X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0764060216070

Well Details

Well ID: 0764060216070
Loading map...
Location: 07/16-02-076-06W4/0
Location Alias: 07/16-02-76-06 W4M
Location Alias 2: 07/16-02-076-06 W4/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 4
Range: 06
Section: 02
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: CVE FCCL J07P01 KIRBY 16-2-76-6
Operator Name: Cenovus Energy Inc.
License Number: 0473167
License Date: 2014-12-15
License Status: Suspension
Spud Date: 2015-12-02
Final Drill Date: 2016-01-23
Well Total Depth: 1815.00 m
Surface Hole Latitude: 55.548200
Surface Hole Longitude: -110.815999

For data sources see[1][2]

Well History

Date Event
2014-12-15 Obtained License
2015-11-06 Conductor Casing Operation Performed
2015-12-02 Direction Drilling Operation Performed - Deviate
2015-12-02 Well Mode changed to Preset
2015-12-03 Surface Casing Operation Performed
2015-12-08 Direction Drilling Operation Performed - Horizontal
2015-12-08 Well Log Performed
2015-12-09 Intermediate Casing Operation Performed
2015-12-19 Well Log Performed
2016-01-23 Finished Drilling
2016-01-23 Liner Casing Operation Performed
2016-01-23 Perforation Treatment Performed - Open-Hole Completion
2016-01-23 Perforation Treatment Performed - Slotted Liner or Casing
2016-01-23 Well Log Performed
2016-01-23 Well Mode changed to Drilled and Cased
2016-01-24 Rig Released
2019-08-19 Well Began Production
2019-08-19 Well Type changed to Steam Assisted Gravity Drain

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-12-02 Precision Drilling Corporation 395 N/A Set Surface
2016-01-22 Precision Drilling Corporation 395 1835 Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-12-02 77.70 Deviate (5 - 79 degrees)
2015-12-08 754.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-01-23 Slotted Liner 838.00 1803.00 0
2016-01-23 Open Hole/Barefoot Completion 1803.00 1815.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 2075 0.0 0.0 0.0
2020 2167 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-12-09 No Incident Encountered 0.00 0.00
2016-01-24 No Incident Encountered 0.00 0.00

For data sources see[8]

References