If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0764061008070 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.572881,"lon":-110.849798,"icon":""}]} |
Location: 07/08-10-076-06W4/0 | |
Location Alias: 07/08-10-76-06 W4M | |
Location Alias 2: 07/08-10-076-06 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 4 | |
Range: 06 | |
Section: 10 | |
County/Municipality: Regional Municipality of Wood Buffalo | |
Well Name: CVE FCCL H03P11 LEISMER 8-10-76-6 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0464323 | |
License Date: 2014-01-23 | |
License Status: Amended | |
Spud Date: 2014-05-11 | |
Final Drill Date: 2014-06-25 | |
Well Total Depth: 1461.00 m | |
Surface Hole Latitude: 55.572881 | |
Surface Hole Longitude: -110.849798 |
Date | Event |
---|---|
2014-01-23 | Obtained License |
2014-04-14 | Conductor Casing Operation Performed |
2014-05-11 | Direction Drilling Operation Performed - Deviate |
2014-05-11 | Well Mode changed to Preset |
2014-05-12 | Surface Casing Operation Performed |
2014-06-10 | Direction Drilling Operation Performed - Horizontal |
2014-06-10 | Well Log Performed |
2014-06-11 | Intermediate Casing Operation Performed |
2014-06-25 | Finished Drilling |
2014-06-25 | Well Log Performed |
2014-06-25 | Well Mode changed to Drilled and Cased |
2014-06-26 | Liner Casing Operation Performed |
2014-06-26 | Perforation Treatment Performed - Open-Hole Completion |
2014-06-26 | Perforation Treatment Performed - Slotted Liner or Casing |
2014-06-26 | Rig Released |
2014-08-13 | Well Log Performed |
2014-09-18 | Well Log Performed |
2016-08-22 | Well Began Production |
2016-08-22 | Well Type changed to Steam Assisted Gravity Drain |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2014-05-11 | 91.90 | Deviate (5 - 79 degrees) |
2014-06-10 | 666.40 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-06-26 | Slotted Liner | 745.00 | 1413.00 | 0 |
2014-06-26 | Open Hole/Barefoot Completion | 1413.00 | 1461.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2016 | 956 | 0.0 | 0.0 | 0.0 |
2017 | 8134 | 0.0 | 0.0 | 0.0 |
2018 | 8508 | 0.0 | 0.0 | 0.0 |
2019 | 8653 | 0.0 | 0.0 | 0.0 |
2020 | 2130 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-05-12 | No Incident Encountered | 0.00 | 0.00 |
2014-06-26 | No Incident Encountered | 0.00 | 0.00 |
2014-09-26 | No Incident Encountered | 0.00 | 0.00 |
2014-11-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]