X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0764061111100

Well Details

Well ID: 0764061111100
Loading map...
Location: 10/11-11-076-06W4/0
Location Alias: 10/11-11-76-06 W4M
Location Alias 2: 10/11-11-076-06 W4/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 4
Range: 06
Section: 11
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: CVE FCCL B05W04 LEISMER 11-11-76-6
Operator Name: Cenovus Energy Inc.
License Number: 0464032
License Date: 2014-01-17
License Status: Issued
Spud Date: 2014-02-25
Final Drill Date: 2014-03-27
Well Total Depth: 1457.00 m
Surface Hole Latitude: 55.580790
Surface Hole Longitude: -110.818749

For data sources see[1][2]

Well History

Date Event
2014-01-17 Obtained License
2014-02-14 Conductor Casing Operation Performed
2014-02-25 Direction Drilling Operation Performed - Deviate
2014-02-25 Surface Casing Operation Performed
2014-02-25 Well Mode changed to Preset
2014-03-06 Well Log Performed
2014-03-07 Intermediate Casing Operation Performed
2014-03-07 Well Log Performed
2014-03-25 Direction Drilling Operation Performed - Horizontal
2014-03-27 Finished Drilling
2014-03-27 Liner Casing Operation Performed
2014-03-27 Perforation Treatment Performed - Open-Hole Completion
2014-03-27 Perforation Treatment Performed - Slotted Liner or Casing
2014-03-27 Well Log Performed
2014-03-27 Well Mode changed to Drilled and Cased
2014-03-28 Rig Released
2014-04-29 Well Log Performed
2015-08-06 Well Began Production
2015-08-06 Well Type changed to Steam Assisted Gravity Drain

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-02-25 Akita Drilling Ltd. 27 N/A Set Surface
2014-03-25 Akita Drilling Ltd. 27 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-02-25 104.50 Deviate (5 - 79 degrees)
2014-03-25 583.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-03-27 Open Hole/Barefoot Completion 1442.00 1457.00 0
2014-03-27 Slotted Liner 442.00 1442.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 2853 0.0 0.0 0.0
2016 6294 0.0 0.0 0.0
2017 7893 0.0 0.0 0.0
2018 8736 0.0 0.0 0.0
2019 7667 0.0 0.0 0.0
2020 2145 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-03-07 No Incident Encountered 0.00 0.00
2014-03-28 No Incident Encountered 0.00 0.00

For data sources see[8]

References