If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0764061115030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.586878,"lon":-110.811137,"icon":""}]} |
Location: 03/15-11-076-06W4/0 | |
Location Alias: 03/15-11-76-06 W4M | |
Location Alias 2: 03/15-11-076-06 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 4 | |
Range: 06 | |
Section: 11 | |
County/Municipality: Regional Municipality of Wood Buffalo | |
Well Name: CVE FCCL B04P01 LEISMER 15-11-76-6 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0407985 | |
License Date: 2009-01-15 | |
License Status: Issued | |
Spud Date: 2010-03-13 | |
Final Drill Date: 2010-04-23 | |
Well Total Depth: 1610.00 m | |
Surface Hole Latitude: 55.586878 | |
Surface Hole Longitude: -110.811137 |
Date | Event |
---|---|
2009-01-15 | Obtained License |
2010-03-13 | Direction Drilling Operation Performed - Horizontal |
2010-03-13 | Surface Casing Operation Performed |
2010-04-14 | Well Log Performed |
2010-04-17 | Intermediate Casing Operation Performed |
2010-04-23 | Finished Drilling |
2010-04-23 | Perforation Treatment Performed - Open-Hole Completion |
2010-04-23 | Perforation Treatment Performed - Slotted Liner or Casing |
2010-04-23 | Well Mode changed to Drilled and Cased |
2010-04-24 | Liner Casing Operation Performed |
2010-04-25 | Rig Released |
2010-06-20 | Well Log Performed |
2011-06-01 | Well Began Production |
2011-06-01 | Well Type changed to Steam Assisted Gravity Drain |
2011-06-20 | Well Log Performed |
2015-07-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-03-13 | 94.30 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-04-23 | Open Hole/Barefoot Completion | 1595.00 | 1610.00 | 0 |
2010-04-23 | Slotted Liner | 809.00 | 1595.00 | 0 |
2015-07-24 | Acid Treatment | 818.30 | 1594.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 2448 | 0.0 | 0.0 | 0.0 |
2012 | 8540 | 0.0 | 0.0 | 0.0 |
2013 | 8202 | 0.0 | 0.0 | 0.0 |
2014 | 8447 | 0.0 | 0.0 | 0.0 |
2015 | 8521 | 0.0 | 0.0 | 0.0 |
2016 | 7911 | 0.0 | 0.0 | 0.0 |
2017 | 8528 | 0.0 | 0.0 | 0.0 |
2018 | 8477 | 0.0 | 0.0 | 0.0 |
2019 | 7544 | 0.0 | 0.0 | 0.0 |
2020 | 1680 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-07-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]