X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0764061111200

Well Details

Well ID: 0764061111200
Loading map...
Location: 20/11-11-076-06W4/0
Location Alias: 20/11-11-76-06 W4M
Location Alias 2: 20/11-11-076-06 W4/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 4
Range: 06
Section: 11
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: CVE FCCL B05P05-1 LEISMER 11-11-76-6
Operator Name: Cenovus Energy Inc.
License Number: 0488640
License Date: 2018-03-23
License Status: Issued
Spud Date: 2018-04-03
Final Drill Date: 2018-04-15
Well Total Depth: 1422.00 m
Surface Hole Latitude: 55.580260
Surface Hole Longitude: -110.819186

For data sources see[1][2]

Well History

Date Event
2018-03-23 Obtained License
2018-04-03 Conductor Casing Operation Performed
2018-04-08 Direction Drilling Operation Performed - Deviate
2018-04-09 Surface Casing Operation Performed
2018-04-13 Direction Drilling Operation Performed - Horizontal
2018-04-13 Well Log Performed
2018-04-14 Intermediate Casing Operation Performed
2018-04-15 Finished Drilling
2018-04-15 Liner Casing Operation Performed
2018-04-15 Perforation Treatment Performed - Open-Hole Completion
2018-04-15 Perforation Treatment Performed - Slotted Liner or Casing
2018-04-15 Rig Released
2018-04-15 Well Log Performed
2018-04-15 Well Mode changed to Drilled and Cased
2018-04-21 Well Log Performed
2018-05-21 Well Began Production
2018-05-21 Well Type changed to Steam Assisted Gravity Drain

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-04-08 Precision Drilling Corporation 199 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-04-08 104.60 Deviate (5 - 79 degrees)
2018-04-13 555.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-04-15 Slotted Liner 626.00 1412.00 0
2018-04-15 Open Hole/Barefoot Completion 1412.00 1422.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 5378 0.0 0.0 0.0
2019 8020 0.0 0.0 0.0
2020 2181 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-04-15 No Incident Encountered 0.00 0.00
2018-05-04 No Incident Encountered 0.00 0.00

For data sources see[8]

References