864680

For data sources see[1][2]

Well History

Date Event
2013-07-09 Obtained License
2013-07-13 Direction Drilling Operation Performed - Deviate
2013-07-14 Surface Casing Operation Performed
2013-07-19 Well Log Performed
2013-07-20 Direction Drilling Operation Performed - Horizontal
2013-07-20 Well Log Performed
2013-07-21 Intermediate Casing Operation Performed
2013-07-31 Finished Drilling
2013-07-31 Well Log Performed
2013-07-31 Well Mode changed to Drilled and Cased
2013-08-01 Liner Casing Operation Performed
2013-08-01 Perforation Treatment Performed - Open-Hole Completion
2013-08-01 Perforation Treatment Performed - Slotted Liner or Casing
2013-08-01 Rig Released
2013-08-01 Well Log Performed
2013-10-07 Well Log Performed
2014-09-20 Well Began Production
2014-09-20 Well Type changed to Steam Assisted Gravity Drain

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-07-13 Akita Drilling Ltd. 27 N/A Set Surface
2013-07-19 Akita Drilling Ltd. 27 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-07-13 86.80 Deviate (5 - 79 degrees)
2013-07-20 671.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-08-01 Slotted Liner 747.00 1557.00 0
2013-08-01 Open Hole/Barefoot Completion 1557.00 1572.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 2133 0.0 0.0 0.0
2015 8720 0.0 0.0 0.0
2016 8430 0.0 0.0 0.0
2017 7920 0.0 0.0 0.0
2018 6610 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-08-01 No Incident Encountered 0.00 0.00
2014-07-09 No Incident Encountered 0.00 0.00

For data sources see[8]

References